ML20153H052

From kanterella
Jump to navigation Jump to search
Forwards Notice of Initiation of Investigation Provided by Ofc of Investigations
ML20153H052
Person / Time
Site: Diablo Canyon  
Issue date: 09/17/1984
From: Palladino N
NRC COMMISSION (OCM)
To: Asselstine, Bernthal, Roberts
NRC COMMISSION (OCM)
Shared Package
ML20151Y970 List: ... further results
References
FOIA-87-444 NUDOCS 8805120104
Download: ML20153H052 (2)


Text

'

e ac,g'g n

UNITED STATES

/EhM NUCLEAR REGULATORY COMMISSION n

5-

... E WASHINGTON, D. C. 20555

  • %ff e

September 17, 1984 C> AIR M AN MEMORANDUM FOR:

Commissioner Roberts Commissioner Asselstine Commissioner Bernthal Commissioner Zech I

FROM:

Nunzio J. Palladino

SUBJECT:

01 NOTICE OF INVESTIGATI Attached for your information is a notice of initiation of investigation provided to me by the Director. 01.

cc:

S. Chilk, SECY G. Messenger, OIA B. Hayes, OI W. Dircks, EDO g8g51pg 4 000410 H4MLIN87-444 pop i

senc poem sus uJ, muen. tat NTony cosamesso WivESTIGATION STATUS RECORD in - mi,s=w.

e

,=or= % = -

,aw wyam.n

=

,.e.,

e m av e e wa. =

w w =.== u ne me.weone.a.=a.

ai-= - = = -

on

.t e

-'.e,==e cmum a m os ws m, r=

. ese-euni, uses-

%B4-033

,X,,,c m-01:RV

~

m. pn

  • "g
    • d5' DI A!3LO CANYOH - Discrepancy in Full Panntration '

Welds on % foly inivetion Line to RCS ETATUS sausswr map. p.ur seamam a me.f amassestant 8-24-M Case opened this date involving allegations of a former Systems field Lngineer enployed with Pullaan Power Products at Diablo Canyon Power Plant.

The individual alleged verious construttlun and design errors, particularly on the Reactor Coolant System (KCS) piping.

lhe alleger also fi}ed a complaint writh the Dchertment of Lobur surruuriding the uvents of his tonnination.j CCD: thiknown (f.

m a

m le ~e

.c

$ $n e

.~

N

~.

o G

9 E'

N N

*
  • L ~ : :. - - - -

_..