Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20212E615 + (ML20212E615)
- ML20212E616 + (ML20212E616)
- ML20212E618 + (ML20212E618)
- ML20212E619 + (ML20212E619)
- ML20212E620 + (ML20212E620)
- ML20212E621 + (ML20212E621)
- IR 05000290/2001001 + (ML20212E622)
- 05000414/LER-1986-052-01, :on 861122,main Feedwater Pump Turbine Trip Occurred During Attempt to Start Turbine 2A After 861120 Reactor Trip.Cause Not Determined.Valves Affected by Main Feedwater Isolation Signal Realigned + (ML20212E623)
- ML20212E624 + (ML20212E624)
- ML20212E626 + (ML20212E626)
- 1CAN128612, Responds to Notice of Violation & Imposition of Civil Penalty,Part Ii,From Insp Rept 50-313/86-01 During Jan 1986. Response to Part I Contained in .Reconsideration of Violation a Requested.Corrective Actions Discussed + (ML20212E630)
- ML20212E632 + (ML20212E632)
- ML20212E634 + (ML20212E634)
- ML20212E638 + (ML20212E638)
- ML20212E639 + (ML20212E639)
- ML20212E640 + (ML20212E640)
- ML20212E641 + (ML20212E641)
- ML20212E643 + (ML20212E643)
- RC-97-0218, Forwards Response to 970507 RAI Re fifteen-yr Tendon Surveillance Rept.Reactor Bldg post-tensioned Tendon Surveillance Records & Elongation/Tendon Force Comparison Data,Shown in Encl Table + (ML20212E644)
- ML20212E645 + (ML20212E645)
- ML20212E647 + (ML20212E647)
- ML20212E649 + (ML20212E649)
- ML20212E650 + (ML20212E650)
- PY-CEI-NRR-2432, Forwards NRC Form 536, Operator Licensing Exam Data, in Response to Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams + (ML20212E652)
- TXX-6188, Interim Deficiency Rept CP-86-73 Re Installation of ASME Snubber Attachment Brackets.Initially Reported on 861020. Nine Supports Remain to Be Checked to Determine Adequacy of Swing Clearances.Next Rept Will Be Submitted by 870306 + (ML20212E653)
- ML20212E656 + (ML20212E656)
- ML20212E658 + (ML20212E658)
- PNO-III-86-117, on 861017,operating License Issued to Commonwealth Edison Co for Braidwood Nuclear Power Station, Unit 1.License Limited to Fuel Loading & Initial Testing Activities Leading to Criticality + (ML20212E659)
- ML20212E660 + (ML20212E660)
- ML20212E662 + (ML20212E662)
- ML20212E665 + (ML20212E665)
- ML20212E666 + (ML20212E666)
- 05000414/LER-1987-001-04, :on 870126,two Ice Condenser Intermediate Deck Doors Exceeded Opening Force Requirements on 861118.Caused by Personnel Error.Personnel Counseled on Need to Follow Procedures + (ML20212E667)
- PNO-III-86-116, on 861015,while Operating at 95 Percent Power,Licensee Declared Unusual Event After Both Trains of Control Room Ventilation Sys Rendered Inoperable.Caused by Test Procedures Failed to Require Control Valve Be Reset + (ML20212E668)
- PY-CEI-NRR-0599, Forwards Fee for Processing 870220 Emergency Tech Spec Change Request + (ML20212E670)
- U-600676, Requests Relief from Requirements of Reg Guide 1.97,Rev 3 Re post-accident Sampling Sys Capability to Sample Containment & Drywell Equipment/Floor Drain Sumps.Description & Justification Encl.Fsar Will Be Revised + (ML20212E671)
- PNO-II-86-020, on 851031,bushings Were Installed During Outage Following Engine Failure in Diesel Generator of Plant Unit 2 + (ML20212E672)
- ML20212E673 + (ML20212E673)
- ML20212E674 + (ML20212E674)
- ML20212E675 + (ML20212E675)
- ML20212E676 + (ML20212E676)
- ML20212E677 + (ML20212E677)
- ML20212E678 + (ML20212E678)
- PNO-III-86-104, on 860923,unit Shutdown at 4:08 Am,To Investigate Cause of High Bearing Temp on One of Recirculation Pumps.Vendor Insp Determined That Some Cells, Which Supply Control Power to Hpic Sys Valves Be Degraded + (ML20212E682)
- ML20212E683 + (ML20212E683)
- PNO-II-86-008, on 860123,declared Unusual Event & Began Controlled Shutdown of Plant,Unit 2,due to Computer Calculation of Reactor Coolant Sys Identification Leak 1.5 Gpm + (ML20212E685)
- IR 05000346/1986033 + (ML20212E687)
- ML20212E688 + (ML20212E688)
- PNO-III-86-155, on 861223,US Court of Appeals,Sixth Circuit, Cincinnati,Oh,Lifted Stay Which Restricted Operation of Plant to 5 Percent Power.Licensee Plans to Start Plant Up During Weekend of 861227 & Resume Power Ascension Testing + (ML20212E690)
- ML20212E691 + (ML20212E691)
- ML20212E692 + (ML20212E692)