ML20214K619
Jump to navigation
Jump to search
| ML20214K619 | |
| Person / Time | |
|---|---|
| Site: | Duane Arnold |
| Issue date: | 06/30/1986 |
| From: | Bernard Thomas IES UTILITIES INC., (FORMERLY IOWA ELECTRIC LIGHT |
| To: | |
| Shared Package | |
| ML20214K617 | List: |
| References | |
| NUDOCS 8608210347 | |
| Download: ML20214K619 (1) | |
Text
.
OPERATING DATA REPORT. (Riv.1)
~
f DOCKET NO. 050-0331 DATE 08-15-86 COMPLETED BY Bradford N. Thomes TELEPHONE 319-851-7309 OPERATING STATLS Notes
.1. Unit Name' Duane Arnold Energy Center
- 2. Reporting Period June, 1986
- 3. Licensed Thermal Power (MWt):
1658
- 4. Nameplate Rating (Gross MWe):
565 (Turbine) g
- 5. Design Electrical Rating (Not MWe):
538
- 6. Maximum Dependable Capacity (Gross MWe):
545
- 7. Maximum Dependeble Capacity (Not MWe):
515
- 8. If Changes Occur in Capacity Ratings (ltems Number 3 Through 7) Since the Last Report, Give Reasons:
- 9. Power Level to WhIch RestrIctod, If Any (Not MWe):
- 10. Reasons For Restrictions, If Ariy:
This Month Yr-to-Dete Cumulative
- 11. Hours in Reporting Period 720 4343.0 100031
- 12. Number of Hours Reactor Was Critical 385.8 3483.6 70805.5
- 13. Reactor Reserve Shut ewn Hours 42.5 42.5 192.8
- 14. Hours Generator On-Line 490.2 3572.2 69131.7 f
- 15. Unit Reserve Shut ewn Hours 0
0 0
- 16. Gross Thermal Energy Generated (MWH) 692700 4447147 87053382
- 17. Gross Electrical Energy Generated (MWH) 231377 1504082 29160143
- 18. Net Electrical Energy Generated (MWH) 217429 1412054 27308691'
- 19. Unit Service Factor 68.1 82.3 69.1
- 20. Unit Avallability Factor 68.1 82.3 69.1-
- 21. Unit Capacity Factor (Using MDC Net) 58.6 63.1 53.0
- 22. Unit Capacity Factor (Using DER Net) 56.1 60.4 50.7
- 23. Unit Forced Outage Rate 19.8 3.3 15.4
- 24. Shutewns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
8608210347 860815
~
DR ADOCK 03000331 PDR
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup:
/
/1 (9/77) or 4
t i
.