Partial Response to FOIA Request for Documents Re Security Sys in White Flint North Bldg.App a Documents Forwarded & Available in Pdr.App B & C Documents Withheld (Ref Exemptions 2 & 5)
ML20215E431
Person / Time
Site: Turkey Point NextEra Energy icon.png
Issue date: 10/02/1986
From: Grimsley D
NRC OFFICE OF ADMINISTRATION (ADM)
To: Till T
KASTLE SYSTEMS, INC.
Shared Package
ML20215E435 List:
References
FOIA-86-588 NUDOCS 8610150295
Download: ML20215E431 (7)


Text

)

<<fms'o,

. q.)polb UNITED STATES E' '3 NUCLEAR REGULATORY COMMISSION

&, :E, WASHINGTON, D. C. 20555 g

OCT2 1986 Mr. Thomas A. Till Kastle Systems, Inc.

1501 Wilson Boulevard IN RESPONSE REFER Arlington, VA 22209 TO F01A-86-588

Dear Mr. Till:

This is in partial response to your letter dated July 31, 1986, in which you requested, pursuant to the Freedom of Information Act (F0IA), documents pertaining to the specifications for the security systems for the White Flint North building.

For your information, my staff has been informed that some of the released records discussed below were prepared very early in the security planning stages for the White Flint North building and may not reflect the current directions of the security programs.

The documents listed on the enclosed Appendix A are being placed in the NRC Public Document Room (PDR),1717 H Street, NW, Washington, DC. You may obtain access by presenting a copy of this letter to the PDR staff or by requesting PDR folder F01A-86-588 in your name.

Portions of the documents listed on the enclosed Appendix B and the entire documents listed on the enclosed Appendix C are Seing withheld from public disclosure pursuant to the exemptions noted M . to the document listings on the enclosed appendices. The nonexempt portion.; of the Appendix B documents are being placed in PDR folder F01A-86-588.

Information withheld from F0IA (5 U.S.C. 552(b)(2)) public disclosure pursuant to Exemption (2) of theand 10 CF relates solely to the internal personnel rules and practices of the agency.

Information withheld pursuant to Exemption (5) of the F0IA (5 U.S.C.

552(b)(5)) and 10 CFR 9.5(a)(5) of the Connission's regulations consists of advice, opinions, and recommendations of the staff concerning the security of l

the White Flint North building.

l Pursuant to 10 CFR 9.9 of the Commission's regulations, it has been determined that the information withheld is exempt from production or disclosure, and that its production or disclosure is contrary to the public interest. The persons responsible for this denial are the undersigned and Mr. Raymond J.

Brady, Director, Division of Security.

l l

l l

I 2 p DR 06101%a..

s.

Ms. Till This denial may be appealed to the Comission's Executive Director for Operations within .30 days from the receipt of this letter. As provided in 10 CFR 9.11, any such appeal must be in writing, addressed to the Executive Director for Operations, U.S. Nuclear Regulatory Comission, Washington, DC 20555, and should clearly state on the envelope and in the letter that it is an " Appeal from an Initial FOIA Decision."

Two documents subject to your request have been referred to the General Services Administration for review. We will communicate with you later concerning these documents.

Sincerely, 6%/ M }

Donnie H. Grimsley, Director Division of Rules and Records Office of Administration

Enclosures:

As stated l

l i

l

F01A-86-588 Appendix A 4

RELEASE DATE DESCRIPTION

1. 1-14-86 A draft two-page listing of "Some Initial Division of Security Thoughts Regarding The White Flint Building."
2. 5-6-86 One-page memo, subject "SSB Input For Meeting With Cooper-Lecky," from D. G. Kidd to F. A. Maturo.
3. 5-12-86 Two-page note with one-page enclosure, subject " White Flint Task Lists," from D. G. Kidd to F. A. Maturo.
4. 5-16-86 One-page graph, entitled " Schedule For Installation of NRC Access Control System WFN, Increment No. 1,"

originated by SSB.

5. 5-28-86 One-page memo, subject " Security Review of White Flint
  1. 1 Building Plans," from F. A. Maturo to R. E. Iselin.
6. 6-13-86 One-page note, subject "WFN Task Schedule," from D. G. Kidd to F. A. Maturo.
7. 7-28-86 Reimbursable Work Authorization for CCTV (One Page)
8. 7-30-86 One-page Letter to Phillip Reidel, GSA, from D. G. Kidd, transmitting two enclosures regarding a turn-key integrated card access control and intrusion detection system (Enclosure 1, one page, is a Reimburs-able Work Authorization. Enclosure 2 is withheld, see

" Withhold In Total.")

9. Undated Three-page untitled, undated listing (graph) of SEC tasks to be performed in association with development of security program at White Flint North.

F0IA-86-588 Appendix B RELEASE IN PART

~DATE DESCRIPTION EXEMPTION

1. 4-14-86 Two-page memo, subject " Security Requirements for 2 White Flint North (WFN) Building," from R. J. Brady to SEC Branch Chiefs, with ten-page enclosure entitled "Ager.da," dated April 9, 1986.
2. 4-25-86 Three-page memo, subject "SEC Tasks List for White 2 Flint North (WFN)," from F. A. Maturo to R. E. Iselin.
3. 5-16-86 One-page memo, subject " White Flint North (WFN)/SEC 2 Space," from R. J. Brady to R. E. Iselin.
4. 7-28-86 Seven-page " Briefing On Security Program for One White 2 Flint North," originated by SEC.
5. 7-31-86 Two-page note, subject " Questions /To Do Items Resulting 2 from Director, SEC, " Briefing On Security Program for One White Flint North," July 29, 1986," from L. Robertson to FAC 1.00.16.
6. Undated Four-page undated listing (graph) entitled "SEC Tasks 2 (NRC Consolidation-White Flint #1)"

F01A-86-588 Appendix C WITHHOLD IN TOTAL DATE DESCRIPTION EXEMPTION

1. 4-7-86 Eight-page document regarding guard services, 2 deployment, and associated costs.
2. 4-15-86 Two-page note, subject " Thoughts On Security 2 Requirements For White Flint North Building,"

from L. Robertson to J. J. Dunleavy.

3. 4-17-86 Two-page note, subject " Options For One White Flint 2 North Building" from L. Robertson to J. J. Dunleavy.
4. 6-20-86 One-page note with one-page enclosure, subject 5

" Contractor Projection For Cost of Proposed Security At WFN," from R. A. Dopp to R. J. Brady.

5. 6-30-86 Thirty-seven page document, entitled "U. S. Nuclear 5 Regulatory Commission Comprehensive Security Flan For White Flint One Building."
6. 7-11-86 One-page letter from R. E. Iselin to W. B. Jenkins, GSA, 2 regarding the need for key card doors on levels A and 2, and fire safety.
7. 7-22-86 Two-page memo with six-page enclosure, from R. J. Brady 2 to R. E. Iselin, subject " Security Review of White Flint
  1. 1 Building Plans."
8. 7-30-86 One-page memo, subject " Audio Requirement for SCIF 2 Conference Room," from R. J. Brady to R. E. Iselin.
9. Undated Four one-page undated documents: 2
1. "Generai Requirements For a Vault-Type Room Used For Storage of Classified Material."
2. " General Requirements For NRC Space On A Level."
3. " General Requirements For 1st Floor Area, Receptionist Area."
4. " General Requirements For 2nd Floor Area."
10. Undated One-page, undated listing, subject "SEC General 2 Requirements For Commission Hearing Room On 1st Floor."

F01A-86-588 DATE DESCRIPTION EXEMPTION

11. Undated One-page, undated listing, subject "SEC General 2 Requirements for CCTV."
12. Undated One-page, undated listing, subject "SEC General 2 Requirements for STU II Installation at WFN."
13. Undated Two-page, undated listing, subject "SEC General 2 Requirements For Guard Office / Locker and Central Station Alarm Areas."
14. Undated One-page, undated listing, subject " Access Control 2 System Component Requirements."
15. Undated Three-page undated document, entitled " Principal 2 Security Access Control Options For One White Flint North Building."
16. Undated Twenty-two page, undated document regarding various 2 components of the planned security program at WFN, utilization of guards, alarms, barriers, access control system, etc., and associated costs.
17. Undated Nine-page undated document, entitled " Specifications 2 for Sensitive Compartmented Information Facility (SCIF) and Communications Center (Conntenter), One White Flint North."
18. Undated Four-page undated enclosure (entitled, " White Flint 2 North CCTV Requirements") to Reimbursable Work Authori-zation dated 7-28-86.
19. Undated One-page undated attachment (entitled, " List of Require- 2 ments 86-WFN-1") to Reimbursable Work Authorization which is an enclosure to a letter dated July 30, 1986, from D. G. Kidd to Phillip Riedel.
20. Undated One-page enclosure (entitled, "WFN-Basis For Access 2 Control & Alarm Systems Cost") to letter dated July 30, 1986 from D. G. Kidd to Phillip Riedal.
21. Undated Five-page undated enclosure (entitled " Level A (Also 2 See Sketch)," to memo from F. A. Maturo to R. E. Iselin, dated May 28, 1986.
22. Undated Three pages (i.e., 5, 6, 8) regarding " Security 2 Measures-General" and " Security Costs" from the " Briefing On Security Program For One White Flint North, " dated July 28, 1986.

F0IA-86-588 C*TE DESCRIPTION EXEMPTION

23. Undated Eleven-page undated enclosure (regarding general 2 requirements for access control, intrusion detection, sound attenuation, and central alarm station layout) to memo from D. G. Kidd to F. A. Maturo dated May 6, 1986.
24. Ur. dated Five-page undated enclosure (entitled " Specifications 2 for Sensitive Compartmented Information Facility (SCIF) and Communications Center (CommCenter), One White Flint North") to memo from R. J. Brady to R. E. Iselin dated May 16, 1986.

l

[

.-- . -. . - _