ML20154C791
| ML20154C791 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 10/01/1998 |
| From: | Eugene Kelly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Bowling M, Loftus P NORTHEAST NUCLEAR ENERGY CO. |
| Shared Package | |
| ML20154C794 | List: |
| References | |
| 50-336-98-04, 50-336-98-4, GL-89-10, NUDOCS 9810070023 | |
| Download: ML20154C791 (3) | |
See also: IR 05000336/1998004
Text
__ _
_ _ . .
.-
_.
_._ _ _ . ._. . . _ _. _ _.. _ _ _ .
_ _ .__._ _ _..
-
-
s
s
i
,
October 1, 1998
Mr. M. L. Bowling, Recovery Officer, Technical Services
clo P. A. Loftus, Director - Regulatory
Affairs for Millstone Station
NORTHEAST NUCLEAR ENERGY COMPANY
P.O. Box 128
Waterford, Connecticut 06385
SUBJECT:
NRC MOTOR OPERATED VALVE INSPECTION 50-336/98-04
Dear Mr. Bowling:
This letter transmits the results of the NRC inspection conducted from
September 14-18,1998 at Millstone Unit 2. The inspection focused on areas important to
the public health and safety, and consisted of an in& pendent evaluation of the motor-
,
operated valve (MOV) program associated with NRC Generic Letter (GL) 89-10, " Safety-
Related Motor-Operated Valve Testing and Surveillance." At the conclusion of the
inspection, the preliminary findings were discussed with Mr. D. Amerine and members of
'
your staff on September 18,1998.
The NRC is closing its review of your program implemented under GL 89-10 based on the
'
commitments discussed in this inspection report, including: (1) Dynamically test a
,
'
duplicate valve to main steam isolation bypass valves 2-MS-65A/B under steam blowdown
conditions, and (2) Dynamically test auxiliary feedwater pump turbine trip throttle valve 2-
MS-464 during startup of Millstone Unit 2. We also understand that prior to or during
startup you intend to perform static tests of three feedwater system block valves to
confirm stem friction coefficient assumptions, and to test dynamically valves 2-FW-44,2-
MS-201, and 2-MS-202 to confirm current stem friction coefficient and load sensitive
behavior design assumptions. Significant items List (SIL) item 20 pertaining to your GL 89-
10 program remains open pending NRC review of the results of these tests (SIL ltem 20.1)
and your corrective actions to preclude pressure locking of containment sump isolation
valves 2-CS-16.1 A and 2-CS-16.18 (SIL item 20.7). We request that you inform us by
letter of the completion of the in-situ tests, including a summary of the results. Please
\\
contact us promptly if your understanding of these commitments and test plans differs
g
from those discussed in this report.
I
f,0\\
t
9810070023 981001
"
ADOCK 05000336
G
4
_ _ _ . . _ _ _
__. _ . - . . _ _ _.. _ _ _ _ . _ _ . _
_ _ _ _ _ _ _ _ _ _ _ . . _ _ . . . _ _
s
.
Mr. M. L. Bowling
2
in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter
and the enclosures will be placed in the NRC Public Document Room (PDR).
Sincerely,
ORIGINAL SIGNED BY:
Eugene M. Kelly, Chief
Systems Engineering Branch
Division of Reactor Safety
Docket No. 50-336
License No. DPR-56
Enclosures: Inspection Report No. 50-336/98-04
cc w/enci:
B. Kenyon. President and Chief Executive Officer - Nuclear Group
M. H. Brothers, Vice President - Operations
J. McElwain, Recovery Officer - Millstone Unit 2
J. Streeter, Recovery Officer - Nuclear Oversight
P. D. Hinnenkamp, Director - Unit 3
J. A. Price, Director - Unit 2
D. Amerine, Vice President - Human Services
E. Harkness, Director, Unrt 1 Operations
.
J. Althouse, Manager - Nuclear Training Assessment Group
F. C. Rothen, Vice President, Work Services
J. Cantrell, Director - Nuclear Training (CT)
S. J. Sherman, Audits and Evaluation
L. M. Cuoco, Esquire
J. R. Egan, Esquire
V. Juliano, Waterford Library
J. Buckingham, Department of Public Utility Control
S.' B. Comley, We The People
State of Connecticut SLO Designee
D. Katz, Citizens Awareness Network (CAN)
R. Bassilakis, CAN
J. M. Block, Attorney, CAN
S. P. Luxton, Citizens Regulatory Commission (CRC)
Representative T. Cor mnnon
E. Woollacott, Co-Chairman, NEAC
.
-
_._.
_-
_,
_. _ . _ .
_ .___ .-_ _._. _____ _ ___ _._ _._._.__. _ _ _ .._ _ .. _ __ _
.. -
..
,
l
l
l
Mr. M. L. Bowling
3
Distribution w/ encl:
i
Region I Docket Room (with copy of concurrences)
Nuclear Safety Information Center (NSIC)
!
PUBLIC
FILE CENTER, NRR (with Oriainal concurrences)
Millstone Inspection Directorate Secretarial File, Region i
NRC Resident inspe: tor
H. Miller, Regional Administrator
W. Axelson, Deputy Regional Administrator
J. Wiggins, DRS
l
L. Nicholson, DRS
E. Kelly, DRS
,
l'
D. Terao, NRR
B. Jones, PIMB/ DISP
W. Lanning, Director, Millstone inspection Directorate, R1
D. Screnci, PAO
N. Blumberg, Millstone inspection Directorate, R1
DRS File
l
I
Distribution w/enci <VIA E-MAIL >:
M. Callahan, OCA <MSC>
R. Correia, NRR <RPC>
B. McCabe, OEDO <BCM>
E. Imbro, Director, Millstone ICAVP Inspetions, NRR < EXI>
l
W. Dean, Director, Millstone Project Directorate, NRR <WMD>
l
P. Koltay, Chief, ICAVP Oversight, SPO, NRR <PSK>
Inspection Program Branch <lPAS>
DOCDESK (Inspection Reports Only)
i
DOCUMENT NAME:-G:\\S.YSTEMS\\DEMPSEY\\MS98-04.u2
T3 rooshe a copy of this I_~ __ .._4 buBoate in em box: V = Copy whout stachmenWencloswo T = Copy we anachmenWencioews T = No
copt
l OFFICE
Rl/DRS
lq Rl/DPh
l
NRR/EMEB
l E lRl/DRS,
j
l
lNAME
DDempsey tty)
,JDu Q
DTersoVD k y&J 'EKellfrW
lDATE
09/29/98 Q1Mir
09/fe/98
09/7l/98
V
l@p48
09/ /98
OFFICIAL RECORD COPY
l
..
.
- -
__