Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20153H046 + (ML20153H046)
- ML20153H047 + (ML20153H047)
- ML20153H048 + (ML20153H048)
- BSEP-88-0853, Followup Special Rept:On 871228,limiting Condition for Operation to Permit Fire Suppression Sprinkler Header from Svc Exceeded.Caused by Unavailability of Addl Flow Switch 2-FP-FS-4059 in Plant Supply Sys.Switch Repaired + (ML20153H050)
- ML20153H052 + (ML20153H052)
- ML20153H056 + (ML20153H056)
- ML20153H057 + (ML20153H057)
- ML20153H060 + (ML20153H060)
- 05000277/LER-1986-003-01, :on 860124,full Reactor Scram Initiated Due to Failure of Diesel Generator E-2.Caused by Failure of Dc Solenoids for MSIVs AO-86B & AO-86D.Solenoids Replaced + (ML20153H064)
- BSEP-88-0850, Special Rept 2-SR-88-002:on 880119,unit Reactor Bldg Fire Detection Sys Zone 14 Instrumentation Declared Inoperable Due to Erroneous Fire Alarms.Limiting Condition for Operation Initiated.Sys Returned to Svc + (ML20153H065)
- ML20153H066 + (ML20153H066)
- ML20153H067 + (ML20153H067)
- ML20153H069 + (ML20153H069)
- ML20153H073 + (ML20153H073)
- ML20153H075 + (ML20153H075)
- ML20153H077 + (ML20153H077)
- ML20153H079 + (ML20153H079)
- ML20153H080 + (ML20153H080)
- ML20153H081 + (ML20153H081)
- ML20153H083 + (ML20153H083)
- ML20153H084 + (ML20153H084)
- ML20153H085 + (ML20153H085)
- ML20153H087 + (ML20153H087)
- PY-CEI-NRR-0839, Responds to NRC Bulletin 88-003, Inadequate Latch Engagement in Hfa Type Latching Relays Mfg by Ge. Relays Not Used in Class 1E (safety-related) Applications.No Further Actions Required by Bulletin + (ML20153H090)
- ML20153H092 + (ML20153H092)
- ML20153H093 + (ML20153H093)
- BSEP-88-0854, Special Rept 1-SR-88-001:limiting Condition for Operation (LCO) Established on 880405 for Fire Protection Deluge Valve 1-FP-DV-22 to Sprinkler Sys.Specified 14-day Time Frame of LCO Exceeded on 880419.Fire Watches Remain in Effect + (ML20153H094)
- ML20153H095 + (ML20153H095)
- ML20153H097 + (ML20153H097)
- ML20153H098 + (ML20153H098)
- ML20153H102 + (ML20153H102)
- ML20153H103 + (ML20153H103)
- ML20153H105 + (ML20153H105)
- ML20153H109 + (ML20153H109)
- ML20153H110 + (ML20153H110)
- ML20153H112 + (ML20153H112)
- ML20153H113 + (ML20153H113)
- ML20153H115 + (ML20153H115)
- ML20153H118 + (ML20153H118)
- ML20153H121 + (ML20153H121)
- ML20153H123 + (ML20153H123)
- ML20153H124 + (ML20153H124)
- ML20153H125 + (ML20153H125)
- ML20153H127 + (ML20153H127)
- ML20153H128 + (ML20153H128)
- ML20153H129 + (ML20153H129)
- 05000457/LER-1988-012, :on 880620,shorting Switch on Relay Casing Intentionally Opened as Part of Reading on Phase B Overcurrent Protective Relay Resulted in Voltage Spike. Caused by Defective Test Switch + (ML20153H130)
- ML20153H132 + (ML20153H132)
- ML20153H133 + (ML20153H133)
- ML20153H134 + (ML20153H134)
- IA-87-764, Final Response to FOIA Request for Documents Re Procurement & Contract Award Process for Contract NRC-02-88-005.Informs That Contract Proposals Requested Available in PDR Under Donnelly File FOIA-87-713.App a Listing Documents Also Encl + (ML20153H135)