ML20154C819
| ML20154C819 | |
| Person / Time | |
|---|---|
| Site: | 07000221 |
| Issue date: | 12/31/1985 |
| From: | Glenn J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | |
| Shared Package | |
| ML20154C823 | List: |
| References | |
| NUDOCS 8603050327 | |
| Download: ML20154C819 (1) | |
Text
. ________ _
i fC F m 374A R
M p
g I D
- ]
License number MATERIALS LICENSE Docket or aererence nuNr 1
SUPPLEMENTARY SHEET 1;.
070-00221 k]
Amendment No_ 06 1
"OTC Al RECORD COPY" General Dynamics Corporation y! Electric Boat Division
-]lGroton i
] Eastarn Point Road
}f In accordance with letter dated October
, Connecticut 06340 30, 1985, License Number SNM-205 is amended as j! follows:
l
]
i
']
Conditions 12. and 13. are amended to read:
']
l
-]
12 i
f
. Licensed material shall be used by, or under the supervision of, Eugene T. Reimer, Jr., D. R. Prentice, and individuals trained in accordance with the licensee's I
j procedures entitled " Calibration Facility Qualification Program," dated May 1983.
']
Each encapsulated plutonium source designed for the purpose of emitting neutron
] 13.
A.
or gamma radiation shall be tested for leakage at intervals not to exceed six (6) l 3
[
months.
In the absence of a certificate from a transfer indicating that a test i
has been made within six (6) months prior to the transfer, a sealed source l
3 received from another person shall not be put into use until tested.
I 1
-]
B.
The test shall be capable of detecting the presence of 0.005 microcurie of alpha !
]
contamination on the test sample. The test sample shall be taken from the sourcei f
or from appropriate accessible surfaces of the device in which the sealed source i j
is permanently or semipermanently mounted or stored.
Records of leak test j-results shall be kept in units of microcuries and maintained for inspection by 3
the Commission.
l 3
1 C.
If the test reveals the presence of 0.005 microcurie or more of removable alpha 3
contamination, the licensee shall immediately withdraw the sealed source from use j
and shall cause it to be decontaminated and repaired by a person appropriately 5
licensed to make such repairs or to be disposed of in accordance with the l
1 Commission regulations.
Within five (5) days after determining that any source I
1 nas leaked, the licensee shall file a report with the Material Licensing Branch, l'
- ]1 Division of Fuel Cycle and Material Safety, U. S. Nuclear Regulatory Commission, Washington, D. C. 20555, describing the source, the test results, the extent of i
y contamination, the apparent or suspected cause of source failure, and the L]
corrective action taken. A ccpy of the report shall be sent to the U. S. Nuclear!
- 1 Regulatory Commission, Region I, King of Prussia, Pennsylvania, 19406.
1
))
D.
Tests for leakage and/or contamination shall be performed by Eugene T. Reimer, Jr., D. R. Prentice, or by other other persons specifically authorized by the
- )
Commission or an Agreement State to perform such services.
2a
!]
For the U.S. Nuclear Regulatory Commission
.]
- 1 Originni Signed Byt J&n F. relen l
]Date DEC 311985 By f
Nuclear Materials Safety and Safeguards Branch, Region I l
]l 8603o50327 051231 King of Prussia, Pennsylvania 19406 li REG 1 LIC70 PDR k(
y sNM-oaoS i = = v--~~nm xssmxxmssammmmmmmmxnw.mxam.nn