I
O-
,
In Reply Refer To:
Dockets:
50-313/86-32
DEC 2 41986
50-368/86-32
Arkansas Power & Light Company
ATTN: Mr. Gene Campbell
Vice President, Nuclear
Operations
P. O. Box 551
Little Rock, Arkansas
72203
Gentlemen:
-This refers to the inspection conducted by D. E. Norman, J. E. Bess, and G. A.
Pick of tnis office during the periods September 29 through October 3,1986,
and October 14-17, 1986, of activities authorized by NRC Operating
Licenses DPR-51 and NPF-6 for ANO-1 and ANO-2, and to the discussion of our
findings with members of your staff at the conclusion of the inspection.
Areas examined during the inspection included design changes and modifications,
inservice inspections, EQ inspection followup, IEB 85-03 followup, and followup
on an allegation related to an over torque condition of Limitorque operators.
Within these areas, the inspection consisted of selective examination of
procedures and representative records, interviews with personnel, and
observations by the NRC inspectors.
The insnection findings are documented in
the enclosed inspection report.
It is our understanding as a result of the telephone conversation between
myself, members of the Region IV staff, and members of your staff that a letter
describing your program for ensuring safe operation of Limitorque operators will
be provided by you'to Region IV.
Within the scope'of the inspection, no violations or deviations were identified.
Two unrasolved items are identified in. paragraphs 2.e.(1) and 2.e.(2) of the
enclos
inspection report.
Shoulq/youhaveanyquestionsconcerningthisinspection,wewillbepleasedto
discuss them with you.
l
nce$ rhl Sigacd By
8701050390 861224
7
b*"do
ADOCK 05000313-
v.
'
O
J. E. Ga liardo, Chief
Reactor Projects B anch
l
Enclosure:
(see next page)
OS [h
C:ES
C:P
RIV:RS
OS
fl2/l@/86KAPick
fMHunnicutt
REIreland DRHunter MEEmerson
DENorman/tw
EBess
j'
'
13/19/86
11/ @ /86
l>lf/86
lVQ /86 g[ll1/86
jf/q/86
\\
!
C:RSB
C:RPB)
!
TFWesterman
JEGag])ardo
l
l>/lA/86
11 AS /86
,yj\\
-
-
-
-
I
'
,
Arkansas' Power & Light Company-
-2-
Enclosure:
Appendix - NRC Inspection Report
50-313/86-32
50-368/86-32
cc w/ enclosure:
J. M. Levine, Director
'
Site Nuclear Operations
Arkansas Nuclear One
,
P. O. Box 608
Russellville, Arkansas
72801
Arkansas Radiation Control Program Director
bec to DMB (IE01)
~
bec distrib. by RIV:
- RPB
- RRI
R. D. Martin, RA
- R&SPB
- Section Chief (RPB/B)
- D. Weiss, LFMB (AR-2015)
- RIV
DRSP
- RSB
- MIS System
- RSTS Operator
D. Norman
J. Bess
G. Pick
Section Chief (RSB/ES)
M. Emerson
- w/766
4
m