Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20154C788 + (ML20154C788)
- PNO-I-98-045, on 981002,representative from State of CT Dept of Environ Protection Contacted NRC Staff Re Radioactive Matl Found in Scrap Yard.Nrc Staff Contacted Representative of Scrap Dealer for Further Info + (ML20154C789)
- ML20154C791 + (ML20154C791)
- NLS8800447, Forwards Summary of Action Taken in Response to NRC Bulletin 88-005,Suppls 1 & 2, Nonconforming Matls Supplied by Piping Supplies,Inc & West Jersey Mfg Co. Util Believes That Ref Wjm Valves Adequate for nonsafety-related Use + (ML20154C793)
- ML20154C797 + (ML20154C797)
- ML20154C799 + (ML20154C799)
- ML20154C803 + (ML20154C803)
- IR 05000336/1998004 + (ML20154C804)
- ML20154C806 + (ML20154C806)
- ML20154C807 + (ML20154C807)
- IR 05000369/1985039 + (ML20154C808)
- ML20154C810 + (ML20154C810)
- ML20154C812 + (ML20154C812)
- IR 05000309/1988004 + (ML20154C814)
- B13020, Provides Addl Info to Support NSHC Determination Re Proposed Rev to Tech Spec Snubber Surveillance Requirements in Response to NRC Verbal Request + (ML20154C815)
- ML20154C816 + (ML20154C816)
- ML20154C817 + (ML20154C817)
- ML20154C819 + (ML20154C819)
- ML20154C820 + (ML20154C820)
- ML20154C821 + (ML20154C821)
- 05000285/LER-1988-018, :on 880704,failure to Conduct Surveillance Test within Prescribed Interval Occurred.Test Performed on 880711.Cause to Be Investigated.Procedure Will Be Revised + (ML20154C822)
- ML20154C824 + (ML20154C824)
- ML20154C826 + (ML20154C826)
- ML20154C827 + (ML20154C827)
- 3F0988-03, Responds to 880328 Request for Addl Info Re Reactor Coolant Pump Trip Issue,Per NUREG-0737,Item II.K.3.5 + (ML20154C828)
- ML20154C830 + (ML20154C830)
- ML20154C831 + (ML20154C831)
- 05000354/LER-1988-009-01, :on 880413,reported That Contrary to Tech Spec Requirement,Two 4-h Flow Rate Estimates Not Made During South Plant Vent Monitor Outage.Caused by Operator Failure to Initiate & Complete Daily Log + (ML20154C833)
- ML20154C834 + (ML20154C834)
- ML20154C836 + (ML20154C836)
- ML20154C837 + (ML20154C837)
- ML20154C838 + (ML20154C838)
- ML20154C842 + (ML20154C842)
- ML20154C843 + (ML20154C843)
- ML20154C847 + (ML20154C847)
- IR 05000456/1998013 + (ML20154C849)
- ML20154C850 + (ML20154C850)
- ML20154C851 + (ML20154C851)
- ML20154C854 + (ML20154C854)
- ML20154C855 + (ML20154C855)
- ML20154C859 + (ML20154C859)
- ML20154C860 + (ML20154C860)
- 05000425/LER-1998-008, :on 980904,slave Relay Testing Led to Trips of Main FW Pumps & Reactor.Caused by Inherent Design Weakness.Will Modify Test Circuits to Prevent FW Pump Tripping Due to Simultaneous Lamp Testing.With + (ML20154C861)
- CLI-98-18, Order.* Grants Joint Motion Filed by Naesco,Sapl & Necnp for Two Week Deferral of Briefing Schedule Set by Commission in CLI-98-18.With Certificate of Svc.Served on 981006 + (ML20154C865)
- RBG-27821, Advises That Util Licensed Operator Training & Requalification Training Programs Accredited by Natl Academy for Nuclear Training on 870624,per NUREG-1262 & Generic Ltr 87-07 + (ML20154C867)
- ML20154C868 + (ML20154C868)
- ML20154C869 + (ML20154C869)
- ML20154C870 + (ML20154C870)
- ML20154C871 + (ML20154C871)
- ML20154C873 + (ML20154C873)
- ML20154C875 + (ML20154C875)