ML20154C838
| ML20154C838 | |
| Person / Time | |
|---|---|
| Site: | Trojan File:Portland General Electric icon.png |
| Issue date: | 09/09/1988 |
| From: | Cockfield D PORTLAND GENERAL ELECTRIC CO. |
| To: | Hannon J Office of Nuclear Reactor Regulation |
| References | |
| GL-88-13, NUDOCS 8809150050 | |
| Download: ML20154C838 (3) | |
Text
-
e m
amums A
Portkir1d Genofal Boctric Coritxirly I
Davd W. Cockfield Vee Presdent. Nuclear September 9, 1988 Trojan Nuclear plar.t Docket 50-344
' S eense hPF-1 l
Mr. John Hannon. Chief Operator 1.icensing Branch OWFN-10D-18 US Nuclesr Regulatory Comission l
Washing, ton DC 20555 Dear Sirt Response _to Ce,_qeM O e11str_88-13:
Operalor t.leensing _ Examina11ong I
The subject generic lotter requested estLA*.es of birtland General Electric Cot pany's operator licensing and requalification exa.sination requirements l
for Fiscal Years 1989, 1990, 1991, and 1992. The infomation requested is provided in Enclowuree 1 and 2 consistent with the fomat proposed in l
Generic t.etter 88-13.
If additional informati?n is needed, please contact Mr. S. B. Nichols at (501) 556-3713. Ext. 215.
Sincerely.
/
/
f Enclosures ct Mr. John B. Martin i
Regional Administrator. Region V
[
l U.S. Nuclear Regulatory Comission t
1 Mr. 91111sts T. Dixon f
State of Oregon l
Department of Energy i
r i
Mr. R. C. Barr l
WRC Resident Inspector l
Trojan Nuclear Plant L
l 8809150050 000909 PDR ADOCK 05000344 po3 v
esu 1
a
PROPOSED OPERATOR LICENSING EXAMINATION SCHEDU;.E FORMAT Ficility Tr m n NRC Regio.7 V
l FY 1989 FY 1990 FY 1991 FY 1992 l
(10/1/88 9/30/89) (10/1/89-9/30/90) (10/1/90 9/30/91) (10/1/91 9/30/92) 1.
Date s n o,no
< r s, 6/01 e/42 l
t
- RO 5
6 6
e
- 5R0 Instant, 0 0
o o
[
- 5R0 Upgrade 2
2 2
?
- 5R0 Limited o-O o
o l
2.
Datt
}
- RO
[
(SR0 Instant,
- 5R0 Upgrade
- 5R0 Limited j
r l
Please indicate initial cold license examinations by placing an asterisk {')
by the date. Please indicate examinations intended to extend an Operator s f
Ilcense to a second or subsequent unit with two asterisks (**) (e.g., if Unit j
Ore is in operation and Unit Two is approaching fuel load and three R0 candidates i
with no previous license are to be examined on both Units One and Two and five l
RO candidates licensed on Unit One are to be enseined to extend their licenses to t
Unit Two, ther. indicate "R0 3,5.")
[
l t
i i
[
{
t
( *.
{
i PROPOSED REQUALIFICATION EXAMINAY!0N SCHEDULE FORMAT
{
Facility NRC Region V
i mp.
FY 1989 FY 1990 FY 1991 FY 1992 (10/1/M 9/30/89)
(10/1/899/30/90)
(10/1/909/30/91)
(10/1/919/30/92) 1.
Date 3...
Date 3,en Date itot Dete t ro.
2.
Date
,3nts, Date,,on Date,,oi Date s.
3.
Date
.,,0.<,
' late.,on Datemi Date 994 4
Date Date Date Date 0
l 1
l t
..,, _ _ ~
.,,w-----e e-m-
~ v --ev4 ww ? "* ~
~~"*"**"""**"~~#'~'~
' " * '