Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20215E383 + (ML20215E383)
- ML20215E384 + (ML20215E384)
- ML20215E385 + (ML20215E385)
- ML20215E387 + (ML20215E387)
- ML20215E388 + (ML20215E388)
- ML20215E391 + (ML20215E391)
- ML20215E394 + (ML20215E394)
- ML20215E395 + (ML20215E395)
- IR 05000245/1986023 + (ML20215E396)
- ML20215E397 + (ML20215E397)
- IR 05000498/1987019 + (ML20215E398)
- ML20215E399 + (ML20215E399)
- ML20215E400 + (ML20215E400)
- IR 05000725/2008031 + (ML20215E401)
- ML20215E403 + (ML20215E403)
- ML20215E405 + (ML20215E405)
- ML20215E408 + (ML20215E408)
- ML20215E409 + (ML20215E409)
- 05000482/LER-1986-063, :on 861114,control Room Ventilation Isolation Signal Initiated.Caused by Chlorine Monitor Spurious Spike. Monitor Placed in Bypass for Troubleshooting & Returned to Svc on 861118 + (ML20215E410)
- ML20215E411 + (ML20215E411)
- 05000282/LER-1986-008-01, :on 861116,facility Exceeded 100% Power for One 8 H Shift.Caused by Procedural Inadequacies.Heat Balance Calculation Will Be Done Hourly by Plant Process Computer & Plant Derated to 99.5% Power + (ML20215E412)
- ML20215E413 + (ML20215E413)
- ML20215E415 + (ML20215E415)
- ML20215E417 + (ML20215E417)
- ML20215E419 + (ML20215E419)
- ML20215E420 + (ML20215E420)
- 1CAN128601, Responds to Part I of Notice of Violation & Proposed Imposition of Civil Penalty from Safety Sys Functional Insp Rept 50-313/86-01.Check Valves Installed During 860115 Shutdown.Response to Part II Will Follow within 14 Days + (ML20215E421)
- IR 05000375/1986001 + (ML20215E422)
- ML20215E425 + (ML20215E425)
- ML20215E428 + (ML20215E428)
- ST-HL-AE-2244, Forwards Amend 61 to FSAR for South Texas Project Units 1 & 2.Overview of Revs Listed + (ML20215E429)
- ML20215E431 + (ML20215E431)
- 05000455/LER-1986-002-10, :on 861122,digital Rod Position Indication & Bank Demand Step Counters Differed by More than 12 Steps, Requiring Opening of Reactor Trip Breakers.Caused by Defective Detector Encoder Card.Card Replaced + (ML20215E433)
- ML20215E434 + (ML20215E434)
- FVY-86-105, Part 21 Rept Re Design Defect Relating to Limitorque Motor Operators Mfg Prior to 1975.Mfg Contacted & Retrofit Kits Installed on safety-related & nonsafety-related Operators. Addl Info Encl + (ML20215E438)
- IA-86-197, Submits Revised Schedule for 1985-86 SALP Board Meetings for Region V + (ML20215E441)
- ML20215E441 + (ML20215E441)
- ML20215E444 + (ML20215E444)
- ML20215E447 + (ML20215E447)
- ML20215E448 + (ML20215E448)
- ML20215E449 + (ML20215E449)
- ML20215E452 + (ML20215E452)
- ML20215E453 + (ML20215E453)
- ML20215E455 + (ML20215E455)
- ML20215E456 + (ML20215E456)
- ML20215E457 + (ML20215E457)
- ML20215E461 + (ML20215E461)
- ML20215E462 + (ML20215E462)
- IR 05000254/1986019 + (ML20215E463)
- ML20215E464 + (ML20215E464)
- ML20215E465 + (ML20215E465)