Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20214K600 + (ML20214K600)
- ML20214K602 + (ML20214K602)
- IR 05000334/1986026 + (ML20214K604)
- ML20214K605 + (ML20214K605)
- ML20214K609 + (ML20214K609)
- ML20214K610 + (ML20214K610)
- IR 05000267/1985035 + (ML20214K612)
- ML20214K614 + (ML20214K614)
- ML20214K615 + (ML20214K615)
- ML20214K616 + (ML20214K616)
- L-86-471, Forwards Response to IE Bulletin 85-003,per NRC 860919 Request for Addl Info.Each Valve Vendor Requested to Provide Listed Info Which Is Transmitted to Limitorque.Limitorque Will Provide Util W/Original Torque Switch Settings & Revs + (ML20214K618)
- ML20214K619 + (ML20214K619)
- ML20214K620 + (ML20214K620)
- ML20214K621 + (ML20214K621)
- 05000277/LER-1987-006-01, :on 870423,Group III Outboard Isolation Occurred,Standby Gas Treatment Sys B Fan Started & Half Scram Signal Generated.Cause Not Determined.Reactor Protection Sys Motor Generator Returned to Svc + (ML20214K623)
- ML20214K625 + (ML20214K625)
- ML20214K627 + (ML20214K627)
- ML20214K628 + (ML20214K628)
- AECM-86-0363, Submits Addl Info Confirming Completion of Actions Required by License Condition 2.C.(33)(a).On 861030,performance Test Conducted to Demonstrate Effectiveness of Remote Shutdown Panel Environ Room Ventilation Sys.Results Satisfactory + (ML20214K633)
- ML20214K634 + (ML20214K634)
- ML20214K635 + (ML20214K635)
- ML20214K637 + (ML20214K637)
- ML20214K639 + (ML20214K639)
- ML20214K640 + (ML20214K640)
- ML20214K641 + (ML20214K641)
- ML20214K644 + (ML20214K644)
- W3P87-1367, Forwards Reanalysis of Large Break LOCA for Cycle 2.Response to Request for Addl Info Re Methodology Used for Cycle 2 Large Break Analysis Submitted in 861028 & 1126 Ltrs + (ML20214K645)
- A04470, Forwards Responses to 850314 Request for Addl Info & 850727 Order Imposing Implementation Schedules for Reg Guide 1.97 Items,Per Suppl 1 to NUREG-0737.Revised Emergency Procedures Implemented on 860227,per 850530 Commitment + (ML20214K647)
- ML20214K647 + (ML20214K647)
- ML20214K648 + (ML20214K648)
- ML20214K650 + (ML20214K650)
- SNRC-1339, Forwards Listed marked-up Data Records Containing Comments on Draft NUREG-1275, Operating Plants Feedback Rept - New Plants, Per 870428 Telcon + (ML20214K651)
- TXX-4973, Forwards Rev 0 to Comanche Peak Response Team Results Rept:Isap III.a.4,Traceability of Test Equipment. Repts Will Be Issued on Periodic Basis + (ML20214K652)
- ML20214K655 + (ML20214K655)
- ML20214K656 + (ML20214K656)
- 05000275/LER-1986-010, :on 860829,reactor Trip & Subsequent Turbine Trip Occurred Due to Reactor Trip Breaker Inadvertently Opening During Testing.Caused by Loose Termination on Coil of Undervoltage Shunt Trip Relay + (ML20214K657)
- ML20214K660 + (ML20214K660)
- ML20214K661 + (ML20214K661)
- ML20214K662 + (ML20214K662)
- ML20214K663 + (ML20214K663)
- ML20214K664 + (ML20214K664)
- ML20214K668 + (ML20214K668)
- ML20214K670 + (ML20214K670)
- ML20214K673 + (ML20214K673)
- ML20214K674 + (ML20214K674)
- ML20214K677 + (ML20214K677)
- DCL-86-340, Forwards Change to Rev 2 to Safeguards Contingency Plan. Change Withheld (Ref 10CFR73.21) + (ML20214K678)
- ML20214K680 + (ML20214K680)
- ML20214K681 + (ML20214K681)
- ML20214K682 + (ML20214K682)
- ML20214K683 + (ML20214K683)