M' 8$
In Reply Refer To:
Docket:
50-267/85-35
Public Service Company of Colorado
ATTN: Robert O. Williams, Jr.
Vice President, Nuclear Operations
P. O. Box 840
Denver, Colorado 80201-0840
Gentlemen:
This refers to the inspection conducted by Messrs. James A. F. Kelly and R. E.
Farrell of this office during the periods of December 11-13 and 19, 1985, of
activities authorized by NRC Operating License DPR-34 for Fort St. Vrain, and
to the discussion of our findings with Mr. Judd Sills, and other members of
your staff during the inspection.
,
Areas examined during the inspection included the protection, receipt, and
storage of new fuel on site. Within these areas, the inspection consisted of
selective examination of procedures and representative records, interviews with
!
personnel, and observations by the inspectors.
The inspection findings are
'
documented in the enclosed inspection report.
Within the scope of the irspection, no violations or deviations were
identified.
The material enclosed herewith contains Safeguards Information as defined by
10 CFR Part 73.21 and its disclosure to unauthorized individuals is prohibited
by Section 147 of the Atomic Energy Act of 1954, as amended.
Therefore, the
material, with the exception of the report cover page which is an inspection
summary, will ng be placed in the Public Document Room.
We apologize for any inconvenience that may have been caused by late issuance
of this report.
Should you have any questions concerning this inspection, we
will be pleased to discuss them with you.
Sincerely,
8600210315 060000
~
Os & t c: moa n,
J.E.G3ijang '
ADOCK 05000267
0
J. E. Gagliardo, Chief
Reactor Projects Branch
Enclosure: (see next page)
.
/
/
RIV:EP
C:EP&SP
C:R&SPB
SRI'f
C
C:RPB
JAFKel
LAYande
WLFisher
E ar% 11
JgJauton
J agl <rdo
7 /jt4/86
7/jn4/86
7 / 6 /86
$
/06
/ / /86
Jgy
ENCLOSURE CONTAINS
SAFEGUARDS INFORMATION.
UPON SEPARATION INIS
O
PAGE IS DECONTROLLED.
.
,
Public Service Company of Colorado
-2-
Enclosure:
Appendix - NRC Inspection Report
'50-267/85-35
cc w/ summary page only:
J. W. Gahm, Manager, Nuclear
Production Division
' Fort St. Vrain Nuclear Station
'16805 WCR 19h
Platteville, Colorado 80651
'
L. Singleton, Manager, Quality
Assurance Divi:; ion
(same address)
Colorado. Radiation Control Program Director
'
bec: Copy of entire report maintained in RIV Security File and sent to:
G. McCorkle, NMSS
J. Gibson, SSPD/NRR
IE File
'
Resident Inspector (w/766)
R. Martin
,
Security Inspector
Chief, EPSPS
bec:
RIV - Letter and Inspection Summary only w/766:
RPB
D. Weiss, LFMB ( AR-2015)
'
MIS
W. L. Fisher, R&SPB
RSTS Operator
Chief, RPS/A
RIV File
R&SPB
bcc:
RIV - Letter and Inspection Summary only w/out 766:
v0MB IE-04
R. L. Bangart, DRS&S
E. H. Johnson, DRS&P
E. Haycraft, DRSP/LA
J. Miller, ORB 3
p goggcoNTAINS
pARDS INF0gATION.
g ggpARATION THIS
PAgg 15 DECONW*
-
-
.
-
i
6
5
88
In Reply Refer To:
Docket:
50-267/85-35
Public Service Company of Colorado
ATTN: Robert O. Williams, Jr.
Vice President, Nuclear Operations
P. O. Box 840
Denver, Colorado 80201-0840
Gentlemcn:
This refers to the inspection conducted by Messrs. James A. F. Kelly and R. E.
Farrell of this office during the periods of December 11-13 and 19,1985, of
activities authorized by NRC Operating License DPR-34 for Fort St. Vrain, and
to the discussion of our findings with Mr. Judd Sills, and other members of
your staff during.the inspection.
Areas examined during the inspection included the protection, receipt, and
storage of new fuel on site. Within these areas, the inspection consisted of
selective examination of procedures and representative records, interviews with
personnel, and observations by the inspectors.
The inspection findings are
documented in the enclosed inspection report.
Within the scope of the inspection, no violations or deviations were
identified.
The material enclosed herewith contains Safeguards Information as defined by.
10 CFR Part 73.21 and its disclosure to unauthorized individuals is prohibited
by Section 147 of the Atomic Energy Act of 1954, as amended.
Therefore, the
material, with the exception of the report cover page which is an inspection
summary, will not be placed in the Public Document Room.
We apologize for any inconvenience that may have been caused by late issuance
of this report.
Should you have any questions concerning this inspection, we
will be pleased to discuss them with you.
Sincerely,
Cl *: 'y '
.ly
,
... .e _ . .c. ;
J. E. Gagliardo, Chief
Reactor Projects Branch
Enclosure:
(see next page)
./'
RIV:EP
C:EP&SP
C:R&SPB
SRI'
C
C:RPB
JAFKel
LAYande
WLFisher
E
1
Jauc on
a1ardo
7 /g4/86
7/p4/86
7 / 6 /86
$
/06
/ / /86
i
ENCLOSURE CONTAINS
SAFEGUARDS INFORMATION.
UPON SEPARATION THIS
I
O
PAGE IS DECONTROLLED.
k
&
_
.
_ - - _ _ _ _ - - - _ -
_ - - - _ - - _ _
y
%
~
Public Service Company of Co1orado
-2-
Enclosure:
-Appendix - NRC Inspection Report
50-267/85-35
cc w/ summary page only:
J. W. Gahm, Manager, Nuclear
Production Division-
Fort St. Vrain Nuclear Station
16805 WCR 1913
Platteville, Colorado 80651-
L.- Singleton, Manager, Quality
Assurance Division
(same address)
ColoradoRidiationControlProgramDirector
bcc:
Copy of entire report maintained in RIV Security File and sent to:
G. McCorkle, NMSS
J. Gibson, SSPD/NRR
IE File
Resident Inspector (w/766)
R. Martin
Security Inspector
Chief, EPSPS
,
bec:
RIV - Letter and Inspection Summary only w/766:-
RP8
D. Weiss, LFMB (AR-2015)
<
MIS
W. L. Fisher, R&SPB
RSTS Operator
Chief, RPS/A
-
RIV File
R&SPB
bec:
RIV - Letter and Inspection Summary only w/out 766:
4
DMB IE-04
R. L. Bangart, DRS&S
v6...H. Johnson, DRS&P
E. Haycraft, DRSP/LA
J. Miller, ORB 3
'
psuRg c0NTAINS
SAFEGUARDS INFONMATION.
UPON SEPutATION THIS
PAGE IS DSCONM'
-
-
-. . . -
-
-,,
_. .-.,-. - ..-. .- - - - - - - -
.--
-
- . . -
v
<
-
8%
-
~
..
In Reply . Refer To:
Docket: 50-267/85-35
Public Service Company of Colorado
ATTN: . Robert O. Williams, Jr.
Vice President, Nuclear Operations
P. 0. Box 840
Denver, Colorado 80201-0840
Gentlemen:
This refers to the inspection conducted by Messrs. James A. F. Kelly and R. E.
Farrell of this office during the periods of December 11-13 and 19, 1985, of
activities authorized by NRC Operating License DPR-34 for Fort St. Vrain, and
to the discussion of our findings with Mr. Judd Sills, and other members of
your staff during the inspection.
Areas examined during the inspection included the protection, receipt, and
storage of new fuel on site. Within these areas, the inspection consisted of
selective examination of procedures and representative records, interviews with
personnel, and observations by the inspectors. The inspection findings are
documented in the enclosed inspection report.
Within the scope of the inspection, no violations or deviations were
identified.
The material enclosed herewith contains Safeguards Information as defined by
10 CFR Part 73.21 and its disclosure to unauthorized individuals is prohibited
by Section'147 of the Atomic Energy Act of 1954, as amended. Therefore, the
material, with the exception of the report cover page which is an inspecticn
summary, will ng be placed in the Public Document Room.
We apologize for any inconvenience that may have been caused by late issuance
of this report.
Should you have any questions concerning this inspection, we
will be pleased to discuss them with you.
Sincerely,
r m, . .
. . . . ,
,
,-
....e,..
..;
J. E. Gagliardo, Chief
Reactor Projects Branch
/
Enclosure:
(see next page)
"
-
RIV:EPkPS
C:EP&SP
C:R&SPPI
C
C:RPB
'
JAFKel'tS7
LAYande
WLFisher
Ea
11
Jp/l/86
JjGag
irdo
auc on
1 / 4/86
1/$86
7 / 6 /86
8
/t.6
J/)
G
9
ENCLOSURE CONTAINS
\\
O@
SAFEGUARDS INFORMATION.
UPON SEPARATION THIS
PAGE IS DE00NTROLLED.
h
&
,
-
.
Public Service Company of Colorado
-2-
Enclosure:
Appendix - NRC Inspection Report
50-267/85-35
cc w/ summary page only:
J.
W.~ Gahm, Manager, Nuclear
Production Division
Fort St. Vrain. Nuclear Station
16805 WCR 19!s
Platteville, Colorav
80651
L.-Singleton, Manager, Quality
Assurance Division
(same address)
Colorado Radiation Control Program Director
bcc: Copy of entire report maintained in RIV Security File and sent to:
G. McCorkle, NMSS
J. Gibson, SSPD/NRR
IE File
Resident Inspector (w/766)
R. Martin
Security Inspector
Chief, EPSPS
bec:
RIV - Letter and Inspection Summary only w/766:
RPB
D. Weiss, LFMB (AR-2015)
MIS
W. L. Fisher, R&SPB
RSTS Operator
Chief, RPS/A
RIV File
R&SPB
bec:
RIV - Letter and Inspection Summary only w/out 766:
DMB IE-04
R. L. Bangart, DRS&S
E. H. Johnson, DRS&P
E. Haycraft, DRSP/LA
.6. Miller, ORB 3
pSURE CONTAINS
SAFEGUARDS INF0% TION.
'
mN SEPARATION THIS
PAGE IS DECONW'
_
.-
.
. ..
l
M. 8 %
In Reply Refer To:
Docket: 50-267/85-35
Public Service Company of Colorado
ATTN: Robert-0. Williams, Jr.
Vice President, Nuclear Operations
P. O. Box 840
Denver, Colorado 80201-0840
Gentlemen:
This refers to the inspection conducted by Messrs. James A. F. Kelly and R. E.
Farrell of this office during the periods of December 11-13 and 19, 1985, of
activities authorized by NRC Operating License DPR-34 for Fort St. Vrain, and
to the discussion of our findings with Mr. Judd Sills, and other members of
your staff during the inspection.
Areas examined during the inspection included the protection, receipt, and
storage of new fuel on site. Within these areas, the inspection consisted of
selective examination of procedures and representative records, interviews with
personnel, and observations by the inspectors.
The inspection findings are
documented in the enclosed inspection report.
Within the scope of the inspection, no violations or deviations were
identified.
The material enclosed herewith contains Safeguards Information as defined by
10 CFR Part 73.21 and its disclosure to unauthorized individuals is prohibited
by Section 147 of the Atomic Energy Act of 1954, as amended.
Therefore, the
material, with the exception of the report cover page which is an inspection
summary, will n_ot be placed in the Public Document Room.
o
We apologize for any inconvenience that may have been caused by late issuance
of this report.
Should you have any questions concerning this inspection, we
will be pleased to discuss them with you.
Sincerely,
r
.r.
- ..,
.
,
.
-
.
....e
,. . , , 2
J. E. Gagliardo, Chief
Reactor Projects Branch
n/
Enclosure:
(see next page)
<
r
.
-
RIV:EPkPS
C:EP&SP
C:R&SPB
SRI' f '
C
S/A
C:RPB
JAFKelW7
LAYande
WLFisher
E a * 11
J Jauc on
JjGaglD rdo
q / 4/86
1 /94/86
7/6/86
$
/ 6
/l/86
1/)
i
9
ENCLOSURE CONTAINS
h
SAFEGUARDS INFORMATION.
UPON SEPARATION THIS
O
PAGE IS DECONTROLLED.
h
&
.
.
_
-
._ _ __- _ - _
. _ _
_ _ _ -
,-.
,,
.Public-Service Company of Colorado
-2-
Enclosure:
Appendix - NRC Inspection Report
50-267/85-35
cc w/ summary page only:
J. W. Gahm, Manager, Nuclear
Production Division
Fort St. Vrain Nuclear Station
16805 WCR 191s .
Platteville, Colorado 80651
.
-
Le Singleton, Manager,. Quality
Assurance Division
(same address)
!
'
Colorado Radiation Control Program Director
bec: Copy of entire report maintained in RIV Security File and sent to:
'G. McCorkle, NMSS
J. Gibson, SSPD/NRR
IE File
Resident Inspector (w/766)
R. Martin
Security Inspector
Chief, EPSPS
bec:
RIV - Letter and Inspection Summary only w/766:
RPB '
D. Weiss, LFMB (AR-2015)
MIS .
W. L. Fisher, R&SPB
1
RSTS Operator
Chief, RPS/A
RIV File
R&SPB
<
bec:
RIV - Letter and Inspection Summary only w/out 766:
-
DMB IE-04
- L. Bangart, DRS&S
E. H. Johnson, DRS&P
E. Haycraft, DRSP/LA
J. Miller, ORB 3
psugg CONTAINS
wAnos INF05ATION.
p SEPARAT10N THIS
PAGE is Dac0#*
1
.
.
.