ML20138P479

From kanterella
Jump to navigation Jump to search
Significant Deficiency Rept SD-62 Re Improper Mounting & Installation of Fan Motors in Flakt-Bahnson Air Conditioning Units in Control Bldg.Initially Reported on 841107.Condition Not Reportable Per 10CFR50.55(e)
ML20138P479
Person / Time
Site: Millstone Dominion icon.png
Issue date: 10/21/1985
From: Opeka J
NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES
To: Murley T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
F0876A, F876A, SD-62, NUDOCS 8511070191
Download: ML20138P479 (2)


Text

. . .

NORTHEAST UTILITIES cenere Omces . semen sueet. Bernn. connecticut v c e nc ,.waoma w =,

9 *s, -m us eac=c ccw=,

P.O. BOX 270

.u m .cea .om a cc 'a' HARTFORD. CONNECTICUT 06141-0270 k L J C $$,"c , (203) 665-5000 October 21,1985 Docket No. 50-423 F0876A Dr. Thomas E. Murley Regional Administrator Region i U. S. Nuclear Regulatory Co;nmission 631 Park Avenue King of Prussia, PA 19406

Reference:

(1) W. G. Counsil letter to T. E. Murley, F0636 A, dated December 7,1984.

Millstone Nuclear Power Station, Unit No. 3 Reporting of Potential Significant Deficiencies in Accordance with 10CFR50.55(e):

Flakt-Bahnson Air Conditioning Units (SD-62)

In a November 7,1984 conversation between your Mr. T. Rebelowski and our Mr.

3. P. Putnam, Northeast Nuclear Energy Company (NNECO) reported a potent 21
ignificant deficiency in the construction of Millstone Unit No. 3 as required by 10CFR 50.55(e). The potential significant deficiency involved the improper mounting and installation of fan motors in Flakt-Bahnson air conditioning units in the control building. Unused and elongated mounting holes were found in the fan support structural steel. Failure of the air conditioning units could affect our ability to maintain proper operating temperatures for safety-related equipment in the control building,in accordance with our environmental design conditions.

Reference (1) reported the results of an evaluation of this potential significant deficiency against all appropriate design criteria. This evaluation determined that the condition did not affect the structural integrity of the air conditioning units and, therefore, would not cause these units to fail. This was determined not to be a significant deficiency for Millstone Unit No.3. Additionally, Reference 1 informed the NRC Staff of NNECO's intention to hold this significant deficiency open pending identification of further problems with the units.

NNECO has found no further problems with the Flakt-Bahnson units. NNECO, therefore, considers this potential significant deficiency closed.

Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY 8511070191 851021 PDR ADOCK 05000423 o " "