1 4
NOTICE OF VIOLATION Illinois Power Company License No. NPF-55 l
As a result of the inspection conducted on March 24 through April 10, 1987, and in accordance with the " General Policy and Procedure for NRC Enforcement i
Actions",10 CFR Part 2, Appendix C (1985), the following violation was identified:
i f
'O CFR 50, Appendix B, Criterion X, as implemented by Illinois Power (IP)
Company Operational Quality Assurance Manual, Chapter 10, requires that a program of inspection be established and implemented to provide assurance that l
the fabrication, construction, and installation activities conform to the
]
requirements of the applicable instructions, procedures, and drawings.
l Contrary to the above, the licensees inspection program failed to identify l
that a Jumper in the HPCS 4.16KV switchgear had not been removed as required by FDI-SKRL-0.
In addition, other discrepancies were identified between the as-built electrical field installations and the design drawing requirements in the HPCS 4.16KV switchgear cubicles.
I This is a Severity Level IV violation (Supplement 1).
I Pursuant to the provisions of 10 CFR 2.201, you are required to submit to this office within thirty days of the date of this Notice a written statement or i
explanation in reply, including for each violation:
(1)correctiveaction taken and the re:Jits achieved; (2) corrective action to be taken to avoid I
further violations; and (3) the date when full compliance will be t.chieved.
j Consideration may be given to extending your response time for good cause shown.
1 h
fw' i
f.r APR 2 2 iW/
U Dated J. J. Harrison, Chief Engineering Branch l
J i
l 1