Forwards Insp Repts 50-327/86-54 & 50-328/86-54 on 861006-10.Violation Discussed in Paragraph 6 of Encl Rept Previously Identified During 860806-0905 Insp.Paragraph 13 Describes Items Requiring Action Prior to Restart
ML20215F152
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 12/18/1986
From: Zech G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: White S
TENNESSEE VALLEY AUTHORITY
Shared Package
ML20215F155 List:
References
NUDOCS 8612230284
Download: ML20215F152 (2)


See also: IR 05000327/1986054

Text

-

.. -~ 0Oi'hi&l

=

.

DEC 18 E66

Docket Nos. 50-327, 50-328

License Nos. DPR-77, DPR-79

Tennespej Valley Authority

ATTN: W r. S. A. White

Manager of Nuclear Power

6N 38A Lookout Place

1101 Market Street

Chattancoga, TN 37402-2801

Gentlemen:

SUBJECT: NRC INSPECTION REPORT h0S. 50-327/86-54 AND 50-328/86-54

This refers to the Nuclear' Regulatory Commission (NRC) inspection conducted by

R. E. Weddington on October 6-10, 1986. The inspection included a review of

activities authorized for your Sequoyah facility related to health physics and

radiological control procedures. At the conclusion of the inspection, the

findings were discussed with those members of your staff identified in the

enclosed inspection report.

Areas examined during the inspection are identified in the report. Within these

areas, the inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, and observation of activities

in progress.

The inspection findings indicate that certain activities violated NRC require-

ments. The violation discussed in Paragraph 6 of the enclosed inspection report

is an additional example of a violation identified during a Resident Inspector's

inspection conducted August 6 - September 5,1986. The correctiva actions for

this additional example should be included in your response to Inspection Report

No. 50-327/86-46 and 50-328/86-46.

Please note that Paragraph 13 of the enclosed inspection report describes items

requiring licensee action prior to restart.

The enclosed inspection report documents an oral commitment (see Paragraph 8)

made by a licensee representative and discussed in the exit interview. If your

understanding of this commitment differs from the report statements, please

inform this office promptly.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and its enclosure

will be placed in the NRC Public Document Room.

8612230284 861218

PDR ADOCK 05000327

O PDR

-reo/,\

-

.

.

, _ - .

~

. i

'

, .

~ Tennessee Valley Authority 2

The responses directed by this letter and its enclosure are not subject to the

- clearance procedures of the Office of Management and Budget as required by the

Paperwork Reduction Act of 1980, PL 96-511.

Should you have any questions concerning this letter, please contact us.

Sincerely,

Gary G. Zech, Director

Division of TVA Projects

Enclosure:

Inspection Report

cc w/ enc 1:

W L. Abercrombie, Site Director

Jiuoyah l Nuclear Plant

'P

N.R Wallace,

. . Cantrell,Plant

Acting ManagerDirector

, , Nuclear Engineering

4. L. Gridley, Director

. , Nuclear Safety and Licensing

&ff. R. Harding, Site Licensing

Manager

bec w/ enc 1:

~

. Grace,

V.R.Denton,NRR

. L. Thompson, NRR

W

, / . Taylor, IE

W. B. Hayes, 01

W R. Connelly OIA

K

M.P.Barr,RII Resident Inspector

WRC Document Control Desk

gteofTennessee _ -.

_ _ _ _

_._.

!

n ] d 7 4 ^

kCH DCollins J Stohr JUffM Kjjprr

8Bassett:erOddn[f

l

g//j' /l'3 /86 1p/ 1$osd9

f /86 10//d/86 10/ /86 15/ ;/86 2

If/6/86

hth

/ pef 8D

- - -- _ _ _ _ . ___ _ _ _ - - __