ML20214K635

From kanterella
Jump to navigation Jump to search
Advises That Diesel Generator Loading Study Being Addressed as Part of General Electrical Design Review,Per Vol 3 of Plant Nuclear Performance Plan.Diesel Generator Loading Issues Should Be Resolved Through Review of Program
ML20214K635
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 11/17/1986
From: Gridley R
TENNESSEE VALLEY AUTHORITY
To: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
NUDOCS 8612020387
Download: ML20214K635 (1)


Text

.-

TENNESSEE VALLEY AUTHORITY CHATTANOCGA. TENNESSEE 374ot yg\\h AN NOV 17 886 U.S. Nuclear Regulatory Comission Region 11 ATTN:

Dr. J. Nelson Grace, Regional Administrator 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323

Dear Dr. Grace:

BROWNS FERRY NUCLEAR PLANT - UNITS 1, 2, AND 3 - SIGNIFICANT CONDITION REPORT (SCR) BFN EEB 8511 DATED JULY 24, 1985 By my letter to you dated March 5, 1986, we provided an interim status of Nonconformance Report (NCR) EEB 8511 for Browns Ferry. Aa described in the Browns Ferry Nuclear Performance Plan, Volume 3,Section III.4.2, the diesel generator loading study is being addressed as part of a general electrical design review. Diesel generator loading issues should be resolved through review and closure of that program.

If you have any questions please call Jim Wolcott at (205) 729-2677.

To the best of my knowledge, 1 declare the statements contained herein are complete and true.

Very truly yours, TENNESSEE VALLEY AUTHORITY R. G idley, irector Nuclear Safety and Licensing cc:

Mr. G. E. Gears Mr. James Taylor, Director Browns Ferry Project Manager Office of Inspection and Enforcement U.S. Nuclear Regulatory Comission U.S. Nucione Regulatory Comission B3thesda, Maryland 20814 Washington, D.C.

20535 MR. G. G. Zech, Director TVA Projects U.S. Nuclear Regulatory Comission 101 Marietta St., NW, Oulte 2900 Atlanta, Georgia 30323 8612O20387 861117 I~

DR ADOCK 05000259 PDR d

An Equal Opportunity Employer M