Final Response to FOIA Request for Six Categories of Documents Re Plants Issued OL After Accident at Tmi.Records Responsive to Items of Request Located in Many Files Which Would Require Extensive Search Time
ML20206L818
Person / Time
Site: Crane 
Issue date: 08/11/1986
From: Grimsley D
NRC OFFICE OF ADMINISTRATION (ADM)
To: Evans L
INTERNATIONAL ENERGY ASSOCIATES, LTD.
References
FOIA-86-278 NUDOCS 8608200294
Download: ML20206L818 (1)


Text

%d-DIb

/

UNITED STATES F

-o NUCLEAR REGULATORY COMMISSION r.

j WASHINGTON. D. C. 20655 AUG 11 1986 Ms. Lesley R. Evans Senior Consultant International Energy Associates Limited 2600 Virginia Avenue, NW IN RESPONSE REFER Washington, DC 20037 TO F01A-86-278

Dear Ms. Evans:

This is in final response to your letter dated April 11, 1986, in which you requested, pursuant to the Freedom of Information Act (F0IA), six categories of records regarding plants that have been issued an operating license since the accident at the Three Mile Island plant.

During a telephone conversation between Nina Toms and Roger Mattson on August 7, 1986, Mr. Mattson was informed of the staff's comments regarding the remaining item (five) of your request. The staff noted that records responsive to item five are available but are located in many files, which would require extensive search time to identify these records. No single record exists which would adequately respond to this item.

In addition, computer programming would also be a factor to consider with regard to this item.= On your behalf, Mr. Mattson informed Ms. Toms he wished no further action be taken by the staff regarding this item.

The search charge for producing the recordsr subject to item three of your request, which was provided to you in our earlier response letter dated July 25,1986, is $96.00, as specified in 10 CFR 9.14(b)(3).

You will be billed by the NRC's Division of Accounting and Finance for that amount.

This completes action on your request.

Sincerely, M)f J

-V Donnie H. Grimsley, Director Division of Rules and Records Office of Administration i

8608200294 860811 Ngs 78 PDR

  • y e

INTERNATIONAL l ASSOCIATES ENERGY LIMITED April 11, 1986 FREGOOM OF WWMAlD Mr. Donnie Grimsley, Director r

Division of Rules and Records

((

l -h -

Office of Administration U. S. Nuclear Regulatory Commission Washington, D.C.

20555

{

Dear Mr. Grimsley:

Pursuant to the Freedom of Information Act (FOIA), I would like to request the following information:

!1.Thenamesofallplantothathavereceivedanoperating license (OL) since the accident at Three-Mile Island (TMI) in March 1979.

[i V 2. For each of these post-TMI OLs, please provide:

(a) the Low Power OL issuance date (b) the Full Power OL issuance date.

6

3. For each of these post-TMI OLs, please provide the number

~

i of NRC staff man-hours expended per calendar or fiscal k

year on license reviews from receipt of CP to receipt of Full Power OL (or to date if the Full Power OL is g

4 pending).

Please provide.these hours according to the following five program offices: (1) NRR,, ( 2) IE-HQ, (3)

[g Regions, (4) ACRS, and (5) NMSS.

4. For.each of these post-TMI OLs, please provide the number I

of NRC hearing days expended per year, subdivided bi according to safety or environmental hearings.

gf/ g 8A I

5. For each of these post-TMI OLs, please identify whether or l

not they were subjected to any of the following appraisals (if appropriate, how many of each of these appraisals):

(a)

Construction Appraisal Team (CAT)

(b)

Integrated Design Inspection (IDI)

IM (c)

Independent Design Verification Program (IDVP)

(d)

Inspection by NRC's Nondestructive Examination Van

/

(e)

Other special design or construction verification program required or conducted by NRC (f)

INPO Construction Appraisal.

m vmour Avenut.n w.

, _ _ a A e4 t-wAss ron, o c. m7 g,

WN g.

Tw=c mwAssoc

' s...

f~ GW$- k~decmS k.

4(

y,, ' ' lA

)$ & W,

5

6. For each of these post-TMI OLs, please list the number, 4

./

value, and date of all civil penalties issued by NRC for-7 design, construction and startup (before full power).

activities.

Thank you for your assistance.

Please do not hesitate to call me if there any question regarding this request or if you think there may be more readily available information that would help me to characterize any of the six areas I have identified herein.

Si e

Les y R.

Evans Seniod Consultant 342-6751

/yy 4

t

~

-,y.

,. - ~

.-,-----,.7.

..