ML20215E415
| ML20215E415 | |
| Person / Time | |
|---|---|
| Site: | 05000375 |
| Issue date: | 12/02/1986 |
| From: | Wenslawski F NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Remley M ROCKWELL INTERNATIONAL CORP. |
| Shared Package | |
| ML20215E418 | List: |
| References | |
| NUDOCS 8612220276 | |
| Download: ML20215E415 (2) | |
See also: IR 05000375/1986001
Text
_ _ _ - _ _ _ _ - _ _ _ _ _ _
.
.
,
'
t
.
'
DEC 021986
Docket No. 50-375
i
Rocketdyne Division
Rockwell International Corporation
i
6633 Canoga Avenue
Canoga Park, California 91304
Attention:
Dr. M. E. ' Remley, Director
,
Nuclear Safety and Licensing
Gentlemen:
Subject:
NRC Decommissioning Inspection - Rockwell International Research
ReactorL-8p'
)
This letter refers to the special inspection conducted by Mr. E. M. Garcia,
Team Leader, and staff members of NRC's contractor, Oak Ridge Associated
University, on September 30 through October 31 1986, of activities authorized
by NRC License No. R-118 and to the discussion of our findings held by
Mr. Garcia with Dr. Remley and other members of your staff at the conclusion
of our site visit on October 2, 1986.
O
This inspection was conducted to verify that the condition of the facility was
as described in Rockwell's " Radiation Survey for Release for Unrestricted Use
- L-85 Reactor Facility, Revision A" submitted to the Commission on March 6,
1986; that the additional measurements committed to in " Response to ' Request
for Additional Information on the Termination Survey of the Rockwell
International Research Reactor L-85,' Docket No. 50-375", submitted to the ,
Commission on June 13, 1986 had been performed; and that the release criteria
for unrestricted use had been met.
The inspection consisted of examination of
representative records, interviews with personnel, observations by the
inspectors, and the collection of samples and performance of direct radiation
and contamination measurements by the NRC's contractor.
The Enclosed Inspection Report is an interim report.
The final inspection
report, which will include the results of the measurements made by our
contractor, will be issued at a later date.
No violations of NRC requirements were identified within the scope of this
inspection.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure
will be placed in the NRC Public Document Room.
8612220276 861202
9
ADOCK 05000375
h
G
0
g
0
e
1
.
-_
- - - - - - _ - - - - -
--
- - - _ - - - - - - _ - - _ - -
_--_
.
-2-
DEC 021986
Should you have any questions concerning this inspection, we will be glad to
discuss them with you.
Sincerely,
F. A. Wenslawski, Chief
Radiological Protection Branch
Enclosure:
..
Inspection Report No. 50-375/86-01
cc w/ enclosure:
H. N. Berkow, NRR
J. Dosa, NRR
J. Hickman, California Department of Health Services
Sacramento County Board of Supervisors
State of California, Office of Intergovernmental Management
bec w/ enclosure:
RSB/ Document Control Desk (RIDS) (includes PDR)
G. Cook
B. Faulkenberry
J. Martin
bec w/o enclosure:
LFMB
Q,' .
fh,
4%
EGWRCIA
RFISH
FWEN5
SKI
12.
11/ A/86
IWA/86
IWs,/86