ML20153H113
| ML20153H113 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 05/10/1988 |
| From: | Corbin McNeil PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | Russell W NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| References | |
| NUDOCS 8805120130 | |
| Download: ML20153H113 (3) | |
Text
.
O PHILADELPHIA ELECTRIC COMPANY 2301 M ARKET STREET P.O. DOX 8699 PHILADELPHI A. PA.19101 C. A. McNEILu, Ja.
(2151 841 5352 Exsevvivs vic e ent slDENT. NUCLE AR Docket Nos.10-277 M-278 Mr. William T. Russell Administrator, Region I U. S. Nuclear Regulatory Commission Washington, EC 20555 Attention:
Docucent Control Desk
Dear Mr. Russell:
Subsequent to issuing Revision 1 of the Plan for Restart of Peach Bottom Atomic Power Station we learned about an editing error in one of the biographical descriptions contained in Section II.
Accordingly, we requested that every individual with biographical data in the Plan individually verify the correctness of their biographical information. As a result of that review, we are attaching a listing of eight raterial corrections which are required.
In addition, there are several minor editorial corrections or clarifications in the Plan that will te included in any subsequent revision to our Plan if such revision is otherwise required.
If you or your staff have any questions about our Restart Plan, please do not hesitate to contact ce.
Sincerely, cc:
Addresses R. E. Martin, Project Manager T. P. Johnson, Resident 8805120130 880510 PDR ADOCK 05000277
\\
p DCD
IF ERRATA PIAN FOR RESTART OF PEACH BOTTOM ATOMIC POWER STATION SECTION I CORPCRATE ACTION, (REVISION 1) 1.
Page 88, W. T. Ullrich biographical data Lines 4 and 5: change "he served in that role until 1984" to read "he served in that role until February 1983" i
l Line 6: change "Generation Division" to "Services".
Line 6: Insert new sentence af ter "Services" and before "In thrch 1986" l
as follows:
l "In February 1984, he assumed responsibilities as Superintendent, Nuclear i
Generation Division."
l 2.
Page 95, J. M. Pratt biographical dati l
Line 3: change "chairman of the ASQC" to "a member of the ASQC".
l l
l l
l 1
lo
.o l
DtRATA i
l PLAN FOR RESTART OF PEACH BOTTON ATONIC POWER STATION i-l SECTION II l
PBAPS ACTION, REVISION I 1
1' 1.
Page 131, G. R. Rainey biographical data Line 6: change "where he held an SRO license." to read "where he j
completed an SRO cold license certification."
H 2.
Page 133, D.P. LeQuia biographical data i
Lines 7 and 8: Rewrite as follows:
"brings over 13 years of experience i
as a Radiation Specialist, including 11/2 years with the Nuclear Regulatory Commission, to his new position."
t 3.
Page 140, D. B. Warfel biographical data i
l Line 2: change "1974" to "1977" and "Electrical" to "Mechanical" I
Line 4: change "1974" to "1977" 4.
Page 142, J. T. Netzer biographical data Line 8: change "Superintendent in charge of Startup" to "Superintendent l
in charge of Startup Support" 1
l 5.
Page 144, J. C. Oddo biographical data I
Line 11: change "nuclear security operation at LILC0" to "nuclear I
security training program at LILC0".
1 1
6.
Page 147, J. H. Pratt biographical data I
Line 3: change "chairman of the ASQC" to "a member of the ASQC" i
I i
a
.