Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- CEO-88-382, Informs That Due to Extended Drought in State of Ca,Util Plans to Operate Plant at Nominal 92-94% Power Level.Encl Procedures Identified for Performance at 100% Power Level + (ML20206L785)
- B12054, Forwards Radiological Environ Monitoring Program Annual Environ Operating Rept,Part B,1985. Since Unit 3 Did Not Achieve Initial Criticality Until 860123,text of Rept Only Addresses Operation of Units 1 & 2 + (ML20206L786)
- ML20206L787 + (ML20206L787)
- ML20206L789 + (ML20206L789)
- ML20206L790 + (ML20206L790)
- 05000272/LER-1985-012, :on 851006,turbine Tripped Due to False Low Condenser Vacuum Signal.Caused by Troubleshooting Techniques & Sys Design.Instrument Lines Isolated from Trip Blocks & lo-lo Vacuum Alarms Removed + (ML20206L791)
- ML20206L793 + (ML20206L793)
- ML20206L794 + (ML20206L794)
- ML20206L795 + (ML20206L795)
- 05000529/LER-1986-027-01, :on 860531,turbine Trip Caused Actuation of Reactor Protection Sys,Initiating Reactor Trip.Caused by Personnel Error Due to Inadequate Procedures.Plant Operating Procedures Revised + (ML20206L797)
- ML20206L799 + (ML20206L799)
- ML20206L800 + (ML20206L800)
- ML20206L802 + (ML20206L802)
- ML20206L803 + (ML20206L803)
- 05000354/LER-1986-024, :on 860525,surge Occurred in Ref Leg of Channel D Reactor Level Instrumentation Resulting in Actuation of LOCA Logic.Caused by Procedural Inadequacy for Return to Svc Following Calibr.Procedures Revised + (ML20206L807)
- ML20206L810 + (ML20206L810)
- ML20206L812 + (ML20206L812)
- ML20206L813 + (ML20206L813)
- ML20206L814 + (ML20206L814)
- PNO-II-86-055, on 860806,plant Began Shutdown Due to Leak in Steam Generator a Tube Calculated at 0.26 Gallons Per Minute.Shutdown Expected to Last 10 Days + (ML20206L815)
- ML20206L818 + (ML20206L818)
- ML20206L823 + (ML20206L823)
- IR 05000313/1988041 + (ML20206L827)
- ML20206L828 + (ML20206L828)
- IR 05000338/1986012 + (ML20206L829)
- ML20206L830 + (ML20206L830)
- ML20206L833 + (ML20206L833)
- ML20206L834 + (ML20206L834)
- ML20206L836 + (ML20206L836)
- ML20206L837 + (ML20206L837)
- ML20206L838 + (ML20206L838)
- ML20206L840 + (ML20206L840)
- ML20206L841 + (ML20206L841)
- ML20206L844 + (ML20206L844)
- ML20206L845 + (ML20206L845)
- ML20206L846 + (ML20206L846)
- ML20206L847 + (ML20206L847)
- ML20206L848 + (ML20206L848)
- ML20206L849 + (ML20206L849)
- ML20206L851 + (ML20206L851)
- ML20206L853 + (ML20206L853)
- ML20206L855 + (ML20206L855)
- ST-HL-AE-2041, Forwards Revised FSAR Sections 5.2.3,9.1.3,9.2.3,10.4.6 & Tables 1.3-2,5.2-4 & 9.1-4 Re Water Chemistry.Changes Made for Consistency W/Design Criteria & Reflect Water Chemistry for RCS & Makeup Demineralized Water Sys + (ML20206L857)
- ML20206L858 + (ML20206L858)
- ML20206L859 + (ML20206L859)
- ML20206L860 + (ML20206L860)
- ML20206L863 + (ML20206L863)
- ML20206L864 + (ML20206L864)
- NUREG-0880, Transcript of 860619 Commission Meeting in Washington,Dc Re Safety Goals.Pp 1-58.Related Info Encl + (ML20206L866)
- ML20206L867 + (ML20206L867)
- ML20206L868 + (ML20206L868)