ML20138P472

From kanterella
Jump to navigation Jump to search
Forwards Catawba Nuclear Station Diesel Engine 2B Component Revalidation Insp, Providing Results of Insp & Evaluations. Following Insp,Diesel 2B Experienced Failures of Main Bearing 7 During Return to Svc Testing
Date released: 05/31/2020 Download: ML20138P472


Diesel Engine 2B Component Revalidation Insp.
ML20138P480
Person / Time
Site: Catawba Duke Energy icon.png
Issue date: 12/17/1985
From:
DUKE POWER CO.
To:
References
Download: ML20138P480 (131)
Forwards Catawba Nuclear Station Diesel Engine 2B Component Revalidation Insp, Providing Results of Insp & Evaluations. Following Insp,Diesel 2B Experienced Failures of Main Bearing 7 During Return to Svc Testing
ML20138P469
Person / Time
Site: Catawba Duke Energy icon.png
Issue date: 12/23/1985
From: Tucker H
DUKE POWER CO.
To: DENTON H R, YOUNGBLOOD B J
Office of Nuclear Reactor Regulation
References
Download: ML20138P469 (1)