Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20138P463 + (ML20138P463)
- 05000423/LER-1995-019-01, :on 951201,reactor Coolant Sys Pressure Boundary Leak Occurred Due to Instrument Line & Drain Line Socket Weld Failure.All 16 RCS Loop Flow Instrument Line Socket & Weld Bosses Have Been Cut & Removed + (ML20138P465)
- ST-HL-AE-1551, Final Deficiency Rept Re Use of Partially Threaded Bolts on Conduit Supports.Initially Reported on 851114.Based on Tests & Spec Requirements,Allowed Matl & Methods Adequate.Item Not Reportable Under 10CFR50.55(e) + (ML20138P466)
- ML20138P468 + (ML20138P468)
- ML20138P469 + (ML20138P469)
- ML20138P470 + (ML20138P470)
- ML20138P472 + (ML20138P472)
- ML20138P473 + (ML20138P473)
- 05000341/LER-1985-068, :on 851001,reactor Feed Pump Turbine Tripped at Level 8 Setpoint After Pressure Drop Due to Opening of Turbine Bypass Valves.Caused by Discontinuity in Potentiometer.Potentiometer Replaced + (ML20138P474)
- ML20138P476 + (ML20138P476)
- ML20138P477 + (ML20138P477)
- ML20138P479 + (ML20138P479)
- ML20138P480 + (ML20138P480)
- ML20138P481 + (ML20138P481)
- ML20138P483 + (ML20138P483)
- ST-HL-AE-1545, First Interim Deficiency Rept Re Discrepancies in motor- Operated Valves.Initially Reported on 851119.Insp Program Initiated to Review safety-related motor-operated Valves. Next Rept Will Be Sent by 860311 + (ML20138P484)
- ML20138P485 + (ML20138P485)
- ML20138P489 + (ML20138P489)
- ML20138P490 + (ML20138P490)
- ML20138P491 + (ML20138P491)
- U-600074, Amended Final Deficiency Rept 55-83-06 Re Inadequate Vendor Shop Welding on Rockwell Engineering Structural Steel Members.Initially Reported on 830427.Condition Not Reportable Per 10CFR50.55(e) + (ML20138P493)
- ML20138P494 + (ML20138P494)
- ML20138P495 + (ML20138P495)
- TXX-4650, Deficiency Rept SDAR-188 Re Width of as-built Seismic Gap Between All Major Plant Structures.Issue Being Pursued Under Comanche Peak Response Team Program Plan Item Iic + (ML20138P496)
- ML20138P497 + (ML20138P497)
- ML20138P498 + (ML20138P498)
- U-600301, Final Deficiency Rept 55-85-06 Re Wiring & Workmanship Defects in safety-related Electrical Panels.Initially Reported on 850626.Panels Reworked & Engineering Drawings Corrected + (ML20138P499)
- 05000245/LER-1985-029, :on 851126,during Bench Checks of Main Steam Safety/Relief Valves,All Six Valves Lifted at Pressures Exceeding Tech Spec Limit.Caused by High Friction at Labyrinth Seal in Valve Topworks + (ML20138P500)
- ML20138P502 + (ML20138P502)
- 05000259/LER-1985-053, :on 851118,during 10CFR50,App J Review, Determined That Valve Packing on HPCI Turbine Exhaust Valve, RCIC Turbine Exhaust Valve & Turbine Condenser Vacuum Pump Discharge Valve Not Checked + (ML20138P504)
- ML20138P505 + (ML20138P505)
- ML20138P508 + (ML20138P508)
- 05000361/LER-1985-056, :on 851114,Train a Containment Purge Isolation Sys Spuriously Actuated Due to Electrical Noise Spike on Containment Area Radiation Monitor 2RT-7856.Caused by Ground Current Surges Entering Detector + (ML20138P509)
- ST-HL-AE-5593, Annual Radioactive Effluent Release Rept for 1996 for South Tx Project Electric Generating Station + (ML20138P511)
- ML20138P512 + (ML20138P512)
- ML20138P514 + (ML20138P514)
- ML20138P516 + (ML20138P516)
- ML20138P517 + (ML20138P517)
- ML20138P519 + (ML20138P519)
- ML20138P520 + (ML20138P520)
- ML20138P521 + (ML20138P521)
- IR 05000424/1985057 + (ML20138P523)
- ML20138P524 + (ML20138P524)
- ML20138P525 + (ML20138P525)
- ML20138P526 + (ML20138P526)
- ML20138P527 + (ML20138P527)
- ML20138P528 + (ML20138P528)
- ML20138P529 + (ML20138P529)
- ML20138P530 + (ML20138P530)
- ML20138P531 + (ML20138P531)
- ML20138P532 + (ML20138P532)