Text
-
MM
- NuclearOperapons I
Fermi t Edison E?IEF"5 w med..
February 27, 1987 VP-NO-87-0037 U. S. NuElear Regulatory Commission
. Attn
. Document Control Desk Washington, D..C. 20555
Reference:
- 1) Fermi 2 NBC Docket No. 50-341 NRC License No. NPF-43 2)
Detroit Edison to NRC Letter,
" Implementation Schedule for ATWS Compliance," VP-85-0200, dated October 12, 1985.
3)
NRC to Detroit Edison Letter, " Fermi-2 Compliance.with the ATWS Rule, 10CFR50.62," dated December 19, 1986.
Subject:
Fermi 2 Compliance with the ATWS Rule, 10CFR50.62 In response to your letter of December 19, 1986, Detroit Edison reconfirms the implementation schedule for ATWS compliance as stated in Reference 2.
Fermi 2 has installed an Alternate Rod Insertion (ARI) System, as described in FSAR Sectiona 4A.2.3.2.2.4, 7.1.2.1.34 and 7.6.1.18.2, and a Recirculation Pump Trip (RPT), as described in FSAR Sections 7.1.1.2 and 7.7.1.3.3.1.
Both systems are operational.
Design changes will be implemented to provide additional separation for the divisional RPT control cables in each of the recirculation pump field breaker cabinets.
This work will be completed prior to startup following the second refueling outage (estimated to be April 1990).
The modifications to the Standby Liquid Control System (SLCS) to meet the requirements of 10CFR50.62(c) (4) will include:
1.
Increasing boron enrichment in the SLCS Storage Tank.
2.
Fermi 2 SLC Technical Specification reviniusi fui
,[
enriched boric acid.
O 8703040390 870227 g
PDR. ADOCK 05000341 p
USNRC February 27, 1987-VP-NO-87-0037 Page 2 3.
Procedural and control changes as necessary to accommodate the ' enriched boron.
Our request.for'Tecinical~ Specification revision for.
enriched _ boron and ocher information1necessary to demonstrate compliance with 10CFR50.62 and adequate ATWS mitigation at Fermi 2 will be provided to the NRC nine months prior to startup.following the second refueling outage (estimated to be July 1989).
If you have any questions regarding this matter, please contact Mr. G. S. Shukla at '(313)- 586-4072.
Sincerely,