ML20154C859
| ML20154C859 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 05/12/1988 |
| From: | Matthews D Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML20154C863 | List: |
| References | |
| TAC-62127, TAC-62128, NUDOCS 8805180345 | |
| Download: ML20154C859 (14) | |
Text
-
ga n%
ff UNITE D STATES y
3.-q g
NUCLEAR REGULATORY COMMISSION
-l WASHINGTON, D. C. 20555 r
\\,
/
GEORCIA POWER C0ftPANY t
OGLETHORPE F0WER CORPORATION llVNICIPAL ELECTRIC AUTHORITY OF GEORGIA CITY OF DALTON, GEORGIA t
DOCKET NO. 50-321 EDWIN I. HATCH NUCLEAR PLANT, UNIT NO. 1 AMENOMENT TO FACILITY CPERATING LICENSE Amendment No.
154 License No. DPR-57 1.
The Nuclear Regulatory Comission (the Comission) has found that:
A.
The application for amendment to the Edwin I. Hatch N"clear Plant, Unit 1 (the facility) Facility Operating License No..rR-57 filed 3
by Georgia Power Company, acting for itself. Oglethorpe Power Corporation, Municiaal Electric Authority of Georgia, and City of Dalton, Georgia, (tie licensee) dated September 9, 1986, as supplemented May 8 and December 15, 1987, corplies with the standards a
}
and requirements of the Atomic Energy Act of 1954, as amended (the t
Act), and the Comission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the i
Comission;
)
C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations set forth in 10 CFR Chapter I; D.
The issuance of this amendment will nt,t be inimical to the comun detense and security or to the health and safety of the public; and
~
E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requiraunts have been satisfied.
i l
OG05100345 000512 ADOCK 050 1
gDR
e i
i j i
i 2.
Accordingly, the license is amended by changes to the Technical Specifi-i cations as indicated in the attachment to this license amendment, and l
paragraph 2.C.(2) of Facility Operating License No. DPR-57 is hereby amended to read as follows:
i (2) Technical Specifications l
The Technical Specifications contained in Appendices A and B, as l
revised through Amendment No.154, are hereby incorporated in the license. The licensee shall operate the facility in accordance with j
the Technical Specifications, j
i 3.
This license amendment is effective as of its date of issuance and shall i
be implemented within 60 days of issuance.
j FOR THE NUCLEAR REGULATORY COMMISSION Original signed by:
i i
David B. Matthews, Director j
Project Directorate 11-3 Division of Reactor Projects-I/!!
Attachment:
Changes to the Technical Specifications 1
Date of Issuance:
May 12, 1988 i
\\
i i
r I
I i
0FFICIALRECORDC0Ph
/
t i
!!-3 AB MrM64 LCrocker:
tthews
$l f/jf/88 9/4/88
(( /l$88 q /[88 fM[S/88 5/3/88 i
i i
(
ATTACHMENT TO LICENSE AMENOMENT NO.
154 FACILITY OPERATING LICENSE NO. OPR-57 DOCKET NO. 50-321 Replace the fo lowing pages of the Appendix A Technical Specifications with the enclosed pages.
The revised pages are identified by amendment number and contain vertical lines indicating the areas of change.
Revised Page 3.5-11 3.5-19 3.5-20
(101714G CONDITIONS FOR OPERATION
$URvtitLANCE Rt0UlelCINis 4.5.H.1, Maintenance of Filled Dis-charat Pices (con't) i f rom the high point and water flow observed.
2.
Following any period where the LPCI or core spray sys-tems have not been required to be operable, or have been inoperable the discharge piping of the system or sys-i tems being returned to ser-
)
vice shall be vented from the high point prior to re-i turn of the system to service.
1 3.
Whenever the HPCI or RCIC system is lined up to take suction f rom the condensate storage tank, the discharge piping of the HPCI and RCIC shall be vented from the high point of the system and water flow observed on a monthly basis.
7 i
4 The level switches which monitor the discharge lines shall be functionally tested d
every month and calibrated every three months.
j 3.5.1, Minimum River level 1.
Minimum River level 1.
If the water level, as The water level as measured measured in the pur@ well, in the pump well and the is less than 61.2 feet MSL, level in the river
- shall i
the discharge from each plant be verified with the follow-i i
service water pump will be ing frequencies:
throttled such that each pump does not exceed 7000 gpm.
Level (MSL)
Frecuencv I
2.
If the water level 45 measured 1.
>61.7 feet Biweekly in the pump well decreases to 1ess than 60.7 feet MSL. or if 2.
161.7 feet Every 12 hrs the level in the river
- would drop to a level equivalent to less than I
60.7 feet in the pump well of the i
intake structure, an orderly shut-down of the reactor shall be initiated, and the reactor shall be in the Cold Shutdown Condition within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> untti the level in the river is greater than or equal J
to 60.7 feet MSL equivalent in the pump well.
- 0nly pump well monitoring is required if a temocrary weir is not in place.
l i
i 4
HATCH - UNIT 1 3.5-11
.bnendment No.154 a
~
BASES FOR LIMITING CONDITIONS FOR f Ty i St
.cANCE REQUIREMENTT 3.5.H Maintenance of Filled Discharge Piu,
If the discharge piping of the core spray, LPCI, HPCI system, and RCIC -
system are not filled, a water hamer can develop in this piping when the pump and/or pumps are started.
To minimize damage to the discharge piping and to ensure added margin in the operation of these systems, this Technical Specification requires the discharge lines to be filled whenever the system is in an operable condition.
If a discharge pipe is not filled, the pumps that supply that line must be assumed inoperable for Specification purposes.
The core sprIy and RHR system discharge piping high point vent is visually checked for water flow once a month prior to testing to ensure that the lines are filled.
The visual checking will avoid starting the core spray or RHR system with a discharge line not filled.
Assurance that the HPCI and RCIC discharge piping remains filled is pro-vided by observing water flow frem these system high points monthly.
I.
Minimum River Level A very low flow river stage-discharge relationship was developed at the Plant Hatch intake structure location.
USGS rating cata were available for flows above 1740 cfs at the Baxley gauge (at U.S. Highway No.1 Bridge, which is on the plant site).
This data, which includes bathmetric surveys of the rating cross-section, was used to extend the USGS rating curve by computation.
Since the USGS data used in these computations result in the highest flow for a given low flow stage ever recorded at the location, the computed rating curve should give a conservative low stage for a given flow.
The river rating curve at the Plant Hatch intake structure was developed by subtracting 0.1 ft from the USGS guage evaluation for a given discharge. The 0.1 ft adjustment was determined by level survey when the river level at the USGS guage was approximetely 62 ft (ms1).
At the Plant Hatch site, the river level would be 61.3 ft (ms1) for 1200 cfs which is the low flow of record at Charlotte and 60.8 ft (ms1) for the hypothetical minimum low flow of 950 cfs.
The minimum low flow is important because of its effect on the operation of Plant service water and RHR service water pumps.
The RHR service water pumps at rated flow conditions require, for NPSH, a river stage of only 59.0 feet.
Thus, no further consideration is required on river stage with regard to submergence of these pumps.
At the rated flow of 8500 gpm each for the PSW pumps, 4 feet of submergence will satisfy the NPSH and vortexing requirement.
This corresponds to a stage in the pump well of 61.2 feet.
Normal operation requires about 7840 gpm for each of three pucps.
Shutdown or emergency conditions require only one pump with a discharge flow of 4428 gpm.
This corresponds to a pump well level of 59.9 feet for safe shutdown.
For a 0.1 foot head loss through the trash rack and traveling screen, the corresponding river level would be 60.0 ft (ms1), which corresponds to a flow of 660 cfs.
Sin.ilarly, HATCH - UNIT 1 3.5-19 Amendment No. 154
_. ~ ~ -
.. -. +
BASES FOR LIllITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS
)
I. itinimum River Level (Continued) the river level associated with the shutdown level in the pump well of 60.7 L ft (ms1)'is 60.8 ft (ms1), which corresponds to a flow of 950 cfs.
Therefore, the shutdown level of 60.7 ft (ms1) in the pump well provides an additional margin that ensures that Plant Hatch is protected against incredibly low flows and that the ultimate heat sink (Altamaha River) is available for at least 30 days.
Operationally, it may be desirable to have ',
a higher ' level in the intake structure during power operation because of the larger PSW flow requireraents during plant operation.
Supplementation of the river level or flow is permissible to support power operations.,
River flow is capable of being supplemented by additional discharge from g
upstream reservoirs.
The capability of the upstream, reservoirs to i supplement river flow is approximately 70 days from normal full pool in Lake Oconee.
An additional means of supplementing river stage at the intake structure to support power operation is construction of a temporary weir downstream of the intake structure.
In order to assure the 30 day margin for safe shutdown, a river level measurement is taken at a location not affected by the weir and correlated back to the intake structure. When no weir is in place, it is only necessary to read river level in the pump well and compare with the minimum river level LCO.
i i
)
i I
HATCH - UNIT 1 3.5-20 Amendment No. 154 r
~P ~ ~
" ' ~ ~ ~ " ' ~ ' ~ " ' ' '
- ~~' '
~
' ' ~ '
- ~ * ' '~
[
I',,
UNITED STATES y'3 g
NUCLEAR REGULATORY COMMISSION l
WASHING TON. 0, C. 20555
\\...../
GEORGIA POWER COMPANY OGLETHORPE POWER CORPORATION fiUNICIPAL ELECTRIC AUTHORITY OF GEORGIA
_ CITY OF DALTON, GEORGIA DOCKET NO. 50-366 EDWIN I. HATCH NUCLEAR PLANT, UNIT NO. 2 AMENDMENT TO TACILITY OPEP.ATING LICENSE Amendment No. 92 Licente No. NPF-5 1.
The Nuclear Regulatory Commission (the Comission) has found that:
A.
The app (lication for amendment to the Edwin I. Hatch Nuclear Plant, Unit 2 the facility) Facility Operating License No. NPF-5 filed by Georgia Power Company, acting for itself, Oglethorpe Power Corporation, Punicipal Electric Authority of Georgia, and City of Dalton, Georgia, (tie licensee) dated September 9, 1986, as supplemented May 8 and December 15, 1987, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Comission's rules and regulations set forth in 10 CFR Chapter It B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Comission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations set forth in 10 CFR Chapter I; D.
The issuance of this amendment will not be inimical to the comon defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFrt Part 51 of the Comission's regulations and all applicable requirements have been satisfied.
. 2.
Accordingly, the license is amended by changes to the Technical Specifi-cations as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. NPF-5 is hereby amended to read as follows:
(2) Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 92, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.
3.
This license amendment is effective as of its date of issuance and shall be implemented within 60 days of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION original sigend by:
David B. Matthews Director Project Dit ectorate II-3 Division of Reactor Projects-l/II
Attachment:
Changes to the Technical Specifications Date of Issuance:
May 12, 1988 0FFICIAL RECORD COPY i
LA: D11-3 FN:PDII-3 OGC-q A
__ /11 5
MRb d LCrocker:
- 8 DMtthNs i //J /88 4 / 6 /88
//3/88 T
/88 63 /
y/)/88
ATTACHMENT TO LICENSE AMENDMENT NO. 92 FACILITY OPERATING LICENSE NO. NPF-5 00CKET NO. 50-366 Replace the following pages of the Appendix A Technical Specifications with the encicsed pages.
The revised pages are identified by amendment nurber and contain vertical lines indicating the areas of change.
Revised Pace 3/4 7-3 3/4 7-4 3/4 7-5 B 3/4 7-1 B 3/4 7-la (new page)
PLANT SY$TEMS r
SERVICE WATER SYSTIEMS l
(IMITING CONDITION FOR OPERATION 3.7.1.2 Two independent plant service water system loops and the standby service water subsystem shall be OPERABLE with-4.
The water level in the pump well of the intake structure greater
{
than or equal to:
1.
61.2 feet mean sea level (M3L), or 2.
60.7 feet MSL, with the discharge from each plant service i
water pump throttled such that each pump does not exceed 7000 gpm.
b.
The river level" equivalent to greater than or equal to 60.7 feet MSL l
in the pump well, and l
c.
Each plant service water system loop containing two OPERABLE l
plant service water pumps, and l
d.
The standby service water system containing one OPERABLE stand-l
)
by service water pump.
APPLICABILIJY:
CONDITIONS 1, 2, 3, 4, and 5.
ACTION:
a.
In CONDITION 1, 2, or 3:
1.
With one pleit service water pump inoperable, operation may continue and the provisions of Specification 3.0.4 are not applicable; restore tne inoperable pump to OPERABLE status within 30 days or be in a least HOT SHUTDOWN withir the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> ;,nd in COLD SHUTDOWN within the followiri 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
2.
With one plant service water pump in each loop inoperable, operation may continue and the provisions of Specification 3.0.4 are not applicable; restore at least one inoperable pump to OPERABLE status within 7 days or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
3.
With one plant service water system loop inoperable, restore the inoperable loop to OPERABLE status with at least one OPERABLE pump within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT $HUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
'Only pump well monitoring is required if a temporary weir is not in place.
l HATCH - UNIT 2 3/4 7-3 Amendment No. 92
PLANT SYSTEMS LIMITING CONDITION FOR OPERATION (Continued)
ACTION-(Continued)
'4.
With The standby service water subsystem inoperable for up to 60 days, provide Hatch - Unit I service water
- ooling to the 18 Diesel generator by verifying
'RABILITY of the Hatch - Unit 1 servi:e water cooling source
..e Hatch - Unit I technical specifications within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />. Otherwise, declare the IB diesel generator inoper-able and take the ACTION required by Specification 3.8.1.1.
5.
With water level less than specified in 3.7.1.2.a or 3.7.1.2.b, be in at least HOT SHUT 00WN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
t b.
In CONDITION 4 or 5:
1.
With up to three plant service water pumps or one plant service water loop fnoperable, or 2.
With two plant service water pumps and the standby service water subsystem inoperable, l
restore both plant service water loops with at least one pump in each loop and the standby service water subsystem to OPERABLE status within 7 days or declare the core spray system, the LPCI system and the associated diesel generators inoperable and take the ACTION required by Specifications 3.5.3.1, 3.5.3.2 and 3.8.1.2.
SURVEILLANCE REQUIREMENTS 4.7.1.2 The plant service water system and the standby service water subsystem shall be demonstrated OPERABLE:
By verifying that the water level in the pump well of the intake a.
structure is greater than or equal to 60.7 feet MSL** and the river level
- would correspond to a level in the pump well of the intake structure of greater than or equal to 60.7 feet.
1.
At least once per 14 days when the level in the pump well of the intake structure is above 61.7 feet MSL, and 2.
At least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> when the level in the pump well of the intake structure is less than or equal to 61.7 feet MSL.
- 0nly pump well monitoring is required if a temporary weir is not in place.
- Note the throttling requirements of Specification 3.7.1.2.a.2 HATCH - UNIT 2 3/4 7-4 Amendment No. 92
PLANT SYSTU4S_
SURVEILLANCt.,,00hDITIONS (Continued)
- h. ~
~At Teast once per 31 days by verifying that each valve (manual, power operated or automatic) servicing safety related equipment that is not locked, sealed or otherwise secured in position, is in its correct position.
c.
At l' east once per 12 months by verifying the river bottom conditions in the vicinity of the intake structure.
d.
At least twice per 12 months by verifying the river stage discharge rating curve in the unit vicinity from recent USGS gaging data and computation of a very low flow rating curve to Elevation 60.0 ms1.
e.
At least once per 18 months during shutdown, by verifying that:
1 Each automatic valve servicing non-safety related equip-ment actuates to its isolation position on an isolation test signal.
2.
Each plant service water pump starts automatically, when on Standby, to maintain service water pressure > 60 psig.
3.
The standby service water subsystem pump starts automatically when the 1B diesel generator starts HATCH - UNIT 2 3/4 7-5 Amendment No. 92
- ~ " " '-
_ -, :~
~~~-~2-~~*":-
~-
.~ w -
3/4.7 PLANT SYSTEMS i
Bases 3/4.7.1 SERVICE WATER SYSTEMS The OPERABILITY of the service water systems ensures that sufficient cooling capacity is available for continued operation of safety-related equipment during j
safe shutdown (long term) conditions.
The redundant cooling capacity of these systems, assumir.g a single failure, is consistent with the assumptions used in the accident conditions within acceptable limits.
The minimum water level is based on shutdown cooling requirements and includes NPSH and vortexing l
considerations for the PSW pumps.
Requirements for the PSW pumps are more l
limiting than RHRSW.
At the rated flow of 8500 gpm each for the PSW pumps, 4 feet. of submergence will satisfy the NPSH and vortexing requirement.
This corresponds to a stage in the pump well of 61.2 feet.
Normal operation requires about 7840 gpm for each of three pumps.
Shutdown or emergency conditions require only c1e pump with a discharge flow of 4428 gpm.
This corresponds to a level of 59.9 feet for safe shutdown.
The river level allows for continued operation of the PSW and RHRSW systems for a minimum of 30 days following plant shutdown to bring the plant to long term shutdown condition, and includes allowance for the drop in base river flow due to worst drought conditions.
Operationally, it may be desirable to have a higher level in the intake structure during power operation bec se of the larger PSW flow requirements during plant operation.
Supplementatien of the river level or flow is permissible to support power operations.
River flow is capable of being supplemented by additional discharge of upstream reservoirs.
The capability of the upstream reservoirs to supplement river flow is approxinately 70 days from normal full pool in Lake Oconee.
An additional means of supplementing river stage at the intake structure, to support power operation, is construction of a temporary weir downstream of the intake structure.
In order to assure the 30 day margin for safe shutdown, a river level measurement is taken at a location not affected by the weir and correlated back to the intake structure. When no weir is in place, it is only necessary to read river level in the pump well and compare with the minimum river level LCO.
3p.7.2 MAIN CONTROL ROOM ENVIRONMENTAL CONTROL SYSTEM The OPERABILITY of the main control room environmental control system ensures that (1) the ambient air temperature does not exceed the allowable temperature for continuous duty rating for equipment and instrumentation cooled by this system, and (2) the control room will remain habitable for operations personnel during the following all credible accident conditions.
The OPERABILITY of this system in conjunction with control room design provisions is based on limiting the radiation exposure to personnel occupying the control room to 5 rem or less whole body, or its equivalent.
This limitation is consistent with the requirements of General Design Criterion 10 of Appendix "A",10 CFR Part 50.
HATCH - UNIT 2 B 3/4 7-1 Amendment No. 92 m
~
3/4.7 PLANT SYSTEMS Bases 3/4.7.3 REACTOR CORE ISOLATION COOLING SYSTEM The reactor core isolation cooling (RCIC) system is provided to assure adequate core cooling in the event of reactor isolation from its primary heat sink and the loss of feedwater flow to the reactor vessel without requiring actuation of any of the emergency core cooling equipment.
The RCIC system is
)
conservatively required to be OPERABLE whenever reactor pressure exceeds 150 psig even though the residu?1 heat removal (RHR) system provides adequate core cooling up to 350 psig.
The RCIC system specifications are applicable during CONDITIONS 1,2 and 3 when reactor vessel pressure exceeds 150 psig because RCIC is the primary non-ECCS source of emergency core cooling when the reactor is pressurized.
Two sources of water are available to the RCIC system.
Suction is initially taken from the condensate storage tank and is automatically transferred to the suppression pool upon low CST level or nigh suppression pool level.
With RCIC inoperable, adequate core cooling is assured 'by the demonstrated OPERABILITY OF THE HPCI system and justifies the specified 14 day out-of-service i period.
HATCH - UNIT 2 B 3/4 7-la Amendment No. 92
..o.
......_....._..m__.....
-- ___.-.,