Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20151K029 + (ML20151K029)
- ML20151K032 + (ML20151K032)
- 05000271/LER-1988-002, :on 880301,main Steam Relief Valve Discovered Above Setpoint & Main Steam Safety Valve Found Bound. Cause Undetermined.No Immediate Operator Actions Necessary + (ML20151K037)
- LR-N970482, Requests That Last Page of Attachment 3 of Ltr LR-N970217 Dtd 970619,which Was Omitted,Be Inserted in Copy + (ML20151K041)
- ML20151K042 + (ML20151K042)
- B16612, Forwards Response to 970626 RAI Re Proposed Rev to TS Surveillance 4.8.2.1.c.4 + (ML20151K044)
- ML20151K051 + (ML20151K051)
- B16642, Provides 120-day Response to GL 97-01, Degradation of CR Drive Mechanism Nozzle & Other Vessel Closure Head Penetrations + (ML20151K053)
- ML20151K056 + (ML20151K056)
- ML20151K060 + (ML20151K060)
- ML20151K061 + (ML20151K061)
- AECM-88-0142, Special Rept 87-007/1:on 871218,emergency Diesel Generator Trip Occurred During Surveillance Due to Component Malfunctions.Vendor Could Not Identify Malfunction or Determine Cause.Governor Replace.No Further Action Planned + (ML20151K063)
- ML20151K066 + (ML20151K066)
- NG-97-1353, Informs of Withdrawal of Relief Request VR-23 in Response to NRC Action Item of DAEC Inservice Testing Program + (ML20151K068)
- BECO-88-113, Forwards Rept of Tests,Changes & Experiments for 870122-880122 + (ML20151K070)
- ML20151K074 + (ML20151K074)
- ML20151K078 + (ML20151K078)
- ML20151K080 + (ML20151K080)
- ML20151K082 + (ML20151K082)
- ML20151K083 + (ML20151K083)
- ML20151K084 + (ML20151K084)
- ST-HL-AE-5710, Forwards Graphs & Accompanying Description Demonstrating Progress Being Made in Liquid Waste Reduction,In Response to Question Re Liquid Waste Effluents + (ML20151K086)
- ML20151K088 + (ML20151K088)
- ML20151K090 + (ML20151K090)
- ML20151K092 + (ML20151K092)
- ML20151K096 + (ML20151K096)
- ML20151K097 + (ML20151K097)
- ML20151K098 + (ML20151K098)
- ML20151K099 + (ML20151K099)
- ML20151K100 + (ML20151K100)
- ML20151K102 + (ML20151K102)
- ML20151K104 + (ML20151K104)
- ML20151K105 + (ML20151K105)
- ML20151K110 + (ML20151K110)
- ML20151K111 + (ML20151K111)
- ML20151K114 + (ML20151K114)
- ML20151K118 + (ML20151K118)
- ML20151K120 + (ML20151K120)
- 3F0979-13, Forwards Three NPDES Permit Noncompliances Which Occurred in June 1997 at Crystal River,Per Plant Environ Protection Plan,App B to Operating License + (ML20151K133)
- ML20151K134 + (ML20151K134)
- ML20151K136 + (ML20151K136)
- ML20151K142 + (ML20151K142)
- ML20151K145 + (ML20151K145)
- ML20151K148 + (ML20151K148)
- ML20151K153 + (ML20151K153)
- ML20151K158 + (ML20151K158)
- ML20151K170 + (ML20151K170)
- NRC-97-0070, Responds to NRC Re Violations Noted in Insp Rept 50-341/97-03.Corrective Actions:Training Program & Maintenance Procedures for MOV Maintenance & Testing Reviewed to Verify That Adequate Controls Exist + (ML20151K171)
- ML20151K174 + (ML20151K174)
- ML20151K179 + (ML20151K179)
- ML20151K181 + (ML20151K181)