Forwards Insp Repts 50-313/86-32 & 50-368/86-32 on 860929- 1003 & 1014-17.No Violations or Deviations Noted.Confirms Understanding That Ltr Describing Program to Ensure Safe Operation of Limitorque Operators Will Be Provided to NRC
ML20212E643
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 12/24/1986
From: Gagliardo J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Campbell G
ARKANSAS POWER & LIGHT CO.
Shared Package
ML20212E648 List:
References
IEB-85-003, IEB-85-3, NUDOCS 8701050390
Download: ML20212E643 (2)


See also: IR 05000313/1986032

Text

.

I

O-

,

In Reply Refer To:

Dockets:

50-313/86-32

DEC 2 41986

50-368/86-32

Arkansas Power & Light Company

ATTN: Mr. Gene Campbell

Vice President, Nuclear

Operations

P. O. Box 551

Little Rock, Arkansas

72203

Gentlemen:

-This refers to the inspection conducted by D. E. Norman, J. E. Bess, and G. A.

Pick of tnis office during the periods September 29 through October 3,1986,

and October 14-17, 1986, of activities authorized by NRC Operating

Licenses DPR-51 and NPF-6 for ANO-1 and ANO-2, and to the discussion of our

findings with members of your staff at the conclusion of the inspection.

Areas examined during the inspection included design changes and modifications,

inservice inspections, EQ inspection followup, IEB 85-03 followup, and followup

on an allegation related to an over torque condition of Limitorque operators.

Within these areas, the inspection consisted of selective examination of

procedures and representative records, interviews with personnel, and

observations by the NRC inspectors.

The insnection findings are documented in

the enclosed inspection report.

It is our understanding as a result of the telephone conversation between

myself, members of the Region IV staff, and members of your staff that a letter

describing your program for ensuring safe operation of Limitorque operators will

be provided by you'to Region IV.

Within the scope'of the inspection, no violations or deviations were identified.

Two unrasolved items are identified in. paragraphs 2.e.(1) and 2.e.(2) of the

enclos

inspection report.

Shoulq/youhaveanyquestionsconcerningthisinspection,wewillbepleasedto

discuss them with you.

l

nce$ rhl Sigacd By

8701050390 861224

7

b*"do

PDR

ADOCK 05000313-

v.

'

O

PDR

J. E. Ga liardo, Chief

Reactor Projects B anch

l

Enclosure:

(see next page)

OS [h

C:ES

C:P

AC

RIV:RS

ES

OS

fl2/l@/86KAPick

fMHunnicutt

REIreland DRHunter MEEmerson

DENorman/tw

EBess

j'

'

13/19/86

11/ @ /86

l>lf/86

lVQ /86 g[ll1/86

jf/q/86

\\

!

C:RSB

C:RPB)

!

TFWesterman

JEGag])ardo

l

l>/lA/86

11 AS /86

,yj\\

-

-

-

-

I

'

,

Arkansas' Power & Light Company-

-2-

Enclosure:

Appendix - NRC Inspection Report

50-313/86-32

50-368/86-32

cc w/ enclosure:

J. M. Levine, Director

'

Site Nuclear Operations

Arkansas Nuclear One

,

P. O. Box 608

Russellville, Arkansas

72801

Arkansas Radiation Control Program Director

bec to DMB (IE01)

~

bec distrib. by RIV:

  • RPB
  • RRI

R. D. Martin, RA

  • R&SPB
  • Section Chief (RPB/B)
  • D. Weiss, LFMB (AR-2015)
  • RIV

DRSP

  • RSB
  • MIS System
  • RSTS Operator

D. Norman

J. Bess

G. Pick

Section Chief (RSB/ES)

M. Emerson

  • w/766

4

m