ML20215F105

From kanterella
Jump to navigation Jump to search
Rept of 850802 Interview W/R Spangler in Dallas,Tx Re Knowledge of Mgt Analysis Co Rept
ML20215F105
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 08/05/1985
From: Griffin H
NRC OFFICE OF INVESTIGATIONS (OI)
To:
Shared Package
ML20214X072 List:
References
NUDOCS 8610160084
Download: ML20215F105 (1)


Text

, _ .

._ _.. 3  ; . - 3 _

y-~ (_

. :. .: 4-85-008

i

/ ~ REPORT OF' INTERVIEW

.- WITH ROBERT SPANGLER On August 2,1985 Robert SPANGLER TUGC0 Supervisor of QA Services, was -

interviewed by NRC Investigator H. Brooks GRIFFIN in Dallas, Texas. SPANGLER was represented during this interview by Robert WOOLDRIDGE, attorney.

SPANGLER said he had been a TUGC0 employee for three years and had joined the QA group in May 1984.

  • SPANGLER was questioned about his knowledge o.f the 1978 MAC report, and said

, that Andy JONES (Texas Utilities attorney) notified him in 1985 that he had discovered the existence of the 1978 MAC report during the prudency audit.

SPANGLER said that he told J0NES during their discussion that he believed a decision had been made within the utility that the MAC report was proprietary. "

SPANGLER said he suggested to J0NES that he consult David CHAPMAN (TUGC0 QA Manager) .to determine how the MAC report related to the requirements of the prudency audit.

produce the MAC SPANGLER report to thesaid he was not aware of who made the decision to ASLB. SPANGLER said that at the time JONES approached him with the MAC report, he was not aware of the relationship between the MAC report and the intervenor's 1980 request. SPANGLER said he first became aware of the existance of the MAC report in about May 1984 when he first joined the QA group.

,Q) ' PATE PREPARED IN DRAFT FROM NOTES TAKEN DURING INTERVIEW 0F 08/05/85 G610160004 860922 PDR ADOCK 05000445 A PDR Q,

i  !

. .