Category:CORRESPONDENCE-LETTERS
MONTHYEARNOC-AE-000675, Forwards Clarification on Items Included in 990531 Response to RAI Re Proposed License Amend Associated with Operator Action for Sbloca,As Requested1999-10-21021 October 1999 Forwards Clarification on Items Included in 990531 Response to RAI Re Proposed License Amend Associated with Operator Action for Sbloca,As Requested NOC-AE-000680, Forwards Rev 5 to 0PGP03-ZV-0001, Severe Weather Plan1999-10-20020 October 1999 Forwards Rev 5 to 0PGP03-ZV-0001, Severe Weather Plan NOC-AE-000683, Forwards 30-day Rept Concerning Significant Changes to Accepted Large Break Loss of Coolant Accident ECCS Evaluation Model for South Tx Project,Units 1 & 2,IAW 10CFR50.46(a)(3)(ii)1999-10-19019 October 1999 Forwards 30-day Rept Concerning Significant Changes to Accepted Large Break Loss of Coolant Accident ECCS Evaluation Model for South Tx Project,Units 1 & 2,IAW 10CFR50.46(a)(3)(ii) ML20217K9341999-10-15015 October 1999 Forwards SER Accepting Util 990609 Relief Request RR-ENG-2-4 for Relief from ASME Code,Section XI, Nondestructive Exam Requirements Applicable to Stp,Units 1 & 2,reactor Vessel Closure Head Nuts ML20217K9091999-10-15015 October 1999 Forwards SER Accepting Util 990609 Relief Request RR-ENG-2-3 from ASME Code,Section Xi,Nondestructive Exam Requirements Applicable to South Texas Project,Units 1 & 2, Pressurizer Support Attachment Welds 05000498/LER-1999-008, Forwards LER 99-008-00 Re Turbine Trip That Occurred While Performing Main Turbine Emergency Trip Test.Commitments Made by Licensee Are Listed in Corrective Actions Section of LER1999-10-12012 October 1999 Forwards LER 99-008-00 Re Turbine Trip That Occurred While Performing Main Turbine Emergency Trip Test.Commitments Made by Licensee Are Listed in Corrective Actions Section of LER NOC-AE-000674, Forwards Requested Estimates of Needs for Operator Licensing Exams,Per AL-99-03, Operator Licensing National Exam Schedule1999-10-12012 October 1999 Forwards Requested Estimates of Needs for Operator Licensing Exams,Per AL-99-03, Operator Licensing National Exam Schedule NOC-AE-000625, Requests Partial Relief from ASME Section XI Visual Exam Requirements of IWA-5242(a).Relief Request Is Based on Provisions of Draft ASME Section XI Code Case N-616,which Is Expected to Be Published in Near Future1999-10-0707 October 1999 Requests Partial Relief from ASME Section XI Visual Exam Requirements of IWA-5242(a).Relief Request Is Based on Provisions of Draft ASME Section XI Code Case N-616,which Is Expected to Be Published in Near Future NOC-AE-000610, Requests Relief from ASME Section XI Code Nondestructive Exam Requirements of IWA-5250(a)(2) for Second Inservice Insp Interval,Per Provisions of 10CFR50.55a(3)(i)1999-10-0707 October 1999 Requests Relief from ASME Section XI Code Nondestructive Exam Requirements of IWA-5250(a)(2) for Second Inservice Insp Interval,Per Provisions of 10CFR50.55a(3)(i) NOC-AE-000653, Requests Relief from ASME Section XI Code Requirements of Table IWE-2500-1 for VT-3 Visual Exam of Seals & Gaskets on Airlocks,Hatches & Other Devices Required to Assure Containment leak-tight Integrity,Per 10CFR50.55a(a)(3)(i)1999-10-0707 October 1999 Requests Relief from ASME Section XI Code Requirements of Table IWE-2500-1 for VT-3 Visual Exam of Seals & Gaskets on Airlocks,Hatches & Other Devices Required to Assure Containment leak-tight Integrity,Per 10CFR50.55a(a)(3)(i) ML20217C3221999-10-0707 October 1999 Forwards Insp Repts 50-498/99-16 & 50-499/99-16 on 990808-0918.No Violations Noted.Insp Generally Characterized by safety-conscious Operations,Sound Engineering & Maint Practices & Careful Radiological Work Controls 05000499/LER-1999-006, Forwards LER 99-006-00,re Entry Into TS 3.0.3.Licensee Commitments Listed in Corrective Actions Section of Attachment1999-09-30030 September 1999 Forwards LER 99-006-00,re Entry Into TS 3.0.3.Licensee Commitments Listed in Corrective Actions Section of Attachment ML20212L1651999-09-30030 September 1999 Responds to STP Nuclear Operating Co 981012 & s Which Provided Update to TS Bases Pages B 3/4 8-14 Through B 3/4 8-17.NRC Staff Found Change Consistent with TS 3/4.8.2 DC Sources. Staff Found & Deleted Typographical Error NOC-AE-000664, Forwards Rev 1 to STP Electric Generating Station Unit 1 Cycle 9 COLR & Rev 1 to STP Electric Generating Station Unit 2 Cycle 7 Colr1999-09-30030 September 1999 Forwards Rev 1 to STP Electric Generating Station Unit 1 Cycle 9 COLR & Rev 1 to STP Electric Generating Station Unit 2 Cycle 7 Colr ML20212J7141999-09-29029 September 1999 Forwards Insp Repts 50-498/99-15 & 50-499/99-15 on 990920-24 at South Texas Project Electric Generating Station.No Violations Noted.Insp Covered Requalification Training Program & Observation of Requalification Activities NOC-AE-000646, Informs NRC That STP Nuclear Operating Co Is Y2K Ready IAW Nei/Nusmg 97-07 Guidelines & Also Provides Response to NRC Ltr1999-09-28028 September 1999 Informs NRC That STP Nuclear Operating Co Is Y2K Ready IAW Nei/Nusmg 97-07 Guidelines & Also Provides Response to NRC Ltr ML20212J0651999-09-27027 September 1999 Discusses Licensee 980330 Response to GL 97-06, Degradation of SG Internals. Concludes That Response to GL Provides Reasonable Assurance That Condition of SG Internals in Compliance with Current Licensing Bases for Facility ML20212F1791999-09-24024 September 1999 Discusses 990923 Meeting Conducted in Region IV Ofc Re Status of Activities to Support Confirmatory Order, ,modifying OL & to Introduce New Director,Safety Quality Concerns Program.List of Attendees Encl ML20212E9091999-09-23023 September 1999 Discusses GL 98-01, Year 2000 Readiness of Computer Sys at Npps, Supplement 1 & STP Nuclear Operating Co Response for STP Dtd 990629.Understands That at Least One Sys or Component Listed May Have Potential to Cause Transient ML20212F2111999-09-22022 September 1999 Forwards Review of SG 90-day Rept, South Texas Unit-2 Cycle 7 Voltage-Based Repair Criteria Rept, Submitted by Util on 990119 NOC-AE-000633, Forwards Rev 3 to SG-99-04-005, STP 1RE08 Outage Condition Monitoring Rept & Final Operational Assessment. Rept Satisfies Reporting Requirements of NEI 97-06,dtd Dec 19971999-09-21021 September 1999 Forwards Rev 3 to SG-99-04-005, STP 1RE08 Outage Condition Monitoring Rept & Final Operational Assessment. Rept Satisfies Reporting Requirements of NEI 97-06,dtd Dec 1997 NOC-AE-000634, Forwards Addl Info Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Povs. MOV design-basis Review Checklist,Encl1999-09-21021 September 1999 Forwards Addl Info Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Povs. MOV design-basis Review Checklist,Encl NOC-AE-000649, Forwards Current Annual Financial Data for STP Electric Generating Station Per 10CFR50.71(b),acting on Behalf of Central Power & Light Co,City of Austin,Tx,City Public Svc Board of San Antonio & Hl&P1999-09-21021 September 1999 Forwards Current Annual Financial Data for STP Electric Generating Station Per 10CFR50.71(b),acting on Behalf of Central Power & Light Co,City of Austin,Tx,City Public Svc Board of San Antonio & Hl&P 05000499/LER-1999-005, Forwards LER 99-005-00,re Esfa Following Loss of Power to Standby Transformer 2 Due to Electrical Fault.Licensee Commitments Are Listed in Corrective Actions Section of LER1999-09-20020 September 1999 Forwards LER 99-005-00,re Esfa Following Loss of Power to Standby Transformer 2 Due to Electrical Fault.Licensee Commitments Are Listed in Corrective Actions Section of LER ML20212D9171999-09-16016 September 1999 Informs That on 990818,NRC Completed Midcycle PPR of South Texas Project & Identified No Areas in Which Performance Warranted Insp Beyond Core Insp Program.Details of Insp Plan Through Mar 2000 & Historical Listing of Plant Issues,Encl ML20216F5471999-09-15015 September 1999 Discusses 990914 Meeting Conducted at Region Iv.Meeting Was Requested by Staff to Introduce New Management Organization to Region IV & to Discuss General Plant Performance & Mgt Challenges IR 05000498/19990121999-09-14014 September 1999 Forwards Insp Repts 50-498/99-12 & 50-499/99-12 on 990816-19.Three Violations Occurred & Being Treated as Ncvs. Areas Examined During Insp Included Portions of Access Authorization & Physical Security Programs 05000498/LER-1999-007, Forwards LER 99-007-00 Re Train 'B' CR Makeup & Cleanup Filtration Sys Being Inoperable for Greater than Aot.Util Intends to Append Addl Info Section of LER with Brief Description of Test Results,Rather than Submit Separate LER1999-09-13013 September 1999 Forwards LER 99-007-00 Re Train 'B' CR Makeup & Cleanup Filtration Sys Being Inoperable for Greater than Aot.Util Intends to Append Addl Info Section of LER with Brief Description of Test Results,Rather than Submit Separate LER ML20211P8201999-09-0909 September 1999 Forwards SE Authorizing 990224 Submittal of First 10-year Interval ISI Program Plan - Relief Request RR-ENG-24,from ASME Section XI Code,Table IWC-2500-1 NOC-AE-000638, Forwards License Renewal Applications & Certifications of Medical Exam for Seven Listed Licensed Operators at Stp,Per 10CFR55.57.Encl Withheld,Per 10CFR2.790(a)(6)1999-09-0909 September 1999 Forwards License Renewal Applications & Certifications of Medical Exam for Seven Listed Licensed Operators at Stp,Per 10CFR55.57.Encl Withheld,Per 10CFR2.790(a)(6) ML20211P7671999-09-0909 September 1999 Forwards SER Authorizing Licensee 990517 Alternative Proposed in Relief Request RR-ENG-2-8 to Code Case N-491-2 for Second 10-year Insp Interval of South Texas Project, Units 1 & 2,pursuant to 10CFR50.55a(a)(3)(i) ML20211P7871999-09-0909 September 1999 Forwards Safety Evaluation Re First 10-yr Interval Inservice Insp Program Plan Request for Relief RR-ENG-31 IR 05000498/19990141999-09-0303 September 1999 Forwards Insp Repts 50-498/99-14 & 50-499/99-14 on 990627-0807.Apparent Violations Identified & Being Treated as Noncited Violations Consistent with App C of Enforcement Policy NOC-AE-000562, Requests Relief from Contruction Code non-destructive Exam Requirements for Repair/Replacement Activities During Second Inservice Insp Interval of Units 1 & 2,IAW Provisions of 10CFR50.55a(a)(3)(i)1999-08-31031 August 1999 Requests Relief from Contruction Code non-destructive Exam Requirements for Repair/Replacement Activities During Second Inservice Insp Interval of Units 1 & 2,IAW Provisions of 10CFR50.55a(a)(3)(i) ML20212A4351999-08-27027 August 1999 Discusses Investigation Rept OI-4-1999-009 Re Activites at South Texas Project.Oi Investigation Initiated in Response to Alleged Employment Discrimination Complaint. Allegation Not Substantiated.No Further Action Planned NOC-AE-000617, Forwards semi-annual Fitness for Duty Program Performance Rept for 990101-990630,IAW 10CFR26.71(d)1999-08-26026 August 1999 Forwards semi-annual Fitness for Duty Program Performance Rept for 990101-990630,IAW 10CFR26.71(d) ML20211J2511999-08-26026 August 1999 Discusses Proposed TS Change on Replacement SG Water Level Trip Setpoint for Plant,Units 1 & 2 NOC-AE-000585, Provides Notification That South Texas Project Has Completed Integrity Evaluation of Units 1 & 2 Reactor Coolant Pump Casings Required by Paragraph (D) of Code Case N-4811999-08-25025 August 1999 Provides Notification That South Texas Project Has Completed Integrity Evaluation of Units 1 & 2 Reactor Coolant Pump Casings Required by Paragraph (D) of Code Case N-481 ML20211F4421999-08-24024 August 1999 Forwards SE Authorizing Licensee 990513 Request for Relief RR-ENG-2-13,seeking Relief from ASME B&PV Code Section Xi,Exam Vessel shell-to-flange Welds for Second ISI Intervals ML20211F5031999-08-23023 August 1999 Forwards SE Authorizing Licensee 990315 Request for Relief RR-ENG-30,seeking Relief from ASME B&PV Code,Section Xi,Nde Requirements Applicable to Stp,Unit 2 SG Welds ML20212A4391999-08-17017 August 1999 Discusses Investigation Rept OI-4-1999-023 Re Activities at South Texas Project.Oi Investigation Initiated in Response to Alleged Employment Discrimination for Initiating Condition Report to Document Unauthorized Work Practices ML20210U1271999-08-16016 August 1999 Forwards Insp Repts 50-498/99-08 & 50-499/99-08 on 990517-21 & 0607-10.No Violations Noted.Corrective Action Program Was Reviewed ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20211B7881999-08-10010 August 1999 Transmits Summary of Two Meetings with Risk-Informed TS Task Force in Rockville,Md on 990514 & 0714 ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams NOC-AE-000603, Informs of Addition of Restriction to SRO License 42658, for KM Espinoza,Effective 990721,per 10CFR50.74.Encl Info Withheld,Per 10CFR2.790(a)(6)1999-07-29029 July 1999 Informs of Addition of Restriction to SRO License 42658, for KM Espinoza,Effective 990721,per 10CFR50.74.Encl Info Withheld,Per 10CFR2.790(a)(6) NOC-AE-000470, Forwards Amend 12 to STP Fire Hazards Analysis Rept. Summary of Changes Made Under Provision of 10CFR50.59 Also Encl1999-07-28028 July 1999 Forwards Amend 12 to STP Fire Hazards Analysis Rept. Summary of Changes Made Under Provision of 10CFR50.59 Also Encl NOC-AE-000599, Forwards STP Unit 1,Cycle 9 Startup Testing Summary Rept. No New Licensing Commitments Contained in Ltr1999-07-28028 July 1999 Forwards STP Unit 1,Cycle 9 Startup Testing Summary Rept. No New Licensing Commitments Contained in Ltr NOC-AE-000589, Forwards Rev to 1RE08 ISI Summary Repts for Repairs & Replacements & for Sys Pressure Tests,Corecting Date of End of Insp Interval Provided in Item 9 of from NIS-1 from 09/24/99 to 09/24/20001999-07-26026 July 1999 Forwards Rev to 1RE08 ISI Summary Repts for Repairs & Replacements & for Sys Pressure Tests,Corecting Date of End of Insp Interval Provided in Item 9 of from NIS-1 from 09/24/99 to 09/24/2000 ML20210F3851999-07-26026 July 1999 Forwards Exam Repts 50-498/99-301 & 50-499/99-301 on 990706- 15.Exam Included Evaluation of 9 Applicants for SO Licenses & 8 Applicants for RO Licenses 1999-09-09
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARNOC-AE-000675, Forwards Clarification on Items Included in 990531 Response to RAI Re Proposed License Amend Associated with Operator Action for Sbloca,As Requested1999-10-21021 October 1999 Forwards Clarification on Items Included in 990531 Response to RAI Re Proposed License Amend Associated with Operator Action for Sbloca,As Requested NOC-AE-000680, Forwards Rev 5 to 0PGP03-ZV-0001, Severe Weather Plan1999-10-20020 October 1999 Forwards Rev 5 to 0PGP03-ZV-0001, Severe Weather Plan NOC-AE-000683, Forwards 30-day Rept Concerning Significant Changes to Accepted Large Break Loss of Coolant Accident ECCS Evaluation Model for South Tx Project,Units 1 & 2,IAW 10CFR50.46(a)(3)(ii)1999-10-19019 October 1999 Forwards 30-day Rept Concerning Significant Changes to Accepted Large Break Loss of Coolant Accident ECCS Evaluation Model for South Tx Project,Units 1 & 2,IAW 10CFR50.46(a)(3)(ii) NOC-AE-000674, Forwards Requested Estimates of Needs for Operator Licensing Exams,Per AL-99-03, Operator Licensing National Exam Schedule1999-10-12012 October 1999 Forwards Requested Estimates of Needs for Operator Licensing Exams,Per AL-99-03, Operator Licensing National Exam Schedule 05000498/LER-1999-008, Forwards LER 99-008-00 Re Turbine Trip That Occurred While Performing Main Turbine Emergency Trip Test.Commitments Made by Licensee Are Listed in Corrective Actions Section of LER1999-10-12012 October 1999 Forwards LER 99-008-00 Re Turbine Trip That Occurred While Performing Main Turbine Emergency Trip Test.Commitments Made by Licensee Are Listed in Corrective Actions Section of LER NOC-AE-000625, Requests Partial Relief from ASME Section XI Visual Exam Requirements of IWA-5242(a).Relief Request Is Based on Provisions of Draft ASME Section XI Code Case N-616,which Is Expected to Be Published in Near Future1999-10-0707 October 1999 Requests Partial Relief from ASME Section XI Visual Exam Requirements of IWA-5242(a).Relief Request Is Based on Provisions of Draft ASME Section XI Code Case N-616,which Is Expected to Be Published in Near Future NOC-AE-000610, Requests Relief from ASME Section XI Code Nondestructive Exam Requirements of IWA-5250(a)(2) for Second Inservice Insp Interval,Per Provisions of 10CFR50.55a(3)(i)1999-10-0707 October 1999 Requests Relief from ASME Section XI Code Nondestructive Exam Requirements of IWA-5250(a)(2) for Second Inservice Insp Interval,Per Provisions of 10CFR50.55a(3)(i) NOC-AE-000653, Requests Relief from ASME Section XI Code Requirements of Table IWE-2500-1 for VT-3 Visual Exam of Seals & Gaskets on Airlocks,Hatches & Other Devices Required to Assure Containment leak-tight Integrity,Per 10CFR50.55a(a)(3)(i)1999-10-0707 October 1999 Requests Relief from ASME Section XI Code Requirements of Table IWE-2500-1 for VT-3 Visual Exam of Seals & Gaskets on Airlocks,Hatches & Other Devices Required to Assure Containment leak-tight Integrity,Per 10CFR50.55a(a)(3)(i) 05000499/LER-1999-006, Forwards LER 99-006-00,re Entry Into TS 3.0.3.Licensee Commitments Listed in Corrective Actions Section of Attachment1999-09-30030 September 1999 Forwards LER 99-006-00,re Entry Into TS 3.0.3.Licensee Commitments Listed in Corrective Actions Section of Attachment NOC-AE-000664, Forwards Rev 1 to STP Electric Generating Station Unit 1 Cycle 9 COLR & Rev 1 to STP Electric Generating Station Unit 2 Cycle 7 Colr1999-09-30030 September 1999 Forwards Rev 1 to STP Electric Generating Station Unit 1 Cycle 9 COLR & Rev 1 to STP Electric Generating Station Unit 2 Cycle 7 Colr NOC-AE-000646, Informs NRC That STP Nuclear Operating Co Is Y2K Ready IAW Nei/Nusmg 97-07 Guidelines & Also Provides Response to NRC Ltr1999-09-28028 September 1999 Informs NRC That STP Nuclear Operating Co Is Y2K Ready IAW Nei/Nusmg 97-07 Guidelines & Also Provides Response to NRC Ltr NOC-AE-000633, Forwards Rev 3 to SG-99-04-005, STP 1RE08 Outage Condition Monitoring Rept & Final Operational Assessment. Rept Satisfies Reporting Requirements of NEI 97-06,dtd Dec 19971999-09-21021 September 1999 Forwards Rev 3 to SG-99-04-005, STP 1RE08 Outage Condition Monitoring Rept & Final Operational Assessment. Rept Satisfies Reporting Requirements of NEI 97-06,dtd Dec 1997 NOC-AE-000634, Forwards Addl Info Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Povs. MOV design-basis Review Checklist,Encl1999-09-21021 September 1999 Forwards Addl Info Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Povs. MOV design-basis Review Checklist,Encl NOC-AE-000649, Forwards Current Annual Financial Data for STP Electric Generating Station Per 10CFR50.71(b),acting on Behalf of Central Power & Light Co,City of Austin,Tx,City Public Svc Board of San Antonio & Hl&P1999-09-21021 September 1999 Forwards Current Annual Financial Data for STP Electric Generating Station Per 10CFR50.71(b),acting on Behalf of Central Power & Light Co,City of Austin,Tx,City Public Svc Board of San Antonio & Hl&P 05000499/LER-1999-005, Forwards LER 99-005-00,re Esfa Following Loss of Power to Standby Transformer 2 Due to Electrical Fault.Licensee Commitments Are Listed in Corrective Actions Section of LER1999-09-20020 September 1999 Forwards LER 99-005-00,re Esfa Following Loss of Power to Standby Transformer 2 Due to Electrical Fault.Licensee Commitments Are Listed in Corrective Actions Section of LER 05000498/LER-1999-007, Forwards LER 99-007-00 Re Train 'B' CR Makeup & Cleanup Filtration Sys Being Inoperable for Greater than Aot.Util Intends to Append Addl Info Section of LER with Brief Description of Test Results,Rather than Submit Separate LER1999-09-13013 September 1999 Forwards LER 99-007-00 Re Train 'B' CR Makeup & Cleanup Filtration Sys Being Inoperable for Greater than Aot.Util Intends to Append Addl Info Section of LER with Brief Description of Test Results,Rather than Submit Separate LER NOC-AE-000638, Forwards License Renewal Applications & Certifications of Medical Exam for Seven Listed Licensed Operators at Stp,Per 10CFR55.57.Encl Withheld,Per 10CFR2.790(a)(6)1999-09-0909 September 1999 Forwards License Renewal Applications & Certifications of Medical Exam for Seven Listed Licensed Operators at Stp,Per 10CFR55.57.Encl Withheld,Per 10CFR2.790(a)(6) NOC-AE-000562, Requests Relief from Contruction Code non-destructive Exam Requirements for Repair/Replacement Activities During Second Inservice Insp Interval of Units 1 & 2,IAW Provisions of 10CFR50.55a(a)(3)(i)1999-08-31031 August 1999 Requests Relief from Contruction Code non-destructive Exam Requirements for Repair/Replacement Activities During Second Inservice Insp Interval of Units 1 & 2,IAW Provisions of 10CFR50.55a(a)(3)(i) NOC-AE-000617, Forwards semi-annual Fitness for Duty Program Performance Rept for 990101-990630,IAW 10CFR26.71(d)1999-08-26026 August 1999 Forwards semi-annual Fitness for Duty Program Performance Rept for 990101-990630,IAW 10CFR26.71(d) NOC-AE-000585, Provides Notification That South Texas Project Has Completed Integrity Evaluation of Units 1 & 2 Reactor Coolant Pump Casings Required by Paragraph (D) of Code Case N-4811999-08-25025 August 1999 Provides Notification That South Texas Project Has Completed Integrity Evaluation of Units 1 & 2 Reactor Coolant Pump Casings Required by Paragraph (D) of Code Case N-481 NOC-AE-000603, Informs of Addition of Restriction to SRO License 42658, for KM Espinoza,Effective 990721,per 10CFR50.74.Encl Info Withheld,Per 10CFR2.790(a)(6)1999-07-29029 July 1999 Informs of Addition of Restriction to SRO License 42658, for KM Espinoza,Effective 990721,per 10CFR50.74.Encl Info Withheld,Per 10CFR2.790(a)(6) NOC-AE-000599, Forwards STP Unit 1,Cycle 9 Startup Testing Summary Rept. No New Licensing Commitments Contained in Ltr1999-07-28028 July 1999 Forwards STP Unit 1,Cycle 9 Startup Testing Summary Rept. No New Licensing Commitments Contained in Ltr NOC-AE-000470, Forwards Amend 12 to STP Fire Hazards Analysis Rept. Summary of Changes Made Under Provision of 10CFR50.59 Also Encl1999-07-28028 July 1999 Forwards Amend 12 to STP Fire Hazards Analysis Rept. Summary of Changes Made Under Provision of 10CFR50.59 Also Encl 05000498/LER-1999-006, Forwards LER 99-006-00 Re Automatic Reactor Trip Due to over-temp delta-temp Actuation.Licensee Commitments Are Listed in Corrective Actions Section of LER1999-07-26026 July 1999 Forwards LER 99-006-00 Re Automatic Reactor Trip Due to over-temp delta-temp Actuation.Licensee Commitments Are Listed in Corrective Actions Section of LER NOC-AE-000589, Forwards Rev to 1RE08 ISI Summary Repts for Repairs & Replacements & for Sys Pressure Tests,Corecting Date of End of Insp Interval Provided in Item 9 of from NIS-1 from 09/24/99 to 09/24/20001999-07-26026 July 1999 Forwards Rev to 1RE08 ISI Summary Repts for Repairs & Replacements & for Sys Pressure Tests,Corecting Date of End of Insp Interval Provided in Item 9 of from NIS-1 from 09/24/99 to 09/24/2000 NOC-AE-000582, Forwards 1RE08 ISI Summary Rept for Welds & Component Supports of STP Electric Generating Station,Unit 1. Summary Rept Satisfies Reporting Requirements of IWA-6000 of Section XI for Welds & Component Supports1999-07-26026 July 1999 Forwards 1RE08 ISI Summary Rept for Welds & Component Supports of STP Electric Generating Station,Unit 1. Summary Rept Satisfies Reporting Requirements of IWA-6000 of Section XI for Welds & Component Supports NOC-AE-000597, Forwards voltage-based Criteria 90-day Rept for SG Tube Exam Performed Under NRC GL 95-05 During Refueling Outage 1RE08. Rept Contains Info Required by Section 6.b of Attachment 2 to GL 95-051999-07-23023 July 1999 Forwards voltage-based Criteria 90-day Rept for SG Tube Exam Performed Under NRC GL 95-05 During Refueling Outage 1RE08. Rept Contains Info Required by Section 6.b of Attachment 2 to GL 95-05 NOC-AE-000598, Forwards Four Copies of 1RE08 Refueling Outage ISI Summary Rept for Steam Generator Tubing1999-07-23023 July 1999 Forwards Four Copies of 1RE08 Refueling Outage ISI Summary Rept for Steam Generator Tubing NOC-AE-00586, Forwards Results of Control Rod Testing,In Response to NRC Bulletin 96-01, Control Rod Insertion Problems, Dtd 960308.Core Map Provided to Assist in Understanding Test Data1999-07-21021 July 1999 Forwards Results of Control Rod Testing,In Response to NRC Bulletin 96-01, Control Rod Insertion Problems, Dtd 960308.Core Map Provided to Assist in Understanding Test Data NOC-AE-000595, Forwards Chapters 1.0 & 16.0 to Operations QA Plan for South Texas Project.Rev Is Strictly Administrative & All Content Was Previously Submitted to NRC on 990503 & 9906151999-07-21021 July 1999 Forwards Chapters 1.0 & 16.0 to Operations QA Plan for South Texas Project.Rev Is Strictly Administrative & All Content Was Previously Submitted to NRC on 990503 & 990615 NOC-AE-000518, Requests Exemption from Various Special Treatment Requirements of 10CFR50,as Described in Encls to Ltr.Stp Believes That Pilot Application Will Assist NRC in Development & Implementation of risk-informed 10CFR501999-07-13013 July 1999 Requests Exemption from Various Special Treatment Requirements of 10CFR50,as Described in Encls to Ltr.Stp Believes That Pilot Application Will Assist NRC in Development & Implementation of risk-informed 10CFR50 NOC-AE-000536, Submits Request for Exemption from Requirements of 10CFR50.34(b)(11),10CFR50,App A,Gdc 2 & 10CFR100,App a, Section VI(a)(3) Re Maint of Seismic Instrumentation.Revised Page to Procedure OERP01-ZV-IN01 Included1999-07-13013 July 1999 Submits Request for Exemption from Requirements of 10CFR50.34(b)(11),10CFR50,App A,Gdc 2 & 10CFR100,App a, Section VI(a)(3) Re Maint of Seismic Instrumentation.Revised Page to Procedure OERP01-ZV-IN01 Included NOC-AE-000580, Forwards Response to NRC 990415 RAI Re Implementation of Commitments Related to GL 89-10, Safety-Related MOV Testing & Surveillance & GL 96-05, Periodic Verification of Design Basis Capability of Safety-Related Movs1999-07-13013 July 1999 Forwards Response to NRC 990415 RAI Re Implementation of Commitments Related to GL 89-10, Safety-Related MOV Testing & Surveillance & GL 96-05, Periodic Verification of Design Basis Capability of Safety-Related Movs NOC-AE-000574, Forwards ISI Summary Repts for Repairs & Replacements & for Sys Pressure Tests Performed Between 971004 & Completion of Eighth RO on 9904281999-07-0606 July 1999 Forwards ISI Summary Repts for Repairs & Replacements & for Sys Pressure Tests Performed Between 971004 & Completion of Eighth RO on 990428 NOC-AE-000557, Requests Relief from ASME Section XI Code Nondestructive Exam Requirements of App III,III-3410 for Second ISI Interval.Proposed Alternatives for Ultrasonic Exam of Piping Sys Welds,Attached1999-07-0606 July 1999 Requests Relief from ASME Section XI Code Nondestructive Exam Requirements of App III,III-3410 for Second ISI Interval.Proposed Alternatives for Ultrasonic Exam of Piping Sys Welds,Attached NOC-AE-000498, Requests Relief from ASME Section XI Code Nondestructive Exam Requirements Applicable to SG Main Steam Nozzle inside- Radius Sections.Attachment Includes Discussion of Basis & Justification for Request & Implementation Schedule1999-07-0606 July 1999 Requests Relief from ASME Section XI Code Nondestructive Exam Requirements Applicable to SG Main Steam Nozzle inside- Radius Sections.Attachment Includes Discussion of Basis & Justification for Request & Implementation Schedule NOC-AE-000573, Requests Relief from Requirements of ASME Section XI Code Case N-498,exempting Isolated Class 1 Reactor Vessel Head Vent Atmospheric Vent Piping & Valve from Being Tested at Full RCS Pressure1999-07-0606 July 1999 Requests Relief from Requirements of ASME Section XI Code Case N-498,exempting Isolated Class 1 Reactor Vessel Head Vent Atmospheric Vent Piping & Valve from Being Tested at Full RCS Pressure NOC-AE-000541, Submits Response to GL 98-01,Suppl 1, Y2K Readiness of Computer Systems at Npps. Readiness Disclosure for STP, Encl1999-06-29029 June 1999 Submits Response to GL 98-01,Suppl 1, Y2K Readiness of Computer Systems at Npps. Readiness Disclosure for STP, Encl NOC-AE-000571, Forwards Final Operating Exam Matls for STP Exam Scheduled for 990705.Revised Operating Exam Outline & post-validation Change Summary Has Been Included.Without Encls1999-06-24024 June 1999 Forwards Final Operating Exam Matls for STP Exam Scheduled for 990705.Revised Operating Exam Outline & post-validation Change Summary Has Been Included.Without Encls NOC-AE-000512, Responds to NRC 981201 Telcon Re Jco 93-0004,per Revised MSLB Analysis1999-06-23023 June 1999 Responds to NRC 981201 Telcon Re Jco 93-0004,per Revised MSLB Analysis NOC-AE-000560, Forwards LER 99-S02-00,re Failure to Maintain Positive Control of Vital Area Security Key.Licensee Commitments Are Found in Corrective Action Section of LER1999-06-23023 June 1999 Forwards LER 99-S02-00,re Failure to Maintain Positive Control of Vital Area Security Key.Licensee Commitments Are Found in Corrective Action Section of LER 05000498/LER-1999-005, Forwards LER 99-005-00,re Failure to Meet Requirements of TS Surveillance 3.7.1.2 Action B for Auxiliary FW Sys.Only Commitments Contained in Ltr Are Located in Corrective Action Section of LER1999-06-17017 June 1999 Forwards LER 99-005-00,re Failure to Meet Requirements of TS Surveillance 3.7.1.2 Action B for Auxiliary FW Sys.Only Commitments Contained in Ltr Are Located in Corrective Action Section of LER NOC-AE-000565, Forwards Amended Pages for Insertion Into South Texas Project Nuclear Operating Co Previously Submitted Response to NRC Rai.New Pages Include Expanded Answer to Question 4.b1999-06-16016 June 1999 Forwards Amended Pages for Insertion Into South Texas Project Nuclear Operating Co Previously Submitted Response to NRC Rai.New Pages Include Expanded Answer to Question 4.b NOC-AE-000548, Forwards Response to RAI Re Proposed Amends on Replacement SG Water Level Trip Setpoint Differences for Stp,Units 1 & 2.Nothing Contained in Response Should Be Considered Commitment Unless So Specified in Separate Correspondence1999-06-16016 June 1999 Forwards Response to RAI Re Proposed Amends on Replacement SG Water Level Trip Setpoint Differences for Stp,Units 1 & 2.Nothing Contained in Response Should Be Considered Commitment Unless So Specified in Separate Correspondence NOC-AE-000561, Forwards Change QA-042 to Operations QAP, Rev 13, Reflecting Current Organizational Alignment for STP & Culminating Organizational Realigment That Has Been Taking Place During Past Several Months1999-06-15015 June 1999 Forwards Change QA-042 to Operations QAP, Rev 13, Reflecting Current Organizational Alignment for STP & Culminating Organizational Realigment That Has Been Taking Place During Past Several Months NOC-AE-0559, Forwards STP Commitment Change Summary Rept for Period 981209-990610.Rept Lists Each Commitment for Which Change Was Made During Reporting Period & Provides Basis for Each Change1999-06-15015 June 1999 Forwards STP Commitment Change Summary Rept for Period 981209-990610.Rept Lists Each Commitment for Which Change Was Made During Reporting Period & Provides Basis for Each Change NOC-AE-000499, Forwards Relief Request RR-ENG-2-3,proposing to Perform Alternative Ultrasonic Examination from Outside Surface of Skirt Attachment Weld as Described in Encl,In Lieu of Surface Examination from Inside Pressurizer Skirt1999-06-0909 June 1999 Forwards Relief Request RR-ENG-2-3,proposing to Perform Alternative Ultrasonic Examination from Outside Surface of Skirt Attachment Weld as Described in Encl,In Lieu of Surface Examination from Inside Pressurizer Skirt NOC-AE-000502, Forwards Relief Request RR-ENG-2-6,proposing That Boroscopic VT-1 Visual Examination Be Allowed as Alternative to Section XI Surface Examination of Pump Casing Welds,Or Portions of Welds within Pits1999-06-0909 June 1999 Forwards Relief Request RR-ENG-2-6,proposing That Boroscopic VT-1 Visual Examination Be Allowed as Alternative to Section XI Surface Examination of Pump Casing Welds,Or Portions of Welds within Pits NOC-AE-000500, Forwards Relief Request RR-ENG-2-4,proposing to Perform Alternative Ultrasonic Examination from Outside & End Surfaces of Reactor Vessel Closure Head Nuts,As Described in Encl in Lieu of Surface Examination of Threaded Region1999-06-0909 June 1999 Forwards Relief Request RR-ENG-2-4,proposing to Perform Alternative Ultrasonic Examination from Outside & End Surfaces of Reactor Vessel Closure Head Nuts,As Described in Encl in Lieu of Surface Examination of Threaded Region NOC-AE-000545, Forwards Response to NRC 990416 RAI Re Util Proposed Amend on Operator Action for Small Break Loca, .Draft EOP Re Small Break Loca,Encl to Aid Discussion of Proposed Amend1999-05-31031 May 1999 Forwards Response to NRC 990416 RAI Re Util Proposed Amend on Operator Action for Small Break Loca, .Draft EOP Re Small Break Loca,Encl to Aid Discussion of Proposed Amend 1999-09-09
[Table view] Category:LEGAL/LAW FIRM TO NRC
MONTHYEARML20055H8731990-05-25025 May 1990 FOIA Request for Records Re Minor Leak of Radioactive Steam from Containment Bldg ML20005G1381989-12-27027 December 1989 J Corder Subpoena.* Requests Opportunity to Reply to NRC Brief Prior to Consideration by Commission,Per Author 891211 Motion to Modify & for Protective Order ML20005G1411989-12-11011 December 1989 in Matter of Subpoena of J Corder.* Forwards Motion to Modify Subpoena & for Protective Order for J Corder ML20246A7461989-06-20020 June 1989 FOIA Request for Records Re Jaecon Corp Seismic Lines 2M & 4M & Interpretation of Lines ML20196A4761988-06-21021 June 1988 Requests That City of Austin,Tx Be Added to Document Control List in Order to Receive Documents Re Amend 10 to Application for CPs & OLs Matter ML20195D8121987-10-0505 October 1987 FOIA Request for Entire NRC File Re E Stites Charge of Discriminatory Employment Practices Filed Against Houston Lighting & Power Co & Documents Prepared for Use at 861103 Meeting Between NRC & Util ML20235C8421987-06-11011 June 1987 Urges Commission Denial of Gap 870529 Motion to Quash Subpoena Issued by EDO for Appearance of B Garde to Present Info Re Plant Safety Allegations & Denial of 10CFR2.206 Petition.Util to B Garde Encl ML20235Z0901987-05-22022 May 1987 Submits Signed Agreement in Order to Memorialize Further Understanding Reached During Telcon.Billie Will Not Answer Any Questions Pursuant to Subpoena,Except Under Court Order. Related Info Encl ML20207E5111986-07-14014 July 1986 Forwards Applicant Responses to ASLB 860623 Questions Re Design of Nonconforming Structures to Withstand Hurricanes & Tornadoes.Certificate of Svc Encl ML20198E2881986-05-19019 May 1986 Advises That Changes,Listed in Jg Dewease 860218 Affidavit, Necessary to Update FSAR Description of Organization, Identified & Incorporated Into FSAR by Amend 53 Filed on 860409.W/Certificate of Svc.Related Correspondence ML20210L3211986-04-25025 April 1986 Responds to 860321 Request for Comments on Newspaper Article Addressing Adequacy of Certain Portions of Plant HVAC Sys to Withstand Tornado Missiles.Certificate of Svc Encl.Related Correspondence ML20154M8861986-03-10010 March 1986 Informs That Cg Robertson Resigned from Houston Lighting & Power on 860310 & Is Now Director of Nuclear Svcs at TVA Per Robertson 860221 Affidavit.W/Certificate of Svc.Related Correspondence ML20153E8591986-02-21021 February 1986 Forwards Affidavit of Cg Robertson Re Lack of Util Licensing Engineer Presence at Briefing Given by Quadrex to Brown & Root Prior to Finalization & Submission of Quadrex Rept,Per ASLB Request ML20151T5501986-02-0303 February 1986 Informs of 860203 Filing of Util Response to Motion to Reopen Phase II Record:Iv;For Discovery & to Suspend Further Activity in Phase Iii. Supporting Documentation Re Exchange of Correspondence Encl.W/Certificate of Svc ML20138R5701985-12-27027 December 1985 Notifies That Agreement Settling Litigation Between Util & Brown & Root,Inc/Halliburton Formally Executed & Final Judgement Signed on 851220,terminating Litigation. Certificate of Svc Encl.Related Correspondence ML20138P4911985-12-20020 December 1985 Forwards cross-reference Table for Parties Phase II Proposed Findings,Including Proposed Findings for Reopened Proceeding,Per Author .Corrected Apps a & B to Applicant Proposed Findings Also Encl.W/Certificate of Svc ML20138P5891985-12-20020 December 1985 Forwards City of Austin 851206 Amended Petition in Lawsuit Against Applicant Seeking Reformation of South Texas Project Participation Agreement ML20138M5781985-12-17017 December 1985 Forwards L Stanley Affidavit Re 810102 Telcon W/Jr Sumpter Concerning Util Desire to Review Brown & Root Engineering, Including Scope of Proposed Review & Schedule ML20137L6171985-11-29029 November 1985 Forwards Excerpts from DG Barker Nov 1980 Notes,L Stanley 810102 Telcon Notes & Exhibit 5 Ref on Page 2,091 of Thrash Notes from 810220 Mgt Committee Meeting.W/O Encls.W/ Certificate of Svc.Related Correspondence ML20137H9461985-11-27027 November 1985 Forwards Reply to Proposed Findings of Fact & Conclusions of Law Submitted by Other parties-Phase Ii.Table of cross-ref Between Applicant Proposed Findings & Those Submitted by Other Parties Forthcoming ML20137D3931985-11-26026 November 1985 Provides Change of Address for La Sinkin,Effective 851110 ML20138S0191985-11-14014 November 1985 Forwards 851113 Press Release Stating That Unit 1 Presently 2 Months Behind Schedule.Development Should Not Affect Undertaking & Completion of Phase III of OL Hearings.W/ Certificate of Svc.Related Correspondence ML20209H2871985-11-0707 November 1985 Forwards Proposed Findings of Fact & Conclusions of Law in Form of Partial Initial Decision ML20138N2321985-10-31031 October 1985 Forwards Applicant Response Opposing Citizens Concerned About Nuclear Power (Ccanp) 851016 Motion to Reopen Phase II Record:Ii.Pleading Addressing Both Motion III & Ccanp Withdrawal Will Be Filed Upon Receipt of Withdrawal ML20133K3511985-10-17017 October 1985 Advises of Error in Applicant 851014 Motion to Establish Schedule for Phase III Indicating That NRC Would Not Be Filing Response.Nrc Will Submit Response.Related Correspondence ML20133J7281985-10-17017 October 1985 Forwards Citizens Concerned About Nuclear Power Exhibit 148 for Inclusion in Facility Docket,Per ASLB 851016 Order ML20133F7201985-10-0808 October 1985 Informs of No Intentions to Suppl Records for Phase II Hearings Re Util 850730 Supplemental Response to NRC Notice of Violation Concerning Issue B/D-1,adequacy of Ebasco Backfill Activities.Certificate of Svc Encl ML20205G8321985-10-0808 October 1985 Apologizes for Glibness in Transmittal Ltr Accompanying Citizens Concerned About Nuclear Power Proposed Findings of Fact & Conclusions of Law.Certificate of Svc Encl ML20135A0191985-09-0606 September 1985 Forwards Affidavit of C Thrash Re Questions Agreed Upon in 850820 Telcon Concerning Process for Preparing Minutes of Mgt Committee 850427,0626,0723 & 24 Meetings ML20133L0541985-08-0606 August 1985 Forwards INPO Const Project Evaluation Rept.Suggested Areas of Improvement Addressed.Addl Measures to Meet INPO Objectives Will Be Addressed by 860131.One Deficiency Identified.W/Certificate of Svc.Related Correspondence ML20128H1071985-07-0202 July 1985 Forwards Memorandum Re Permissibility of & Need for Calling Certain Attys as Witnesses & Documents,Including Drafts, Generated Between 810401 & 0924 Re Decision to Seek Replacement of B&R,Per ASLB 850618 Memorandum & Order ML20127L5771985-06-26026 June 1985 Forwards Testimony of Individuals to Be Presented on Behalf of Applicants in Phase II of Proceeding Scheduled to Begin on 850711.List of Exhibits Intended to Be Offered Into Evidence Encl.Related Correspondence ML20127L4971985-06-25025 June 1985 Forwards Addl Listed Documents Appearing within Scope of ASLB Request in 850226 Memorandum & Order for Preparation of Testimony Being Filed in Proceeding.Certificate of Svc Encl. Related Correspondence ML20126C4261985-06-12012 June 1985 Informs That L Stanley Will Present Testimony in Phase II Hearings Re Design Review of Brown & Root Engineering Work for Plant.Certificate of Svc Encl.Related Correspondence ML20126J9231985-06-0707 June 1985 Forwards Applicant Identification of Witnesses for Phase II of Proceeding,Per 850517 Sixth Prehearing Conference Order. Related Correspondence ML20128N9201985-05-30030 May 1985 Forwards Util 850530 Press Release Announcing Agreement Reached on Lawsuit Settlement Against Halliburton Co & Subsidiary,Brown & Root,Inc Re Engineering & Const of Facility.Certificate of Svc Encl.Related Correspondence ML20117G0801985-05-0808 May 1985 Forwards Proposed Corrections to Transcript of 850430 & 0501 Prehearing Conferences,Correcting Erroneous Citations. Certificate of Svc Encl ML20116P1311985-05-0303 May 1985 Forwards Previously Withheld Documents Per ASLB 850226 Memorandum & Order Releasing Documents Listed in Attachment B to .Certificate of Svc Encl.Related Correspondence ML20116G4311985-04-26026 April 1985 Forwards Two Addl Documents,Including Typed & Handwritten Versions of Excerpts from Cg Thrash 810721 Notes Re Util Mgt Meeting,Per ASLB 850226 Memorandum & Order.Certificate of Svc Encl.Related Correspondence ML20116G4471985-04-26026 April 1985 Forwards Reply to Citizens Concerned About Nuclear Power Response to ASLB 850226 Memorandum & Order Re Quadrex Rept & Suggested Spec of Quadrex Findings to Be Litigated & Suggested Spec of Issue Re Soils ML20116D8131985-04-25025 April 1985 Forwards Util Response to Citizens Concerned About Nuclear Power 850417 Motion to Reopen Phase I Record in Two Pleadings,In Response to ASLB 850418 Order.First Pleading Responds to Motion & First Two Questions of Order ML20205A9531985-04-22022 April 1985 Advises That ASLB Will Receive Jh Goldberg Re Specs of Brown & Root & Plaintiff Claims & Issues Based on Refs to Design & Const.Certificate of Svc Encl.Related Correspondence ML20116B3161985-04-19019 April 1985 Forwards Documents Generated Between 810301 & 0928 Re Reportability to NRC of Quadrex Rept & Info in Rept Reflecting QA Violations,Per ASLB 850226 Memorandum & Order. Certificate of Svc Encl.Related Correspondence ML20112A5901985-03-14014 March 1985 Advises That No Further Applicant Response Will Be Filed to 841221 Staff Affidavit Re Const Qa/Qc Under New Contractors at Facility.Certificate of Svc Encl.Related Correspondence ML20111C6541985-03-13013 March 1985 Forwards Corrected Page 9 to Applicant 850312 Motion for Summary Disposition on Citizens Concerned About Nuclear Power Contention 4 Re Wind Speed ML20112B0161985-03-12012 March 1985 Forwards Applicant Motion for Summary Disposition on Citizens Concerned About Nuclear Power Contention 4. Adoption of Listed Schedule for Response Requested ML20099F5371985-03-0808 March 1985 Responds to Ah Gutterman 850225 Request to Aslab to Reconsider Granting Time Extension for Intervenor to File Motion for Reconsideration of Decision ALAB-799.Request Should Be Denied.Certificate of Svc Encl ML20107G7001985-02-25025 February 1985 Forwards Joint Affidavit of MR Wisenburg & Je Geiger Supplementing Info Contained in 841221 Rept on Const Qa/Qc Under New Contractors,Per 840314 Partial Initial Decision & 841116 Fifth Prehearing Conference Order ML20107K4851985-02-25025 February 1985 Requests Reconsideration & Denial of Citizens Concerned About Nuclear Power Request for 10-day Extension for Filing Petition for Reconsideration of ALAB-799.Certificate of Svc Encl.Related Correspondence ML20101E7701984-12-21021 December 1984 Requests Approval of Encl Proposed Corrections to 841213 Transcript.Certificate of Svc Encl 1990-05-25
[Table view] |
Text
_ - _
G 55(ob
( .n .. .
NEWMAN & HOLTZINGER, P.C.
ISIS L STREET. N.W.-
JACM R. NEWMAN - WASHINGTON, D.C. 2OO36 JOHN L HOLTZINGER.JR. - 000 METED wituAM COUGLASL. L eA.ER.JR.
ERE$rORO HAROLD F. REIS . (!SN3C . SARSARA A. DUNCOMSC 2O2 955-66OO ' JANET L B. ECKER
[- . MAufhCE AMELRAD J. A, BOUMNIGHT JR. MERLE W. FALLON
- " "**" December 20, *[:ETUTAY 0
EC C L.
.G.AT,,L m .S EO.AR-EA 1985 85 DEC 23 P2:30 =a'a~ a ***
OAVID G. POWELL sfLL L GRANT AUSON LEMASTER DOUGLAS G. GREEN HOLLY N. UNDEMAN MAROL LYN NEwMAN MEVIN J. UPSON
' JOMM T. STOUGM.JR. ~
A p^ , ,
.. JAMES S. VASaLE
' MtCMACL A, BAUSER .
h((f({ }{ Un "dp'b'b'"OY}U'.
gg' { JtbU ?- -
OAVID 5. RASKIN JANE 3. RYAN ALVIN H. GUTTERMAN hb$flCH OONALD J. SILVERMAN
. MEV,N P. GALLEN JACOLYN A. SIMMONS JOSEPH L STUSSS
, i THOMAS A. SCMMUTZ MICHAEL F. HEALY -
ROBERT LOWENSTEIN .
SCOTT A. M N h0RMAN A. FLANINGAM OF COUNSEL
- Charles Bechhoefer, Esq.
' Chairman, Administrative Judge 1 Atomic Safety and-Licensing Board U.S.' Nuclear Regulatory Commission
~ Washington,JD.C. 20555 Dr. James.C. Lamb, III Administrative Judge J313 Woodhaven Road Chapel Hill,;NC 27514 Frederick J. Shon
. Administrative Judge Atomic' Safety ~and Licensing Board U.S.. Nuclear Regulatory Commission Washington,~D.C. ~20555 Re: Houston Lighting & Power Co., et al.
South Texas Project, Units 1 & 2 Docket Nos. 50-498 OL, 50-499 OL
Dear Members of the Board:
-As promised-in my letter dated November 27, 1985, enclosed is a table which cross-references the Phase II proposc d findings of the parties, including the proposed findings for the reopened proceeding which were submitted on December 13.
Applicants have attempted te accurately reflect the substan-tive areas covered by the parties' findings, although we found a,- that the selection and description of the subjects required some' subjective judgment. Since there is some overlap among the subjects, specific portions of the proposed findings may
be cited'under more than one subject.
8512260136 851220 hDR ADOCK 05000498PDR <
-b.SoJ
L Nawnx Ci H:LTz x2:2, P. C.
Charles Bechhoeffer, Esq.
'Dr. James C. Lamb, III
-Frederick J. Shon December 20, 1985 Page Two
-Also enclosed are amended-and corrected Appendices A
= and B to Applicants' Phase II proposed findings. Appendix A,~as amended, identifies the witnesses who testified on December 5.and 6-as well-as those who testified during July and August.
Appendix-B lists,.the exhibits, including those from December
.5 and 6, from Phase II. Several. corrections have been made to-Appendix B to correct typographical errors and the identifica-
. tion of evidentiary status (i.e., not offered, rejected, etc.).
Respectfully Submitted, Au HK Alvin H. Guttu man Attorney for Applicants cc: ' Service List' 5
=
J 4
/
f i
e e
1
-- .m.....,. ---...,-,-n, -, _ . - , _ . v----- --r~, . - . - - , - - , -
FT s :.
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC: SAFETY AND LICENSING BOARD
-In the: Matter of )'
)
' HOUSTON LIGHTING & POWER ) Docket Nos. 50-498 OL COMPANY, _ET _AL. ) 50-499 OL (South Texas Project, Units 1 )
and 2) )
CERTIFICATE OF SERVICE I hereby certify that a copy of the letter from Alvin H.
Gutterman:to the Board dated December 20, 1985, with attachments, has been served on the following individuals and entities by deposit.in the United States mail, first class, postage prepaid, on this 19th day of April, 1985.
~
-Charles Bechhoefer, Esq. Brian Berwick, Esq.
Chairman, Administrative Judge Assistant Attorney General Atomic Safety and Licensing for the State of Texas Board Environmental Protection U. S. Nuclear Regulatory Commission Division Washington,. D.C. 20555 P. O. Box 12548, Capitol Station Austin, TX 78711 Dr; James C. Lamb, III Administrative Judge Kim Eastman, Co-coordinator 313 Woodhaven Road Barbara A. Miller Chapel. Hill, NC 27514 Pat Coy Citizens Concerned About Frederick J. Shon Nuclear Power Administrative Judge 5106 Casa Oro Atomic Safety and Licensing Board San Antonio, TX 78233 U.S. Nuclear Regulatory Commission Washington, .D.C. 20555 Lanny Alan Sinkin Christic Institute Mrn. Peggy.Buchorn 1324 N. Capitol Street Executive Director Washington, D.C. 20002 Citizens for~ Equitable Utilities, Inc. Ray Goldstein, Esq.
Route'1, Box 1684 Gray, Allison & Becker Brazoria, TX 77422 100 Vaughn Building 807 Brazos Austin, Texas 78701-2553
P
,; : x
~
9
-..s
. .Oreste Russ:Pirfo,'Esq.
-Robert:G.-Perlis, Esq.
Office ~of.the Executive Legal.
Director ,
U.S.1 Nuclear. Regulatory' Commission' LWashington, D.C.- 20555
'Ato'mic Safety and Licensing Board
'U.S. Nuclear Regulatory Commission JWashington, D.C.
20555
' Atomic Safety and' Licensing Appeal Board
- U.S. Nuclear Regulatory Commission
- Washington, D.C. 20555 Docketing and Service Section' -
Office of the Secretary U.S.= Nuclear. Regulatory Commission
~
Washington, D.C. 20555 f '
~
WW ~
4
c
..g
- q
[
Tablo'cf CrcC3 Rafcrancis ! BetweenlPhsin.II- ,,
Proposed Findings of-Fact-Submitted by the Parties- ! -
SUBJECT- CCANP FOF APPLICANTS' FOP-- / 'NRC' STAFF FOF A. PHASE II _
1, General Introduction and I.1-18. I.1-6, VI.-l-20, RI.1 I.A.1-25 _
Background
Sufficiency of Parties' ---
RI.2-3 ---
Proposed Findings Bases for Determinations
~
VI.18-19 ---
on CCANP Subpoena and Sequestration-Requests
- 2. Introduction to Quadrex I.1-2, III.1-13 II.1-2, VII.2-6 I.A.9-17,-I.B.1-5~
and Contention 9 Generally
- 3. Interpretation of'Section ,II.3-7 II.3-9,.RII.46-47 I.E.ll, 13, 15-16 50.55(e) Generally
- 4. Actions Relating to Quadrex II.8-15, III.14- II.10, 19, VII.1-18, I .1B .1, 6, 7-12, 32-Review Prior to May 6, 1981 24 58-59, VIII.70-77, I.E.14-15 RII.1-16 Goldberg contacts with II.8, III.15-16 II.19, VII.2, 14, I.B.1, 11, 32, D. Sells RII.15 1.E.14
- ALARA II.9, III.17 VIII.70-77, RII.6-7 ---
- / All references are to paragraph numbers.
- / Cross references to the Proposed Findings submitted by the parties on December 13, 1985 (reopened Phase II proceeding) begin with item 27.
- / Applicants' roposed Findings include Applicants' Reply Findings which are numbered beginning with "R".
.w - -
7 -~
,, :... g( '
F
~
g l.
~.
' : 21. -- .
ut 4 .
SUBJECT. CCANP-FOF ' APPLICANTS POP
- NRC STAFF-F0F .
~
< +
t March 18,;1981" Briefing. II .10--12, ' III .18 .VII.7, RII . 9--10 :.I;B.6 April?13, 1981; Briefing- II;13, III.19-20 LVII.9-12,lRII.ll-l'3 s - -I '. B . 7 --10
. April 27, 1981 Manage- - - -
-VII.15' ---
ment Committee-Meeting
~ Notes Information Available'as II.14, III.21-22 I I . 1 0 , V I I'.' 1 6 - 1 8 ,,
!I.B.12 c of April 30,'1981 ,RII.14 Mawh, 1981 Reportability II .'15, . III . 2 3-2 4 VII.8,,RII.8' ----
Review of ASME-Error Conclusions Regarding ---
RII.16- ~---
Events Prior to May 6, 1981 ,
- 5. Reportability Review Process :II.22-23', 59,. .II.ll-15, 18,l21,'VII.1, I.B.13-24, 31-During May 6-8, 1981 III.100-150,,155 19-38,-47-48, 58-59,:
RII.1-3, 17-37, RVI.1-2 B&R Involvement II.22-23,: III. II.ll, VII.23-24, I;B.13, 17 113A, 125, 130, RII.28 147-149
~
Review of the Most Serious II.22-23, III.- II.12-13,.VII.20,1 30-- I.B.14-15, 17 , .
Discipline Findings 106, 109, 119- -38, RII.31-32 24-121, 146 24 Hour Review Period II.22, III.105, RII.34 ---
108
- J
s:
- 3' -
SUBJECT _,
CCANP FOF APPLICANTS'FOF 'NRC~ STAFF FOF~
Relative Experience and III.127-129,.137- II.ll, 14','VII.25-29, I.B.-18-20 Knowledge of Review Team 140 RII.19-21,~27-
.and IRC Departure from:IRC Pro- II.22-23,LIII.134- :II.14,jVII.25-27, I.B.16-19 cedure 137, 141 RII.19, 27 Absence of QA Repre- LII.22, III.136,.145 'RII.19,.23L ---
sentative Involvement of HL&P II.22, III.124, RII.19, 22 ---
Engineering' Staff 135 Involvement of Loren II.22, III.122 RII.26 ---
Stanley Documentation of Non- III.135 VII.48, RII.19, 26 I.B.31 Reportable Items Alleged Undue Influence II.22, III.ll5-ll7, RIl.36 ---
by J. Goldberg 142-144 Absence of References to II.22, III.144 II.18, VII.47, RII.19, ---
Quadrex in Oral Report 24-25 to Region IV Conclusions Regarding ---
RII.37 ---
May 6-8, 1981 Report-ability Review Process i
60 Handling of Quadrex Report II.24, 60, III.91- 11.18-21, VII.1, 43, I.B.33-38, 41 After May 8, 1981 93, 95-97, 151-154 47, 49-51, 53-59, 178, 196 RII.1-3, 19, 37-45 '
~
Q. -
O
- h. 35 l
( _. ---
- . ; , ',;L. _._
- - . ;c , ,
e , ~.
4
., g ,.
( .
~ -
, ,. c -
. .m '
- ' # l '
,. , , . . < ,, , ik ,
- SUBJECT' CCANP FOF- LAPPLICANTS'-FOF- -
- N R C -: S T A F F F 0 F -- j
. . 1
. ,' . .. .1 ..
-May119811Goidberg:- Sells. :II.60,.III.91-92 . I I . 1 9 ,-- V I I . 4 9 - 5 1 , e R I I ..
?I.B.33 ~
Meeting: 140-41 , 1.
- II .18, -- VII . 4 7 ' ?-RII.39)
- Absence of. References to : I I . 2 4 ,.. I I I . 1 5 3 .- ,
.QuadrexLin Written.Sec - ^ '
.. tion 50.55(e) Reports~
and IRC Minutesi < -
.Robertson-Sumpter l Review' III.152.- 'VII.43, RII.37-- - - - -
of Quadrex Report Stop' Work . Order on ' Access III.154 RII.19' - ---
-Engineering -
Staff-Receipt of Quadrex III.93, 196 II.20, VII.55- I.B.36 Report During August, 1981 Investigation September, 1981 Discus-~ III.95-97 II.'20,'VII.56, IX.15 ~ I . B. 3 7-3 8, ' IF. 8-l'0 - .-
sions with and Briefing of Region IV Officials Alleged' Confidentiality III.178,.196 VII.53-55, 58,'RII. I.B.32-41 of Quadrex-Poport 42-45
- 7. Alleged Collusion of NRC III.91-99, 156 VII.57, RII.2,-38, 41, I.B.34, 39-40 Staff 70 'I.F.10:
Don Sells .. I I I . 9 1 - 9 2 ,'1 5 6 RII.2, 38,'41 I.B.34-John Collins III . 9 3--97 RII.2,138, 41,.70~ I.B.40, I.F.10
- 8. William Dircks' Congres- III.98-99 VIIl57, RII.70 I.B.39' sional' Testimony
7 _.
s -
, :.* y .
< '. 5 =- .
I s ,
SUBJECT CCANPI F0F- APPLICANTS':FOFS -
NRC' STAFF F0F:' '
- 9. . Reportability of$HVAC- 'II.16-17,1III.25-27,-
iII.15).VII.35,-'39,>46,' I.B.25
--:RII.75 31-32: ^
~
- 10. Reportability of Computer II.16-17',1..III.25- I I . 1 5 ,..V I I . 3 5 ,1 40, 4 6 ~, I.B.26: <c Codes - 26, ' 2 8, -f 31-3 2 .RII.75-n
.11'.Reportability
. of. Shielding .II.16-17,_III.25-26~ II.~15, VII.35, 41-J I.B.27' ~ R
.29-31 42,.RII.67, 75
- 12. Reportability of Generic II.18-19,-III.33-55 -II.16-17,-22-25', VII.- I.D.1-85; Findings 44,LVIII.1-6,-.78- , _
158,"166-177, RII.48-55, 76, 78 J-
- 13. Reportability of Disci- II.20, III.33-34,. II.16-17, 22-24, 26-27,. I.C.1-80 pline Findings 56-72 VII.44, VIII.1-77, 166-177, RII.46-47, H 56-67,.76-78
- 14. Reportability of Whole II.21, III.33-34,- .II.22-24, 2 8 , -. V I I . 4 4 , I.E.1-22 Report 90 VIII.1-6, 159-177, .
-RII.46-47, 68-76, 78
- 15. Other Reportability III.208-211 VIII.166-174, RII.76-78 I.B.28-30 Reviews
- 16. Corrective Actions Taken ---
VII.45 -- -
in Response to the Quadrex Findings ,
d
' ' ' ~ ~
~} ,
6 L '- *
.. . . . a
' SUBJECT CCANP FOF- APPLICANTSFOF ~ .NRC STAFF FOF' O
-17'.-Conclusions on Contention 9' II.2'5-56~ -I I'. 3 0 - 3 7 ,.' R V I . 1 - 3 I.B.41,'I.E.22' Relationship.of Section' ---
- II.32-35' --- -
_ 50.55(e) Issues to-HL&P's Character
- 18. Contention 10:- Informing- II.27-28,EIII.159 .III.1-9,,IX.1-16', RIII.. I . F .'l--12' the Board of-lthe Quadrex l-3, RVI.1-5 Report
- 19. Contention 10 - Informing II.29, III.160- III.1-2, 10-15, IX.17- I'G.1-9 the Board Regarding B&R 165,-182, 192, ' 3 4, RIII . 4-8, . RVI .1, :5.
Termination 206 .
Involvement of Counsel III.182,.192, 206 ~IX.32-33, RIII.7-8. I.G.9
- 20. Candor of Phase I II.30-40, III.166- III.1, 10-13, 16-20,,IX. ---
Testimony 173 17-34,.35-48,.RIV.1-7 Don Jordan II.33-35, 40, IX.36-38, 48, RIV.3-5 III.167-71 George Oprea II.38-39, III.173- IX.39-41, 48, RIV.7-
'Jerome Goldberg II.36-37, 39,.III. IX.42-44, 48, RIV.6 172 Richard Frazar ---
IX.45-48
- 21. HL&P's Phase II.41-42, III.20, -RI.1, 4, RII.8, 12, 13, I.B.7-10, 14, 16-18, II Testimony 110, 114, 174-207 15, 19,'21, 25, 27, 33, 32-41, I.G.9 35, 42-44, 72-73, RIII.
'7-8
'*'. m:
~
- a -
SUBJECT CCANP'FOF APPLICANTS' FOF NRC STAFF-FOF:
Don Jordan- . I I I . 1 7 7 , =.1 9 1 - 1 9 3 ~RIII.7 ---
Jerome Goldberg III.20,~110,c114, L R I . 1 , R I I . 1 2 ,-. 1 3 , . 1 5 ~, 19, I.B.7-10,.14,.16-18, 178-182, 194-206 25,127,~33, 35,_42-44,32-41i 'I .G. 9 72-73, RIII'.8'
- Account of April 13, III.20,'202' RII.12, 13 'I.B.7 1981 Briefing
- Level of IRC Activity III.204 RII.19 ---
in-Early 1981
- Alleged Confidentiality III.178, 196, RII.25, 42-44 I.'B.32-41 of Quadrex Report 203
- Details of Various III.110, 114, 197- RII.27, 35 I.B.14,:16-18 Meetings on May 7-8, 198, 200, 201 1981
- Awareness of Quadrex's III.194 RII.33 ---
Use of Generic Findings . .
- Purposes-of Quadrex III.179, 205 RI.1, RII.72 ---
Review
- Uniqueness of-Quadrex III.180, 195 RII.15 ---
Review
- Previously Identified III.181 RII.73 ---
Design Deficiencies
- Involvement of Counsel III.182, 206 RIII.8 I.G.9 in Selection of B&R Replacement James Sumpter III.183-190 RII.8, 21 ---
- 22. Conclusions on HL&P's II.43-69, II.84- RVI.1-5 I.B.41,-I.E.22, Character 87, III.157-158 I.F.12, I.G.8-9
- / For Applicants' and the NRC Staff's responses to CCANP F0F 1 III.205 (relationship of-Quadrex review to Phase I hearing preparation), see items 27-35, infra.
J
+. -wn
. ~. ,
--8'-
SUBJECT CCANP FOF APPLICANTS' FOF NRC STAFF FOF ' '
- 23. Competence ~of HL&P- 'II.70-82, 86, 88- II.38-39,'IV.1-18. .I.H.-J '1 195, III.212-218 'VIII.4, X.1-46,.
RII.17, 76,-RIII.
5-6, RV.1 *~
As Reflected by the -II.70-78, 88 II.39, RII.17, ---
Quadrex Review Process Don Jordan's Competence II.79,'82, 86, 88- _ R I'I I . 5 - 6 i E---
89, 91-93 Current Section 50.55(e) II.80, 90, III.213- II.38, IV.1-7. X.1-18, I.H.1-16 Competence of HL&P 216 RV.1-2 Current Section ---
II.38, IV.1-7, X.1-18 I.H.1-16' 50.55(e) Reporting Program Jerome Goldberg's II.80, 90, III.213- RV.1-2 I.H.15 Section 50.55(e) 16 Competence Competence of Bechtel II.81, 94-95,.III. VIII.4, RII.76 I.C.3-4 Witnesses 217-218 Issue B/D-1,. Adequacy ---
IV.8-14, X.19-36 .I.I.1-20 of Backfill NRC Staff Updated Views ---
IV.15-17, X.37-46 I.J.1-10 on HL&P's Competence Conclusions Regarding ---
IV.18 I.J.ll' Current Competence of HL&P and its Contractors
c.
.: ^. ,
i:
SUBJECT:
'CCANP FOF APPLICANTSFOF NRC STAFF -FOF -
- 24. Responsibility of the II.83, 88,.III.219. --- ---
Partncrn
- 25. Motion to Recoen Re SLI, IV.1 --- ---
Inc.-Report
- 26. Conclusions of Law V.1-2. V.1-14, XI.1-3, RVII II.1-6 C. REOPENED PROCEEDING _
- 27. General Introduction and I.1-4 I.1-4 A.1-B.2~
Background to Reopened Proceeding
- 28. Purpose of Quadrex / II.10-12, 14, 15, II.5-10 C.4, 6, D.1-12, Review Generally- 25-26 E.1-3' Relationship to Phase I Hearing Preparation
- 29. STP Management Committee II.1-5, 15 III.ll, 22-23 C.1-8 Notes Generally
- 30. December 4, 1980 Manage- II.6-15 III.12-16 E.4-6 ment Committee Meeting Notes
- 31. February 19, 1981 Manage- II.lE-21 III.17-19 D.9, E.5-6 ment Committee Meeting Notes
For related findings see items 2 and 21 (" Purposes of Quadrex Review"), supra.
.a
~
- +. =- g gy ly
~ ~
~ '
~
, :4
- -c10-1-; -
SUBJECT CCANP VOF ' APPLICANTS ' FOF ; 'NRC STAFFLFOF
- 32, February 20, 1981 Manage-
--II.22-24 LIII.20-21 .E.5,. E.7 ment Committee Meeting Notes
'33. LBP-85-45 Scenario ---
IV;24-29 D.9-
- 34. Phase I Abdication of ---
V.26, 28,'31 D . 5 ', 10-11.
Responsibility Issue 35.-Conclusions on Reopened II.27-28, III.1 V.30-31 F.1,'II.
Proceeding Issues b
= - n
- ^ ,, fK
~
ADDendix A
' List of Phase II Witnesses and Prefiled Testimony Hitt' sal Prefiled Testimony Cited as David G. ' 11arker ' (no prefiled testimony)
Sidney'A. Bernsen Bernsen/Lopez, ff. Tr. 13441 Danny R. Carpenter Carpenter, ff. Tr. 15114
. John T. Collins (no prefiled testimony)
GeorgeLL. Constable Johnson and Constable, ff. Tr. 14846 Malter R. Ferris- Jordan, 11 A1., ff. Tr. 13645 Richard A. Frazar Frazar, ff. Tr. 14412 Donald L. Garrison Garrison, ff. Tr. 15110
'Jerome H. Goldberg- Goldberg, ff. Tr. 11491*
Robert F. Heishman Heishman, ff. Tr. 14846 (follows prefiled testimony of Robert G. Taylor)
Claude E. Johnson Johnson, ff. Tr. 15118 Eric H. Johnson Johnson and Constable, ff. Tr. 14846 Don D., Jordan Jordan, ff. Tr. 11908*
. Thomas J. Jordan Jordan, 11 A1., ff. Tr. 13645 Alfredo.Lopez Jordan, gi gl., ff. Tr. 13645 Frank Lopez Jr. Bernsen/Lopez, ff. Tr. 13441 George W. Oprea Oprea, ff. Tr. 14095**
- / 'Also testified on 12/5/85 without prefiled testimony.
[ **/ Also. testified on 12/6/85 without prefiled testimony.
2-s Witness Prefiled Testimony Cited as E. Shannon Phillips Phillips ( 5 0.55(e)),-ff. Tr.15116 Phillips (Quadrex), ff. Tr. 15192 Jesse Poston .(no prefiled testimony)
Cloin G.-Robertson (no prefiled testimony)
Donald E. Sells Sells, ff. Tr. 15190
'Loren Stanley Stanley, ff. Tr. 13047***
James R. Sumpter Sumpter, ff. Tr. 12699 Sumpter'(supplemental), ff.
Tr. 15357**
EJoseph I. Tapia Tapia, ff. Tr. 13752
- Robert G. Taylor Taylor, ff. Tr. 14846 (fo' lows prefiled testimociy of Johnson and constabile)
Dan'P. Tomlinson Tomlinson, ff. Tr. 15112 Charles G. Thrash (no prefiled testimony)****
~
Mark R. Wisenburg Wisenburg, ff. Tr. 14514
- / Also testified 12/6/85 without prefiled testimony.
- / Also submitted an affidavit dated December 12, 1985.
~****/ Also submitted an affidavit dated September 4, 1985.
a -
x Anoendix B List of Phase II Exhibits H2t* Descrintion Date Id. In Ev.
Anolicants' Exhibits 57' Handwritten notes re Quadrex 4/13/81 11466 11661 preliminary review
~
58 Memo from J.H. Goldberg to 4/15/81 11466 13050 J.R. Sumpter re Quadrex Review of B&R Engineering Problem Categorization, with handwritten notes.
59 ' Typed and handwritten notes 4/27/81 11466 11662 by C.G. Thrash of Management Committee Meeting
.60 Quadrex Report, " Design Review 5/81 11466 11487 of B&R Engineering for STP" 61 Letter from J.H. Goldberg to 5/6/81 11466 11487 E.A. Saltarelli re STP Quadrex Engineering Review 62 Letter from E.A. Saltarelli to 5/8/81 11466 11487 J.H. Goldberg enclosing B&R review of most serious findings for reportability 63- Bechtel Power Corporation 3/82 13442 13460 Report, "An Assessment of the Findings in the Quadrex Corpo-ration Report" 64 Bechtel Power Corporation 8/26/82 13463 Rej.
Final Work Package Report (13470) for Work Package EN-619,
" Review of the Quadrex Report"
- Various Exhibits have been admitted only for a limited purpose.
Accordingly, in each case, it is necessary to review the appropriate portion of the transcript to ascertain the scope of an Exhibit's admission.
l 2- I Hgt Descrintion Date Id. In Ev.
65- . Letter from L. Stanley to 3/16/81 13049 13049 J.R. Sumpter re STP ALARA review 66 Excerpt from STP Procedure 5/21/85 14515 14516 Manual Revisions on Reporting Design and Construction Deficiencies to NRC (PLP-02,
'Rev. 5) 66a PLP-02, Rev. 6' 7/25/85 14573 14574 67 Letter from J.H. Goldberg to 7/30/85 13646 13652 R.D. Martin re Supplemental
-Response / Clarification to the Response to Notice of Violation, Inspection Report 83-24 6 18 Letter from G.W. Oprea to 5/25/84 13646 13652 J.T. Collins're Programmatic Audit of Backfill Activities and Audit Summary 69 Handwritten notes re "New No Date 12163 12163 Cost.and Schedule" 70 One page excerpt of C.G. 6/26/81 12675 Hot ,
Thrash typed notes'of 6/26/81 Offered Management Committee Meeting (12675)
(p. 2143) 71~ Handwritten notes re ALARA 3/13/80 12904 12905 review 72 Letter from R.L. Ashley to 11/24/82 13470 13473 B.L. Lex re disposition of i Brown & Root and Quadrex comments On Bechtel Task Force Draft Report
! -73 Reports to NRC on Computer 14608 14809 Program Verification F
Letter from G.W. Oprea to 6/5/81
.! K. Seyfrit transmitting ist
. Interim Report concerning Computer Program Verification a
.e m r - ~ - - ---,-e .---.-nem e- , e.-,,--v,,w--,,, ,,m-n ---m-+ w,,,,-,n..,,n -.w-.--w--m-------n--n-e---+--,,---~----- , n--. - wnm-,
LM2a. Descrintion Egtg Id. In Ev.
Letter from G.W. Oprea to 8/27/81 '
K. Seyfrit transmitting 2nd j Interim Report concerning Computer Program Verification Letter from G.W. Oprea to 12/18/81 J.T.. Collins transmitting 3rd Interim Report concerning Computer Program Verification 7 Letter from G.W. Oprea to' 4/22/82 l J.T. Collins transmitting 4th Interim Report concerning Computer Program Verification Letter from G.W. Oprea to 9/.13/82 J.T. Collins transmitting 5th Interim Report concerning Computer Program Verification Letter transmitting 6th 12/22/82 Interim Report >
. Letter transmitting 7th 6/13/83 Interim Report s Letter transmitting Final 10/14/83 ';
Report -
74 Reports to NRC re HVAC 14809 14810 Letter from G.W. Oprea to 6/9/81 ;
K. Seyfrit transmitting .
- - +
lst Interim Report concern-
< ing HVAC' ,
Letter transmitting 2nd 7/29/81 %.
Interim Report Letter transmitting 3rd 10/23/81 Interim Report +
r Letter from G.W. Oprea 4/8/82 '
to J.T. Collins transmitting < ,
Final Report concerning the Fuel Handling Building HVAC Control Air System
+
- Her Descrintion Date 14 In Ev.
Letter transmitting 4th 5/26/82 i,'
' Interim Report l
Letter from G.W. Oprea to 8/6/82 J.T. Collins transmitting 5th Interim Report concern-gJ ing HVAC (isolation dampers)
Letter transmitting Final 10/20/82
, Ra' port concerning HVAC Letter transmitting Supplemental.5/17/84 y % Report concerning HVAC K 75 Letter'from G.W. Oprea to 6/5/81 14810 14810 c -K. Seyfrit transmitting Final Report concerning Shielding
' Analysis. Verification 76 SetterfromG.W.Oprea'to 9/9/82 14811 14811
.J.T. Collins transmitting Response to Notice of Violation 82-02 4
77 NRC Staff Response to 8/24/84 15025 15032
-Licensing Board Memorandum and' Order regarding the s Reportability of Quadrex Report 78 . Letter from E.H. Johnson tc 11/23/84 15032 15034**
s
-HL&P.re I&E 84-12
~
79 C.G. Thrash handwritten 12/4/80 -15397 15397 notes of STP Management Committee Meeting of 12/4/80 (typed transcription also included)
., 80 C.G.. Thrash handwritten 2/19/81 15397 15397
- l. notes of STP Management Committee Meeting of 2/19/81 (typed transcription also
~ included) 81 C.G. Thrash handwritten 2/20/81 15397 15397 notes of STP' Management Committee Meeting of 2/20/81 r (typed transcription also included)
a En Descriati.QA Date 1 51 In Ev.
i 82 Exhibits 2 and 3 to STP 12/4/80 15439 15441 Management Committee Meeting Minutes of 12/4/80 83 Exhibit 5 to STP Management 2/20/81 15429 15441 .
Committee Meeting Minutes l
.of 2/20/81 84 Excerpt of C.G. Thrash 7/18/84 15445 15450 deposition (pp. 1161-63) 85 Excerpts of D.G. Barker 11/80 15644 15686 handwritten notes of 11/80
- 86. Handwritten notes of L. 1/2/81 15696 Not Offered '
Stanley re 1/2/81 telephone conversation with J.R. Sumpter NRC Staff Exhibits 136 Special Inspection Report of 1/7/83 14848 14849 the Quadrex Corporation, Report on Design. Review of Brown and Root Engineering Work for the South Texas Project Units 1 -
and 2.--NUREG-0948.
137 Guidance - 10 CFR 50.55(e), 4/1/80 14847 14848 Construction Deficiency Reporting.
138 Quality Assurance Require- 1974 14860 14866 ments for the Design of Nuclear Power Plants--ANSI N45.2.11-1974.
139 fD.S. NRC Regulatory Guide 6/76 14862 14863 1.64--Quality Assurance Requirements for the Design of Nuclear Power Plants (Rev. 2).
140 . Letter from G.L. Madsen to 6/3/82 14863 14864 to G.W. Oprea enclosing -
Investigation Report 82-02.
ML, Descrintion Data M. In Ev.
141 Letter from G.L. Madsen to 8/11/82 14864 14865 G.W. Oprea enclosing Notice of Violation 82-02.
142 STP Engineering Procedures no date 15119 15120 Manual STP-DC-021-D Engineer-ing Procedure for Engineering Design Deficiencies.
143 General Project Requirements 6/1/84 15120 15120 Reporting Significant Defi-ciencies, Federal Regulation 10 CFR Part 50.55(e) (Bechtel 2.20).
'144 Review of Nonconformance 5/22/85 15123 15123 Reports for Deficiency Evaluation WPP QCI 5.3 (Rev. 7).
145 PLP-02, Reporting Design and 5/21/85 15123 Withdrawn Construction Deficiencies to (15125)
NRC (Rev. 5).
146 PSQP-A8, Trend Analysis 2/15/82 15125 15127 Administration (Rev. 3).
147 PSQP-16.3, Project Specific 3/19/85 15126 15126 Quality-Assurance Procedure, Trend Analysis (Rev. 3).
CCANP Exhibits 71 Memorandum from D.G. Barker 6/12/81 11501 12052 to C.G. Robertson re Procedure Deviations Concerning Reportable Deficiencies (including attachments).
72 Section 3 of-B&R's Quality no date 14186 14450 Assurance Manual (in effect -
in May 1981) 73 Letter from J.H. Goldberg to 2/2/81 11615 11620-21 E.A. Saltarelli re in-depth review of B&R technical activities on STP by Quadrex.
A Descrintion Date 1 51 ID_EYa 74 Handwritten notes by L. 3/18/81 11624 11639
. Stanley for briefing of HLP re-Quadrex.
75 B&R Assessment of the 4/82 11789 12023 Quadrex Design Review of the STP (excerpt Quadrex Finding No. 4.1.2.1(b)).
76 Memorandum from D.D. Jordan. 6/3/81 11956 11960 to STP Nuclear File re meeting on 6/3 with Tom Feehan regarding Gibbs &
Hill letter of intent and B&R's recruiting efforts.
77- Memorandum'from D.D. Jordan 9/15/81 11975 11977 to STP file re meeting with project partners and with
. Tom Feehan.
78 Handwritten note to Mr. 9/11/81 11977 11985 Jordan by G.W. Oprea transmitting attached draft STP Report on Contractor Replacement dated 9/8/81.
79 Handwritten notes of D.D. no date 12007 12013 Jordan re percent complete.
80 Handwritten notes of D.D. 9/18/81 12014 12018 Jordan for meeting with Jack Harbin.
81- Excerpt from B&R Quadrex 4/82 12027 12030 !
Assessment te Quadrex Finding No. 4.3.2.l(n).
82 Quadrex Findings Previously no date 12064 Not-Reported Under 10 CFR 50.55 Offered (e). (12076-77) 83 Meeting Minutes re 9/22/81 12217 12381 l discussions among STP t participants regarding replacement of' Architect /
Engineer and Construction Manager.
I
l H22 Descriotion Date Id. In Ev.
84 . Excerpt from B&R Quadrex 4/82 12277 12284 Assessment re Quadrex Finding No. 4.8.2.1(g).
85 L. Sinkin drawings numbered no date 12292 Not 1-6.- Offered (12329-30) 86 Letter from J.H. Goldberg 4/7/82 12332 12404 to D.W. Halligan re HLP Comments on Bechtel Task Force Report South Texas Project Electric Generating Station.
87 Statement by J. Goldberg to 2/9/82 12337 12338 D.D. Driskill and J.E.
Gagliardo concerning Quadrex report (includes handwritten changes).
88 Slides for Quadrex no date 12342 12345 presentation.
89 Handwritten notes by J.H. no date 12423 12424 Goldberg re STP Quadrex Engineering Review.
90 Excerpt from J.H. Goldberg 10/84 12479 12481 PUC Cross Examination pp.
1355-58.
91 Excerpt from J.H. Goldberg 10/84 12486 Not PUC Cross Examination pp. Offered 1374-80.
92 Excerpt of Pla.ntiff's 12/17/84 12707 Not Specification of Claims Offered and Issues (cover and pages (12742) 31-39).
93 Letter from J.L. Hawks to 3/20/81 12756 12760 J.L. Blau re Engineering review of B&R.
94 Memorandum from A.B. Poole 3/31/81 12786 12787 to M.E. Powell re Primary and Secondary Stress Intensity of 3.35m for Upset Loads.
a - .- . - - - . .
HQt Descrintion Date Id. In Ev.
95 Memorandum from M.E. Powell 4/27/81 12788 12794 to L.R..Jacobi re IRC Meeting concerning the Primary and Secondary Stress Intensity for Upset Loads in the Design of the Containment Mechanical Penetrations M9, M13 and M17; April 24, 1981 (item #93).
96 Memorandum from J.A. 5/8/81 12799 Rej.
Signorelli to D. Prelewicz (14614) re Quadrex STP Review (attached Nuclear Analysis questions).
'n 97 Memorandum from D.A. 5/11/81 12800 Rej.
Prelewicz to J.A. Signorelli (14614) re NUS Responses to Quadrex STP Review.
98 ' Handwritten statement of Jim 2/10/82 12861 12863 Sumpter to D.D. Driskill re Quadrex Review.
99 Letter from L. Stanley to L. 11/12/83 13051 Rej. 4 Sinkin responding to 11/8 (13053) inquiry regarding Stanley participation in ASLB hearings.
100 Letter from L. Stanley to 1/5/81 13058 13061 J.R._ Sumpter responding to request for audit.
101 Letter from J.R. Sumpter to 1/27/81 13061 13063 L. Stanley authorizing-Quadrex review.
102 " Engineering Review Schedule" no date 13069 Not
--2/10/81-4/2/81 Offered (13070) 103 Letter from L. Stanley to 2/13/81 13070 13071 J.R. Sumpter outlining format for Quadrex review.
~
'104 Letter from L. Stanley to 3/2/82 13128 13309 R.L. Ashley re draft Bechtel Task Force Report.
H2m Descriotion Date Id. In Ev.
105 Letter from L. Stanley to 5/18/81 13205 Not J.L. Wray re HLP/B&R 10CFR21 Offered Reporting Requirements, and I attached memo. .
106 Cover letter from T.J. 10/4/84 13680 13681 Jordan to L.W. Hurst l transmitting STP audit report no. Cll-401, with CAR G-508 attached.
107 Closed version of CAR G-508. 10/24/84 13683 13683 (HL&P closure date) 108 STP Management Committee 2/19-20/81 14104 14107**
Meeting Minutes of February 19-20, 1981.
109 STP Management Committee 3/19-20/81 14110 14113** -
Meeting Minutes of March 19-20, 1981 110 STP Management Committee 4/27/81 14115 14117**
Meeting Minutes of April 27, 1981 111 STP Management Committee 6/26/81 14122 14125**
Meeting Minutes of June 26, 1981 (including meeting exhibit 13) 112' Excerpts of C.G.-Thrash type- 6/26/81 14125 14133**
written and handwritten notes of STP Management Committee Meeting of 6/26/81 113 STP Management Committee 7/23-24/81 14142 14243**
Meeting Minutes of July 23-24,.1981 (including meeting exhibit 9) 114 Excerpt of J.B. Poston 4/27/81 '14291 Rej.
handwritten notes of 4/27/81 (14290)
Management Committee Meeting 115 Letter to Karl Seyfrit 10/16/81 14306 Not from G.W. Oprea re STP Offered Safety Related Activities to continue during Transition Phase (including attachments A and B).
HQt Descrintion Qata Id. In Ev.
116 Handwritten notes of George undated 14314 14322 Oprea for 7/2/81 Oprea, Goldberg, Saltarelli and Rice meeting.
' 117 . Letterfrom J.R. Newman to 9/8/81 14326 14327 G.W. Oprea transmitting draft report on contractor replace-ment for architect-engineering
- and construction management services at STP.
118 Agreement'Not To Assert 12/28/79 14330 14349
-Certain Defenses (Executed Tolling Agreement).
119 - Handwritten notes of G.W. undated 14339 Rej.
. Oprea of September meetings. (14347) 120 Meeting minutes of 9/15/81 9/22/81 14350 14370**
- meeting re possible Replacement of B&R as engineer and construction manager. ,
121 Confidential B&R office memo 9/22/81 14371 14837 from K.M. Broom to W.M. Rice re Telephone call to George Oprea of 9/22/81.
122 Statement of G.W. Oprea to 2/12/82 14377 14377 D.D. Driskill re B&R and the.Quadrex Report.
123 Letter from R.A. Frazar to 9/27/79 14423 14429 T.H. Gamon re Audit of B&R
-Engineering, Audit No. BR-28 (transmittal letter).
Memorandum from T.D. Stanley 10/1/79 to D.G. Barker re Audit No.
BR-28.
Memorandum from R.A. Frazar 10/1/79 to E.A. Turner re Audit No. BR-28 (transmittal letter). '
l Audit No. BR-28 9/4-7/79 4
9 4
.,r, __ , , . . , . . _ _ _ , _ _ _ , , _ _ _ , _ _ _ . _ _ ,_._,___-._,_.._,-_,_,_,,.__m -
12 -
Hgt Descrintion Date Id. In Ev. ,
Letter.from R.A..Frazar to 12/26/79
, T.H. Gamon re B&R response
-to Audit BR-28 (with attachments). l l
Memorandum from D.R. Valley- 2/31/80. ;
to:T.D. Ste-ley re Resolution.
of Audit Findings.of,B&R Audit No. BR-28.
^
124 Memo;to R.L. Ulrey from B.J. 1/21/81 14430 Not Fite re Auditor's Handbook Offered on-Deficiency Reporting (including enclosure).
125 Letter from R.L. Ulrey to 10/24/80 14435 14444
-R.'J.-Vurpillat transmitting Audit No. BR-35.
Memo from R.L. Ulrey to G.W. 10/24/80 Oprea transmitting BR-35.
Audit No. BR-35. 9/22-26/80 126 HL&P QA Manual, Controlled Issued 14450 14453 Manual No. 70, with Phil D. 11/10/78 Franke noted as manual holder.
(excerpts from sections, 1 3 and 4 QA Program and South Texas QA Plan section 4) 126a Project Quality Assurance- 10/29/80 15367 15387 Plan Project Engineering Section 4.0 (Revs 5 & 6).
2127' ' C.G. Robertson handwritten 4/81 14591 14597 notes from April, 1981 128 Telephone Minutes from M.E. 5/8/81 14673 14674 Powell~to L.R. Jacobi documenting call from M.E.
Powell to W.A. Crossman notifying NRC of three
. potentially reportable items (HVAC, Computer Codes, Shielding Analysis).
129 Memo from M.E. Powell to 5/12/81 14675 14682
'L.R. Jacobi re Incident Review Committee Meeting Minutes of May 11, 1981 Meeting Concerning Computer
+,
..mr. , - ~ - , . ,, c._ .
, - - - - - - - - - - . . - - . ,-,-m,,
H2x Descriotion Date Id. In Ev.
Program Verification.
130 Memo from M.E. Powell to 5/13/81 14685 14687 L.R. Jacobi re Incident Review Committee Meeting Minutes of May 11, 1981 Meeting Concerning Inadequate Design of HVAC Systems.
131 Memo from M.E. Powell to 5/19/81 14687 14691
-L.R. Jacobi re Incident Review Committee Meeting Minutes of May 11,.1981 Meeting Concerning Verification of Shielding Analysis Calculations.
132 Memo from M.E. Powell to 6/4/81 14691 14695 L.R. Jacobi re Incident Roview Committee Meeting Minutes of June 1, 1981 Meeting Concerning Verifi-cation of Shielding Calculations.
133 Statement of Cloin G. 2/10/82 14704 14706 Robertson to D.D. Driskill re Quadrex.
134 Letter from J.T. Collins to 6/18/82 15005 15198**
G.W. Oprea re NRC Report 81-37 SALP Board Report and letter'from G.L. Madsen to G.W. Oprea enclosing SALP Report 81-37.
135 Letter from E.H. Johnson 11/25/83 15141 Not to G.W..Oprea re Report Offered a%., on NRC Inspection 83-21.
136 Letter from J.H. Goldberg 7/19/85 15148 15154 to R.D. Martin re First Interim Report Concerning Record Packages for the 125 Vdc and 4KV AC Systems.
1 l
.Hei Descrintion Daig Id. In Ev. i 1
1371 Evaluation of South Texas 4/85 15160 Not Project by Institute of Offered
. Nuclear Power Operations (INPO).
133 Memorandum for P.A. Bradford 12/15/81 15206 15320_
from W.J..Dircks re
. Chronology Related to The Quadrex Report on South
- Texas.
139. . Handwritten Notes from H.S. 8/27/81 15211 15211 Phillips to J. Collins re Design Engineering STP.
140 Memorandum for File From 9/11/81 15212 15214 W.G. Hubacek thru G.L.
Madsen and W.A. Crossman re
' Meeting with HLP Management
'Related to Quadrex Review
.of B&R Engineering.
141 Handwritten Notes of D.E. No date 15215 15219 Sells re potential 50.55(e) items and availability of Report.
142 Memorandum for D.G. Eisenhut 10/28/81 15219 Rej.
,from D.E. Sells'thru R.L. (15221)
Tedesco and F.J. Miraglia re Summary of Quadrex Report-STP.
143 Meeting Summary of Meeting 1/26/82 15232 Not on 1/18/82 with HL&P by D.E. Offered Sells.
144 Note to D.G. Eisenhut.from 1/26/82 15235 15428**
v D.E. Sells Thru R.L. Tedesco and F.J. Miraglia re Comments on South Texas Chronology.
145 Letter from E.H.-Johnson to 9/11/84 15293 Not G.W. Oprea re NRC Inspection Offered Report 84-11 (enclosure (15295) inspection report).
146 Letter.from G.W. Oprea to 9/18/81 15311 Not K. Seyfrit re Unlimited Re- Offered Start-for'ASME Welding and Safety-Related Complex Concrete.
t -
15 -
' ]kta, 'Descriotion h M. In Ev.
147 Testimony.of Nunzio J. 11/19/81 15321 Not Palladino before Subcommittee Offered on Energy.and-Environment of (15325)
Committee on Interior and Insular Affairs U.S. House of Representatives.
147a Oversight' Hearing--Cover 11/19/81 15330 15330 page and pages 92-95.
148 Handwritten chronology 6/26/81- *** ***
of D.D. Jordan . 12/15/81 of 6/26/81-12/15/81
- 'Only an excerpt from the Exhibits designated with "**" has been admitted into evidence.
- :This document was admitted by the Board in its Order of October
-16, 1985.
it 4
, . . - , - , , ,- - ~ - ., , . . -