ML20153H098

From kanterella
Jump to navigation Jump to search
Forwards Notice of Initiation of Investigation Provided by Ofc of Investigations
ML20153H098
Person / Time
Site: Diablo Canyon  
Issue date: 04/04/1985
From: Palladino N
NRC COMMISSION (OCM)
To: Asselstine, Bernthal, Roberts
NRC COMMISSION (OCM)
Shared Package
ML20151Y970 List: ... further results
References
FOIA-87-444 NUDOCS 8805120124
Download: ML20153H098 (3)


Text

t lp* ***vq'o,,

Cu UNITED STATES c

NUCLEAR REGULATORY COMMISSION n

{

j newtow, o. c. roa6s April 4, 1985 CHA IRIAAN LIMITED DISTRIBUTION MEMORANDUM FOR:

Commissioner Roberts Commissioner Asselstine Commissioner Bernthal Commissioner Zech d

f FROM:

Nunzio J. Palladino I

SUBJECT:

0! NOTICE OF INVESTIGATION Enclosed for your information is a notice of initiation of an investigation provided to me by the Director. 01.

Enclosure:

Diablo Canyon Investigation (5-85-042) cc:

S. Chilk, SECY S. Conne'ly, DIA B. Hayes. 01 H. Plaine, OGC J. Zerbe OPE W. Dircks, EDO LIMITED DISTRIBUTION

/

9805100124 OOO M w w

~"

347

l eA mmun monnam, e

,,, a s.

NfVETTIGATION STAMMRO es, is em a ==== ====e

=

,w, w

w

==.- w D= ga,,==y? * **== **' = e.

. m e, - e-=d.ev.= 'm o=w > a a== m E om..e -

satseer, SMU8 sansename*

i --

,.e mue,.m

~

5-85-042 1 **",,w*.**,*

=.=4 -

01:RY

..e ue DIABLO CANYON - Fonper Docunent M Revtewer for

.sm 3

MEED Pullman Power Discriminated Against for Raising i

simm e-ee m e w a meas Safety-Related Concems i

3/29/85 Case opened this date. A11eger states that a OC doctant reviewer for Pullren Power was discriminated against for raising safety-related concerns, and was eventually forced to accept a lower paying job or be' terminated, i

July 1985 k l

ECD:

l 1

i l

i i

?

4 I

an som en vs. aucum emum, m StVESTIGATION STATUFMRO am m erm.a. m > e= m -

w n

==

,e.

ms.me., W @ W -w -v i.

=.==.,.

m so.

m any e-es.==

  • = o.e a me e

.e.y #g n,

usem.m u,

=

w

.. e,.

, e naw, e

==mam ugmew 5 85-041 E

01:W l,-

~4*** to

"""DIABLO CAM 0et - Foriner QC Inspector for Pullman MEEKS Power Physically Marined and Discriminated Against for rearue m en.w-.w a wRaising Sa fety concerns 3/29/85 Case opened this date. A11eger stated that associate of his was physically pushed or kicked off scaffolding at Diablo Canyon and continually harassed, including threatening phone calls, for raising safety-related concerns pursuant to his fun-tions as a Pullman QC inspector.

ECD: July 1985

- - _ _ - -. _ _ _ _ _ _ _ _ _ _ _ _ _ _. _. - _ __