Forwards Evaluation Documenting Background,Current Status & Info Needed to Resolve Confirmatory Issue 49 (Backfit Issue 4) Re Steam Generator Level Control & Protection,Per 850509 Meeting & Recent Correspondence.Prompt Response Requested
ML20212E632
Person / Time
Site: Beaver Valley
Issue date: 02/20/1987
From: Rubenstein L
Office of Nuclear Reactor Regulation
To: Carey J
DUQUESNE LIGHT CO.
Shared Package
ML20212E636 List:
References
TAC-62936, NUDOCS 8703040396
Download: ML20212E632 (1)


Text

-

f ;;.

~

u,'

~sp February 20, 1987 p

I

. Docket No.'50-412

~ '

Mr. JJ J. Carey, Senior Vice President Duquesne Light Company Nuclear Group Post Office Box 4-s Shippingport,;PA 15077-

Dear Mr. Carey:

Subject:

Beaver Valley Unit.2 - Transmittal of Staff Position On Steam Generator High level Trip During Increased Feedwater Flow Event (TAC 62936)

Confirmatory Issue 49 (originally Back-fit Issue 4), concerns steam generator

-level control'=and protection. As a result of the appeal meeting of May 9, 1985, and recent correspondence be-tween Duquesne Light Company and the NRC, we believe additional effort on your part is needed.

The enclosed evaluation documents the background,. current status and the infonnation needed to resolve the issue. We request your prompt response to this n:atter.

This information request affects fewer than 10 respondents; therefore.

-OMB clearance is not required under PL 96-511.

Sincerely, Is i

07030 0 96 870220 Lester S. Rubenstein, Director K 05000412 PWR Project Directorate #2 PDR PDR-Division of PWR Licensing-A

Enclosure:

AS stated cc w/ enclosure:

See next pace e

Local PDR

- NRC POR PTam DMiller PWR#2 Reading Gray File NThompson EJordan

.1partlow BGrimes ACRS(10)

OGC-Bethesda.

  • PREVIOUS CONCURRENCE l

PWR#2/DPWR-A*

PWR#2-A*

PWR#2-A*

RSB/PWR-A*

I PTam/ rad DMiller LSRubenstein RLobel 2/4/87 2/4/87 M /87 2/ /87

-