ML20215K585

From kanterella
Jump to navigation Jump to search
Forwards Safety Insp Rept 50-353/87-02 on 870203-0329 & Notice of Violation.Four Examples Found Where in-process Work Activities Not Performed in Accordance W/Const Procedures.Two Activities Performed by Backshift Personnel
ML20215K585
Person / Time
Site: Limerick Constellation icon.png
Issue date: 05/05/1987
From: Gallo R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Kemper J
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML20215K587 List:
References
NUDOCS 8705110259
Download: ML20215K585 (2)


See also: IR 05000353/1987002

Text

r -

-

..

i,

'0 5 MAY 1987

Docket No. 50-353

Philadelphia Electric Company

ATTN: Mr. John S. Kemper

Senior Vice President

Engineering and Production

2301 Market Street

Philadelphia, PA

19101

Gentlemen:

Subject:

Inspection Report 50-353/87-02

This refers to the routine resident safety inspection by Mr. R. A. Gramm and

J. E. Kaucher on February 3 - March 29,1987 at the Limerick Generating

Station, Unit 2, Limerick, Pennsylvania of activities authorized by NRC

License No. CPPR-107 and to the discussions held by the inspectors with

Mr. P. K. Pavlides and other members of your staff at the conclusion of the

inspection.

Based on the results of this inspection, it appears that certain activities

were not conducted in full compliance with NRC requirements, as set forth in

the Notice of Violation, enclosed as Appendix- A.

Four examples were found where inprocess work activities had not been

performed in accordance with applicable construction procedures. At least two

of the activities were performed by backshift personnel.

A response to this report is required by 10 CFR 2.201, please follow the

instructions in Appendix A in the preparation of your response. The response

directed by Appendix A, Notice of Violation, is not subject to the clearance

procedures of the Office of Management and Budget as required by the Paperwork

Reduction Act of 1980, PL 96-511.

Your cooperation is appreciated.

Sincerely,

Original SiSnod BY 3

L. ai d' DO f t Loltn-

Robert M. Gallo, Chief

Projects Branch No. 2

Division of Reactor Projects

Enclosure:

/

1g Of

1.

Appendix A, Notice of Violation

-

2.

NRC Region I Inspection Report 50-353/87-02

i

0FFICIAL RECORD COPY

IR LIM 2 87-02 - 0001.0.0

!

B705110259 870505

11/29/80

PDR

ADOCK 05000353

O

PDR

i

.

. .

.

.

-

.

.

.

.

.

.

.

.

.

.

--

m

-..Lc.__.J

_,.

~

e.-an

a

-+2

,ww.

j

  • -

.

' Philadelphia Electric Company

2

~0 5 MAY 1987

i

-

,

cc w/ enc 1:

S. J. Kowalski, Vice President, Engineering and Research

W. T. Ullrich, Superintendent, Limerick 2 Project

J. M. Corcoran, QA Manager, Limerick 2 Project

Troy B. Conner, Jr. , Esquire (Receives All 2.790 Information)

Eugene J. Bradley, Esquire, Assistant General Counsel

Public Document Room (PDR)

local Public Document Room (LPOR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

Commonwealth of Pennsylvania

bec:

J. Durr, Branch Chief, DRS

i

SLO

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o enc 1)

Section Chief, RPS 2A

.

1

4

i

l

1

,

!

I

i

I

(

I

RI DRP

RI DRP

)-

P

1

Gramm

Linville

lo

a m

Tsf

.

~ 8'

,

i

i

0FFICIAL RECORD COPY

IR LIM 2 87-02 - 0002.0.0

11/29/80

i

!