ML20206L848

From kanterella
Jump to navigation Jump to search
Discusses Status of Review of Low Oil Level in Essential Unit Substation Transformers.Insp of GE Transformer Mfg Facility in Rome,Ga Necessary to Determine Scope of Problem. Vendor Program Branch Insp Scheduled for June 1986
ML20206L848
Person / Time
Site: Oyster Creek
Issue date: 03/09/1986
From: Baer R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To: Ebneter S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20204F806 List:
References
NUDOCS 8608200321
Download: ML20206L848 (1)


Text

  • .

[AdAdo(q MAR , 9 W (Ws 33x I

MEMORANDUM FOR: Stewart D. Ebneter, Director Division of Reactor Safety Region I FROM: Robert L. Baer, Chief i Engineering and Generic Comunications Branch Divisicn of Emergency Preparedness and Engineering iesponse Office of Inspection and Enforcement

SUBJECT:

LOW OIL LEVEL IN ESSENTIAL UNIT SUBSTATION TRANSFORMERS AT OYSTER CREEK NUCLEAR GENERATING STATION

Reference:

Memorandum Ebneter to Jordan 12-6-85, same subject This memorandum is to inform you of the status of our review of the subject.

We agree with your assessment that a similar problem could exist at other facilities. We have performed searches of LERs, Part 21 reports, and 50.55(e) reports but have not identified any other cases to date. Based on the informa-tion that you have provided and that we have gathered we believe that an inspection at the GE transformer manufacturing facility in Rome, Georgia is necessary to determine the scope of the problem and appropriate NRC action.

The Vendor Program Branch has currently scheduled this inspection for June, 1986. Following this inspection we will inform you of our intended actions.

l%l-Robert L. Baer, Chief Engineering and Generic Comunications Branch Division of Emergency Preparedness and Engineering Response Office of Inspection and Enforcement

Contact:

Jim Stewart, IE (1nt uo?_onct l