Final Deficiency Rept (Unit 1) & Interim Deficiency Rept (Unit 2) CP-86-35 Re Motor Operators in Several Valves in Main Steam Sys.Initially Reported on 860602.Unit 1 Design Mod to Be Completed by 880708.Next Rept Expected by 891231
ML20151K098
Person / Time
Site: Comanche Peak  
Issue date: 04/15/1988
From: Counsil W
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
CP-86-35, TXX-88390, NUDOCS 8804210249
Download: ML20151K098 (1)


Text

,

==

F7 Log # TXX 88390

~.

.=

Fi1e # 10110 C

Z 903.9 TUELECTRIC Ref. # 10CFR50.55(e)

$3",'",j:Jy"'",,,

April 15, 1988 U. S. Nuclear Regulatory Commission Attn:

Document Control Desk Washington, D.C.

20555

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET NOS. 50-445 AND 50-446 MOTOR OPERATORS FOR MANUAL VALVES SDAR: CP-86-35 (FINAL REPORT - UNIT 1)

(INTERIM REPORT - UNIT 2)

Gentlemen:

On June 2, 1986, we notified you by our report logged TXX-4840 of a reportable item involving the motor operators for several valves in the main steam system.

The purpose of this report is to revise the corrective action implementation schedule for this issue.

The Unit 1 design modification is currently scheduled for completion by July 8, 1988.

Unit 2 activities will be discussed in our next report which will be submitted no later than December 31, 1989.

Very truly yours W

W. G. Counsil JDS/mgt c-Mr. R. D. Martin, Region IV Resident inspectors CPSES (3) 8804210249 880415 PDR ADOCK 05000445