ML20212E675
| ML20212E675 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 02/23/1987 |
| From: | Fay C WISCONSIN ELECTRIC POWER CO. |
| To: | Lear G NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), Office of Nuclear Reactor Regulation |
| References | |
| CON-NRC-87-19 VPNPD-87-84, NUDOCS 8703040412 | |
| Download: ML20212E675 (1) | |
Text
O MSC00 Sin Electnc rom coune 231 W. MICHIG AN, P.O. BOX 2046, MILWAUKEE, Wl 53201 (414)277-2345 VPNPD-87-84 NRC-87-19 February 23, 1987 Document Control Desk U.S.
NUCLEAR REGULATORY COMMISSION Washington, D.C.
20555 Attention:
Mr. George Lear, Director PWR Project Directorate No. 1 Gentlemen:
DOCKET NOS. 50-266 AND 50-301 CORRECTION TO REPORT ON EXAMINATION OF POISON INSERT ASSEMBLIES POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 My letter dated February 11, 1987, forwarded a report on the "Results of Boraflex Examination, Point Beach Nuclear Plant." of that report presents a typical chemistry profile of the water in the spent fuel pool.
The last entry in that 4
table lists a gross beta gamma value of 8 x 10 uCfcc.
This number is in error.
The correct number is 8 x 10 uC/cc.
Please make the necessary change in your copy of the report.
Very truly yours,
/
h
'/
(&J C.
W.
Fay Vice President Nuclear Power Copy to NRC Resident Inspector NRC Regional Administrator, Region III
..nat2 @.N 66 au'hh0CW W"~ PDM P
I O
gDh