Text
$
Cormonwealth Edison Company Docket Nos. 50-295; 50-304 As a result of the inspection conducted on July 9,10, and 29,1986, and in accordance with 10 CFR Part 2 Appendix C - General Statement of Policy and Procedure for NRC Enforcement Actions (1985), the following violation was identified:
10 CFR 50.49 Paragraph (f) requires each item of electrical equipment important to safety to be qualified by testing and/or analysis.
Contrary to the above, Raychem Heat Shrinkable Tubing (HST) used in 10 CFR 50.49 designated applications was installed in unqualified configurations.
Deficiencies included 1) improper seal lengths relative to qualified configurations; 2) fiberglass braid material not stripped back from under the splice; and 3) the HST found exceeding specified bend radius.
This is a Severity Level IV violation (Supplement ID).
(50-295/86016-01(DRS));(50-304/86015-01(DRS))
Pursuant to the provisions of 10 CFR 2.201, you are required to submit to this office within thirty days of the date of this Notice a written statement or explanation in reply, including for each violation:
(1) corrective action taken and the results achieved; (2) corrective action to be taken to avoid further violations; and (3) the date when full compliance will be achieved.
Consideration may be given to extending your response tire for good cause shown.
H 1
JUN 151987 Dated J. J. Harrison, Chief Engineering Branch 4
R ADO PDR G
l