Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20215F093 + (ML20215F093)
- ML20215F095 + (ML20215F095)
- ML20215F096 + (ML20215F096)
- IR 05000317/1986024 + (ML20215F097)
- ML20215F098 + (ML20215F098)
- ML20215F099 + (ML20215F099)
- ML20215F101 + (ML20215F101)
- ML20215F102 + (ML20215F102)
- ML20215F103 + (ML20215F103)
- ML20215F105 + (ML20215F105)
- ML20215F106 + (ML20215F106)
- ML20215F108 + (ML20215F108)
- ML20215F110 + (ML20215F110)
- IR 05000424/1986034 + (ML20215F113)
- ML20215F114 + (ML20215F114)
- ML20215F116 + (ML20215F116)
- ML20215F117 + (ML20215F117)
- IR 05000369/1986014 + (ML20215F118)
- ML20215F119 + (ML20215F119)
- IR 05000458/1986010 + (ML20215F120)
- ML20215F121 + (ML20215F121)
- ML20215F122 + (ML20215F122)
- ML20215F123 + (ML20215F123)
- ML20215F124 + (ML20215F124)
- ML20215F125 + (ML20215F125)
- ML20215F129 + (ML20215F129)
- ML20215F130 + (ML20215F130)
- ML20215F134 + (ML20215F134)
- 05000289/LER-1986-012-01, :on 860904,exhaust Duct Grill in Switchgear Room 1D Found Blanked Off,Blocking Air Flow from Room.Caused by Personnel Error.Fire Watches Established + (ML20215F135)
- ML20215F136 + (ML20215F136)
- ML20215F137 + (ML20215F137)
- ML20215F138 + (ML20215F138)
- ST-HL-AE-2253, Final Deficiency Rept Re Reactor Vessel Temporary Full Flow Filters.Initially Reported on 870406.Data Gathered & Analyzed to Establish Weight of Missing Screen Matl.Matl Does Not Constitute Threat to Safe Operation of Plant + (ML20215F139)
- ML20215F140 + (ML20215F140)
- TXX-6012, Interim Deficiency Rept CP-86-63 Re Broken Cotter Pin on End of Clamp on Snubber.Initially Reported on 860904.Evaluation Continuing.Next Rept Will Be Submitted by 861017 + (ML20215F141)
- ML20215F142 + (ML20215F142)
- ML20215F143 + (ML20215F143)
- ML20215F146 + (ML20215F146)
- ML20215F147 + (ML20215F147)
- ML20215F148 + (ML20215F148)
- ML20215F149 + (ML20215F149)
- ML20215F151 + (ML20215F151)
- ML20215F152 + (ML20215F152)
- ML20215F156 + (ML20215F156)
- ML20215F159 + (ML20215F159)
- ML20215F161 + (ML20215F161)
- IR 05000327/1986054 + (ML20215F163)
- ML20215F166 + (ML20215F166)
- 05000409/LER-1986-026, :on 860910,spike Occurred on wide-range Nuclear Instrumentation Channel 5 When Range Switch Upscaled During Startup.Caused by Damaged Balance Pot Screw.Pot Balanced + (ML20215F167)
- IR 05000423/1987010 + (ML20215F168)
- IA-86-576, Partially Withheld Details of Insp Repts 70-0925/82-02 & 70-1193/82-02.No Noncompliance Noted.Major Areas Inspected: Security Organization,Training,Guard Qualification,Physical Barriers,Intrusion & Detection Alarms & Key Control + (ML20215F169)