O June 16, 1987 Docket No.: 50-424 Mr. James P. O'Reilly Senior Vice President - Nuclear Operations Georgia Power Company P.O. Box 4545 Atlanta, Georgia 30302
Dear Mr. O'Reilly:
Subject:
Vogtle Unit 1 Operating History Since receiving its full-pcwer. license on March 16, 1987 Vogtle Unit I has experienced 19 reactor trips and numerous engineered safety features (ESF)
Both NRR and Region II have been observing the recent Vogtle actuations, operating history with increasing concern as evidenced by management meetings of April 28 and June 11, 1987, and the revised inspection program. However, while each of the meetings provided an assessment of individual events, en NRC concern still exists as to whether Georgia Power Company has taken a sufficiently broad view to assess the totality of the Vogtle Unit 1 events.. Accordingly, we are requesting a report which discusses an overall integrated evaluation of Such a report should include, but the trips, ESF actuations, and other events.
is not limited to, the role of the Independent Safety Engineering Group (ISEG) or other similar interdisciplinary team and a discussion of potential organ-izational, interface, and interdisciplinary problems. This report should not focus on the specifics of events but rather should strive to uncover any under-lying commonality among events.
We request that this report be provided within 30 days of the date of this letter and that you be prepared to discuss your progress at the June 30 meeting at the site.
Sincerely,
/9 Steven. Varga, Director Division of Reactor Projects I/II Office of Nuclear Reactor Regulation cc: See next page DISTRIBUTIC A Gocket Ftte_ )
PDII-3 Reading MDuncan Local PDR BJYoungblood Reading ACRS(10)
NRC PDR MMiller EJordan JPartlow F. Miraglia J. Sniezek T. Murley S. Varga/G. Lainas J. Rogge L.Reyp[
M. Sinkule M. Ernst h N PI/II DRPI/II PDIh/DRPI/II PC M I $er/ rad b])od ((]
d MDtincan BJ f
O g/87 06//g/87 06'
.A2{aph j#
4-
@i G
Va a-06/
7 1
061/
u y
Mr. J. P. O'Reilly.
Georgia Power Company Vogtle Electric Generating Plant i
CC:
Mr. L. T. Gucwa Resident Inspector Chief Nuclear Engineer Nuclear Regulatory Commission Georgia Power Company P. O. Box 572 P.O. Box 4545 Waynesboro, Georgia 30830 Atlanta, Georgia 30302 Mr. Ruble A. Thomas Deppish Kirkland, III, Counsel Vice President - Licensing Office of the Consumers' Utility Vogtle Projer,t Council Georgia Power Company /
Suite 225 Southern Company Services, Inc.
32 Peachtree Street, N.W.
P.O. Box 2625 Atlanta, Georgia 30303 Birmingham, Alabama 35202 James E. Joiner Mr. Paul D. Rice Troutman, Sanders, Lockerman, Vice President & Project General Manager
& Ashmore Georgia Power Company Candler Building Post Office Box 299A, Route 2 127 Peachtree Street, N.E.
Waynesboro, Georgia 30830 Atlanta, Georgia 30303 Danny Feig Mr. J. A. Bailey 1130 Alta Avenue Project Licensing Manager Atlanta, Georgia 30307 Southern Company Services, Inc.
P.O. Box 2625 Carol Stangler Binningham, Alabama 35202 Georgians Against Nuclear Energy 425 Euclid Terrace Ernest L. Blake, Jr.
Atlanta, Georgia 30307 Bruce W. Churchill, Esq.
Shaw, Pittman, Potts and Trowbridge 2300 N Street, N.W.
Washington, D. C.
20037 Mr. G. Bockhold, Jr.
Vogtle Plant Manager Georgia Power Company Route 2. Box 299-A Waynesboro, Georgia 30830 Regional Administrator, Region II U.S. Nuclear Regulatory Commission 101 Marietta Street, N.W., Suite 2900 Atlanta, Georgia 30323 Mr. R. E. Conway i
Senior Vice President and Project Director Georgia Power Company Rt. 2, P. O. Box 299A Waynesboro, Georgia 30830 1
l E