ML20138P469
| ML20138P469 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 12/23/1985 |
| From: | Tucker H DUKE POWER CO. |
| To: | Harold Denton, Youngblood B Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20138P472 | List: |
| References | |
| NUDOCS 8512260129 | |
| Download: ML20138P469 (1) | |
Text
DuxE POWER GOMPANY P.o. anox 03:30 t
CHAMIAYrTE. N.C. 28242 HAL II. TUCKER me.umn vw. m (IO'Oh III@'$$$$
December 23, 1985 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Attention:
Mr. B. J. Youngblood, Project Director PWR Project Directorate No. 4
Subject:
Catawba Nuclear Station Unit 2 Docket No. 50-414
Dear Mr. Denton:
Enclosed are the results of the inspections and evaluations performed on the Catawba 2B diesel engine. Following these inspections, the 2B diesel experi-enced two failures of main bearing No. 7 during return-to-service testing.
Causes and corrective actions will be discussed in a followup report pursuant to 10 CFR 50.55e.
Very truly yours.
W 4
Hal B. Tucker ROS/hrp Enclosures cc:
Dr. J. Nelson Grace, Regional Administrator U. S. Nuclear Regualtory Commission Region 11 101 Marietta Street,IN, Suite 2900 Atlanta, Georgia 30323 NRC Resident inspector Catawba Nuclear Station 8512260129 851223 PDR ADOCK 05000414 5 G
PDR Aeol
'lo a-
-