A Director, Office of Resource Management April Monthly Operating Report Page 1 ATTACHMENT I AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50/395 UNIT V. C. SUMMER I DATE 5/01/87 COMPLETED BY G. A. LOIGNON TELEPHONE (803) 345-5209 APRIL 1987 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1.
-7 17.
-6 2.
-7 18.
-6 3.
-7 19.
-6 4.
-7 20.
-6 5.
-7 21.
-7 6.
-6 22.
-8 7.
-5 23.
-7 8.
-5 24.
-7
'9.
-5 25.
-8 10.
-5 26.
-7 11.
-6 27.
-7 12.
-5 28.
-6 13.
-6 29.
-7 14.
-5 30.
-7 15.
-6 16.
-6 8705110256 870506 PDR ADOCK 05000395 R
Director, Office of Resource Management
~ April Monthly-Operating. Report Page 2 ATTACHMENT II OPERATING DATA REPORT DOCKET NO.
50/395 UNIT V. C. SUMMER I DATE 5/01/87 I-COMPLETED BY G. A. LOIGNON TELEPHONE (803) 345 5209 OPERATING STATUS 1.-Reporting Period:
April 1987 Gross Hours in Reporting Period:
_ 719-
- 2. Currently Authorized Power Level (MWt): 2775 Max. Depend.. Capacity (MWe-Net):
885 Design Electrical Rating (MWe-Net):-
900
- 3. Power Level to Which Restricted (If Any)(MWe-Net): N/A
- 4. Reasons for Restrictions: N/A THIS MONTH YR TO DATE CUMULATIVE 1
- 5. Number of Hours Reactor Critical 0.0 1557.2 22003.7
- 6. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
- 7. Hours Generator on Line 0.0 1556.2 21547.4
- 8. Unit Reserve Shutdown Hours
-0.0 0.0 0.0 9.GrossThermalEnergyGenerated-(MWH) 0 4,149.036 56,543,356
- 10. Gross Electrical Energy (MWH) 0 1,366,570 18,776,029
- 11. Net Electrical Energy Generated (MWH)
-4510 1,296.322 17,879,599
- 12. Reactor Service Factor 0.0 54.1 75.4
- 13. Reactor Availability Factor 0.0 54.1 75.4
- 14. Unit Service Factor 0.0 54.1 73.8
~15. Unit Availability Factor 0.0 54.1 73.8
- 16. Unit Capacity Factor (Using MDC) 0.0 50.9 69.2
- 17. Unit Capacity Factor (Design MWe) 0.0 50.0 68.1
- 18. Unit Forced Outage Rate 0.0 0.0 6.4
- 19. Shutdowns Scheduled Over Next 6 Months (Type, Date & Duration of Each):
- 20. If Shut Down at End of Report Period, Estimated Date of Startup:
MAY 14, 1987
- 21. Units in Test Status (Prior to Commercial Operation): N/A 3
Director, Office of Resource Management April Monthly Operating Report Page 3 ATTACHMENT III UNIT SHUT 00WNS AND POWER REDUCTIONS DOCKET NO.
50/395 UNIT V. C. SUMMER I DATE 5/01/87 COMPLETED BY G. A. LOIGNON TELEPHONE (803) 345-5209 APRIL 1987 Method of TYPE Shutting F or S Duration Down the Corrective Actions /
No.
Date Reason Forced or (Hours)
Reactor or Comments Scheduled Reducing Power 2
870306 S
719.0*
C 2
REFUELING OUTAGE 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> lost due to the daylight savings time change.
Director, Office of Resource Management
' April Monthly Operating Report Page 4 ATTACHMENT IV NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO.
50/395 UNIT V. C. SUMMER I DATE 5/01/87 COMPLETED BY G. A. LOIGNON TELEPHONE (803) 345-5209 APRIL 1987 The V. C. Summer Station was shutdown for refueling the entire month of April 1987.
Preparations are being made for restart in May.
$