Forwards Interim Decommissioning Insp Rept 50-375/86-01 on 860930-1031.No Violations Identified.Insp Conducted to Verify Condition of Facility as Described in Radiation Survey for Release for Unrestricted Use - L-85 Reactor..
ML20215E415
Person / Time
Site: 05000375
Issue date: 12/02/1986
From: Wenslawski F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Remley M
ROCKWELL INTERNATIONAL CORP.
Shared Package
ML20215E418 List:
References
NUDOCS 8612220276
Download: ML20215E415 (2)


See also: IR 05000375/1986001

Text

_ _ _ - _ _ _ _ - _ _ _ _ _ _ .

.

,

'

t'

.

DEC 021986

Docket No. 50-375 i

Rocketdyne Division

Rockwell International Corporation i

6633 Canoga Avenue

Canoga Park, California 91304

Attention: Dr. M. E. ' Remley, Director ,

Nuclear Safety and Licensing

Gentlemen:

Subject: NRC Decommissioning Inspection - Rockwell International Research

ReactorL-8p' )

This letter refers to the special inspection conducted by Mr. E. M. Garcia,

Team Leader, and staff members of NRC's contractor, Oak Ridge Associated

University, on September 30 through October 31 1986, of activities authorized

by NRC License No. R-118 and to the discussion of our findings held by

Mr. Garcia with Dr. Remley and other members of your staff at the conclusion

of our site visit on October 2, 1986. O

This inspection was conducted to verify that the condition of the facility was

as described in Rockwell's " Radiation Survey for Release for Unrestricted Use

- L-85 Reactor Facility, Revision A" submitted to the Commission on March 6,

1986; that the additional measurements committed to in " Response to ' Request

for Additional Information on the Termination Survey of the Rockwell

International Research Reactor L-85,' Docket No. 50-375", submitted to the ,

Commission on June 13, 1986 had been performed; and that the release criteria

for unrestricted use had been met. The inspection consisted of examination of

representative records, interviews with personnel, observations by the

inspectors, and the collection of samples and performance of direct radiation

and contamination measurements by the NRC's contractor.

The Enclosed Inspection Report is an interim report. The final inspection

report, which will include the results of the measurements made by our

contractor, will be issued at a later date.

No violations of NRC requirements were identified within the scope of this

inspection.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure

will be placed in the NRC Public Document Room.

8612220276 861202 9

PDR

G

ADOCK 05000375

PDR 0 h g

0 e

1

. -_ - - - - - - _ - - - - - -- - - - _ - - - - - - _ - - _ - - _--_

.

-2- DEC 021986

Should you have any questions concerning this inspection, we will be glad to

discuss them with you.

Sincerely,

F. A. Wenslawski, Chief

Emergency Preparedness and

Radiological Protection Branch

Enclosure: ..

Inspection Report No. 50-375/86-01

cc w/ enclosure:

H. N. Berkow, NRR

J. Dosa, NRR

J. Hickman, California Department of Health Services

Sacramento County Board of Supervisors

State of California, Office of Intergovernmental Management

bec w/ enclosure:

RSB/ Document Control Desk (RIDS) (includes PDR)

G. Cook

B. Faulkenberry

J. Martin

bec w/o enclosure:

LFMB

Q,' . fh, 4%

EGWRCIA RFISH FWEN5 SKI

12.

11/ A/86 IWA/86 IWs,/86