ML20206L799

From kanterella
Jump to navigation Jump to search
Responds to Re Change to Commitment in Response to Insp Rept 50-267/84-15.Monitoring Shift Turnover Semiannually Under QA Monitoring Acceptable
ML20206L799
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 06/18/1986
From: Gagliardo J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Walker R
PUBLIC SERVICE CO. OF COLORADO
References
NUDOCS 8606300427
Download: ML20206L799 (2)


See also: IR 05000267/1984015

Text

m

.

In Reply Refer To:

Docket: 50-267/84-15

Public Service Company of Colorado

ATTN:

R. F. Walker, President

P. O. Box 840

Denver, Colorado 80201-0840

Gentlemen:

This responds to your letter, P-86387, dated May 27, 1986. This letter

concerned a change to a commitment you had made in response to NRC Inspection

Report 84-15. This letter had inadvertently been addressed to NRR (ATTN:

H. N. Berkow) instead of Region IV.

We understand that you wish to change your comitment made in response to NRC

Inspection Report 84-15 so that instead of requiring the annual NFSC audit of

Technical Specification compliance to include shift turnover, you will monitor

this activity at least semi-annually under QA monitoring. We find this change

in commitment to be acceptable. We also believe that the NFSC audits of

Technical Specification compliance should not be constrained from looking at

this area but that this should not be an audit requirement.

If you have any questions regarding this issue, please contact us.

Sincerely,

h

J. E. Gagliardo, Chief

Reactor Projects Branch

cc:

.

J. W. Gahm, Manager, Nuclear

Production Division

.

I

Fort St. Vrain Nuclear Station

16805 WCR 191

Platteville, Colorado 80651

L. Singleton, Manager, Quality

Assurance Division

(sameaddress)

-

Colorado Radiation Control Program Director

bcc:

(seenextpage)

\\

RIV:RPB/A

C:RP8/A

C:RPB

MESkow;df

kJPJaudon

JEGagl y rdo

6//1(/86

6//f/86

6/t\\/ 65

8606300427 860618

PDR

ADOCK 05000267

4

G

PDR

<

'

-

.

-

a

.. .

.

-

'

.

Public Service Company of Colorado

-2-

bec t DMB.(IE01

lbec distrib. by RIV:

RPB

DRSP

Resident Inspector

R. D. Martin, RA

!

SectionChief(RPB/A)

RSB

SectionChief(RSB/ES)

H. N. Berkow, NRR

R&SPB

MIS System

RSTS Operator

RIV File

.

- _ _ . . . . . . . .

(

f,

.

'

.

t

Public Service ~

emo..,*.

Company of Colorado

-

16805 WCR 19 1/2, Platteville, Colorado 80651

Mk

@

d

May 27, 1986

W30E

'

'

l

Fort St. Vrain

Unit No. 1

-

-

f

m

P-86387

- _ _ _ .

Director of Nuclear Reactor Rejulation

U.S. Nuclear Regulatory Commistion

Washington, D.C.

20555

Attn:

Mr. H. N. Berkow

Director Standardization and

Special Projects Directo ate

Docket No. 50-267

SUBJECT:

SHIFi TURNQVER PROCEDURE AUDITS

REFERENCE:

1) PSC Letter, Warembourg to Gammill,

Dated 2/8/80 (P-80020)

2) I&E Inspection Report 84-15 (G-84258)

3) PSC Letter, Gahm to Johnson,

Dated 8/20/84 (P-84291)

4) DSC Letter, Gahm to Martin,

)ated 5/22/85 (P-85178)

Dear Mr. Berkow,

In

letter

P-84291,

PSC re:ponded to a Notice of Deviation

(50-267/8415-06) regarding the frequency of independent check of

shift turnover procedures.

PSC committed to include shift turnover

evaluation

in

NFSC

Audit

A-84-01

(Technical

Specification

Compliance), which was conducted in August, 1984, and to evaluate the

effectiveness of shift turnover procedures in future annual NFSC

audits of Technical Specification Compliance.

Shift turnover activities have been evaluated in NFSC Audits A-84-01

and A-85-01, conducted in August of 1984 and 1985, respectively.

In

addition,

shift turnover is being reviewed by the QA Division on at

least a semi-annual basis via QA Monitoring Activities.

No findings

or deviations have been revealed as a result of these evaluations.

Based upon this experience, PSC feels that the resources of the NFSC

auditors can now be devoted to other matters during the annual

NFSC

audits of Technical

Specification Compliance. Accordingly, PSC is

withdrawing its commitment to evaluate shift turnover annually in the

'PGO6cRoqqe

7-

.4,

.

.-

,

-.

P-86387

-2-

May 23, 1986

,

NFSC audit.

PSC commits to continue to evaluate shift turnover

activities on at least a semi-annual

basis via QA Monitoring

Activities. We request your written concurrence with this change.

If you have any questions regarding this issue, please contact

Mr. M. Holmes, (303) 480-6960.

.

Sincerely,

.h

L. W. Singlet)n

Manager, QA ivision

LWS:hmb

cc:

Regional Administrator

Region IV

U.S. Nuclear Regulatory Commission

EAttni'~Mr.V,'E.Gagliaroo,C

.

~

. Chief Reactor Projects Branch

.