Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20215K515 + (ML20215K515)
- ML20215K516 + (ML20215K516)
- 05000304/LER-1986-019-05, :on 860920,reactor & Generator Tripped.Caused by Personnel Error During Replacement of High Pressure Turbine Impulse Pressure Transmitter.Disciplinary Action Taken & Procedure Modified + (ML20215K517)
- ML20215K519 + (ML20215K519)
- ML20215K520 + (ML20215K520)
- ML20215K521 + (ML20215K521)
- ML20215K523 + (ML20215K523)
- ML20215K525 + (ML20215K525)
- ML20215K527 + (ML20215K527)
- ML20215K529 + (ML20215K529)
- ML20215K530 + (ML20215K530)
- ML20215K531 + (ML20215K531)
- IA-86-666, Ack Receipt of Re Ongoing Facilities Proceeding. Commission Must Decide Adjudication Solely on Bases of Submissions of Parties & Evaluations of Submissions + (ML20215K533)
- ML20215K533 + (ML20215K533)
- IR 05000062/1987002 + (ML20215K534)
- IR 05000412/1987013 + (ML20215K535)
- ML20215K537 + (ML20215K537)
- ML20215K539 + (ML20215K539)
- ML20215K541 + (ML20215K541)
- ML20215K543 + (ML20215K543)
- ML20215K544 + (ML20215K544)
- U-600895, Forwards Dcrdr Supplemental Summary Rept Providing Progress on Resolving Items Listed in Sser 5 & Rev 0 to Procedure Dcrdr 5.2.Unresolved Items Will Be Addressed in Final Rept Expected within 90 Days of Receipt of Full Power OL + (ML20215K545)
- ML20215K547 + (ML20215K547)
- ML20215K549 + (ML20215K549)
- ML20215K552 + (ML20215K552)
- ML20215K553 + (ML20215K553)
- 05000352/LER-1986-046-01, :on 860923 & 26,main Control Room Ventilation Sys Isolated Due to High Chlorine Concentration Indications. Probably Caused by Rainwater Depositing on Chlorine Analyzer Probes.Related Correspondence + (ML20215K554)
- ML20215K555 + (ML20215K555)
- ML20215K556 + (ML20215K556)
- ML20215K558 + (ML20215K558)
- NRC-87-0023, Requests Registration as User of Model CNS 14-195-H Shipping Cask + (ML20215K559)
- ML20215K560 + (ML20215K560)
- IR 05000322/1987009 + (ML20215K562)
- ML20215K564 + (ML20215K564)
- ML20215K565 + (ML20215K565)
- ML20215K566 + (ML20215K566)
- ML20215K567 + (ML20215K567)
- ML20215K570 + (ML20215K570)
- ML20215K571 + (ML20215K571)
- ML20215K572 + (ML20215K572)
- IR 05000413/1986036 + (ML20215K575)
- 05000259/LER-1986-031, :on 861105,reactor Protection Sys Channel 1A Deenergized When Circuit Protector Tripped Motor Generator Set.Caused by Dirty Voltage Adjustment Potentiometer,Causing Output Voltage to Drop.Potentiometer Cleaned + (ML20215K577)
- ML20215K578 + (ML20215K578)
- ML20215K579 + (ML20215K579)
- IR 05000395/1986017 + (ML20215K580)
- ML20215K581 + (ML20215K581)
- IR 05000321/1986022 + (ML20215K584)
- ML20215K585 + (ML20215K585)
- ML20215K588 + (ML20215K588)
- ML20215K589 + (ML20215K589)
- 05000352/LER-1986-045-01, :on 860910,NSSS Shutoff Sys Isolated Due to Use of Loose Fitting Test Lead During Performance of Surveillance Test.Caused by Personnel Error.Personnel Counseled.Related Correspondence + (ML20215K590)