Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20209B639 + (ML20209B639)
- ML20209B640 + (ML20209B640)
- BECO-87-009, Discharge Monitoring Rept for Oct-Dec 1986 + (ML20209B641)
- ML20209B642 + (ML20209B642)
- ML20209B644 + (ML20209B644)
- TXX-6248, Interim Deficiency Rept CP-85-35 Re Cable Tray Hanger Design.Initially Reported on 861021.Support Testing & Verification Programs Continuing.Next Rept Expected by 870706 + (ML20209B646)
- ML20209B650 + (ML20209B650)
- IR 05000247/1986136 + (ML20209B651)
- ML20209B652 + (ML20209B652)
- ML20209B654 + (ML20209B654)
- ML20209B655 + (ML20209B655)
- ML20209B656 + (ML20209B656)
- IR 05000461/1987013 + (ML20209B657)
- 05000456/LER-1987-001, :on 870102,personnel Failed to Take Required Gas Sample w/H2 & O2 Analyzers Inoperable.Caused by Design Deficiency in Moisture Separator Filter.Filter Placed in Sample Gas Inlet Line to Remove Water + (ML20209B660)
- ML20209B661 + (ML20209B661)
- ML20209B662 + (ML20209B662)
- ML20209B664 + (ML20209B664)
- ML20209B665 + (ML20209B665)
- ML20209B667 + (ML20209B667)
- 05000298/LER-1999-004-01, Forwards LER 99-004-01.Commitments Made by Util Are Encl + (ML20209B668)
- ML20209B669 + (ML20209B669)
- ML20209B671 + (ML20209B671)
- ML20209B672 + (ML20209B672)
- ML20209B675 + (ML20209B675)
- ML20209B676 + (ML20209B676)
- ML20209B677 + (ML20209B677)
- 05000298/LER-1999-004, :on 990426,SRVs Were Found Outside TS Safety Function Lift Setpoint.Caused by Sufficient Corrosion Bonding.Srv Pilot Valve Assemblies Removed for Testing Were Replaced + (ML20209B679)
- ML20209B680 + (ML20209B680)
- ML20209B681 + (ML20209B681)
- ML20209B682 + (ML20209B682)
- ML20209B683 + (ML20209B683)
- ML20209B684 + (ML20209B684)
- ML20209B685 + (ML20209B685)
- ML20209B686 + (ML20209B686)
- LIC-99-0061, Submits Response to GL 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants. Disclosure Encl + (ML20209B689)
- ML20209B690 + (ML20209B690)
- ML20209B691 + (ML20209B691)
- ML20209B694 + (ML20209B694)
- ML20209B695 + (ML20209B695)
- L-99-104, Responds to GL 98-01,Suppl 1, Y2K Readiness at Nuclear Power Plants. Disclosure Rept Encl + (ML20209B698)
- ML20209B700 + (ML20209B700)
- AECM-87-0084, Advises That Util Incorporated NRC Suggested Clarifications Into Facility Operator Requalification Program Via Rev 6 to Facility Administrative Procedure 01-S-04-2 + (ML20209B701)
- ML20209B702 + (ML20209B702)
- ML20209B703 + (ML20209B703)
- NPL-99-0381, Submits Response to NRC GL 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants. GL 98-01 Requested Response on Status of Facility Y2K Readiness by 990701.Disclosure Encl + (ML20209B705)
- ML20209B706 + (ML20209B706)
- ML20209B707 + (ML20209B707)
- LR-N990316, Responds to NRC Request for Info Re Y2K Readiness at Npps, Per GL 98-01,suppl 1.Disclosure Encl + (ML20209B708)
- ML20209B713 + (ML20209B713)
- TXX-6211, Suppls 860402 Response to Violations Noted in Insp Repts 50-445/85-07 & 50-446/85-05.Corrective Actions:Project Directive Issued Emphasizing Requirements for Properly Documenting Design Alternatives Prior to Const Activities + (ML20209B714)
- ML20209B717 + (ML20209B717)