Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20138R083 + (ML20138R083)
- ML20138R084 + (ML20138R084)
- ML20138R085 + (ML20138R085)
- ML20138R086 + (ML20138R086)
- ML20138R087 + (ML20138R087)
- ML20138R089 + (ML20138R089)
- ML20138R092 + (ML20138R092)
- 05000325/LER-1985-056, :on 851010,surveillance Test to Verify Slope of APRM Flow Bias Thermal Trip & Upscale Alarm Deemed Inadequate.Caused by Inappropriate Procedural Rev in Oct. Revs for Proper Testing Planned + (ML20138R095)
- ML20138R096 + (ML20138R096)
- ML20138R097 + (ML20138R097)
- ML20138R098 + (ML20138R098)
- A05307, Responds to Violations Noted in Insp Rept 50-245/85-15. Corrective Actions:Written Procedures Specifying Calibr Requirements Developed,Reviewed & Approved for safety-related Feedwater Coolant Injection Sys + (ML20138R099)
- ML20138R100 + (ML20138R100)
- ML20138R102 + (ML20138R102)
- ML20138R103 + (ML20138R103)
- ML20138R104 + (ML20138R104)
- ML20138R105 + (ML20138R105)
- ML20138R106 + (ML20138R106)
- ML20138R107 + (ML20138R107)
- ML20138R109 + (ML20138R109)
- ML20138R110 + (ML20138R110)
- ML20138R112 + (ML20138R112)
- 05000255/LER-1985-020, :on 851008,discovered That Scheduled Date for Main Steam & Feedwater Sys Hydrostatic Test Exceeded ASME Required Time Interval.Caused by Misinterpretation of Requirements.Review Performed + (ML20138R113)
- ML20138R114 + (ML20138R114)
- ML20138R115 + (ML20138R115)
- ML20138R116 + (ML20138R116)
- ML20138R118 + (ML20138R118)
- ML20138R120 + (ML20138R120)
- ML20138R122 + (ML20138R122)
- ML20138R123 + (ML20138R123)
- ML20138R124 + (ML20138R124)
- ML20138R125 + (ML20138R125)
- U-600324, Notifies That Rev 0 to State of Il Plan for Radiological Accidents,Clinton Annex,Map E Includes List Entitled, Clinton Nuclear Power Station Medical Facility Identification List, Per NRC Response to Guard Remand + (ML20138R126)
- ML20138R128 + (ML20138R128)
- B11864, Provides Status of Final tie-ins Re Degraded Grid Protection for Class 1E Power Sys.Redesign & Procurement Completed in Time to Support Final Implementation During 1987 Refueling outage.Mid-cycle Implementation Not Feasible + (ML20138R129)
- ML20138R131 + (ML20138R131)
- ML20138R132 + (ML20138R132)
- ML20138R133 + (ML20138R133)
- ML20138R136 + (ML20138R136)
- BECO-85-135, Rept of Changes,Tests & Experiments Performed at Facility for 840122-850121 + (ML20138R138)
- ML20138R144 + (ML20138R144)
- ML20138R146 + (ML20138R146)
- ML20138R147 + (ML20138R147)
- ML20138R148 + (ML20138R148)
- ML20138R149 + (ML20138R149)
- ML20138R150 + (ML20138R150)
- ML20138R151 + (ML20138R151)
- ML20138R152 + (ML20138R152)
- RBG-22-514, Final Deficiency Rept DR-193 Re post-LOCA Passive Failure in ECCS Suction Line in Auxiliary Bldg Crescent Area.Initially Reported on 850114.Suppression Pool Pumpback Sys Intended to Mitigate post-LOCA Passive Failures + (ML20138R153)
- ML20138R154 + (ML20138R154)
- ML20138R155 + (ML20138R155)