Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20115G466 + (ML20115G466)
- BECO-85-076, Application for Proposed Change 85-04 to License DPR-35, Decreasing Calibr Frequency for Certain Level & Pressure Transmitters Replaced During Recent Outage W/More Reliable Rosemount Transmitters + (ML20115G469)
- ML20115G470 + (ML20115G470)
- 0CAN079603, Provides Status Update Re Dissimination of Emergency Planning Info within 10-mile EPZ + (ML20115G472)
- ML20115G475 + (ML20115G475)
- ML20115G480 + (ML20115G480)
- ML20115G483 + (ML20115G483)
- ML20115G489 + (ML20115G489)
- ML20115G490 + (ML20115G490)
- ML20115G495 + (ML20115G495)
- ML20115G497 + (ML20115G497)
- ML20115G498 + (ML20115G498)
- ML20115G503 + (ML20115G503)
- ML20115G507 + (ML20115G507)
- ML20115G508 + (ML20115G508)
- ML20115G514 + (ML20115G514)
- AECM-85-0110, Forwards Grand Gulf Nuclear Station Unit 1 Emergency Procedures Upgrade Program,Procedures Generation Package, Per Generic Ltr 82-33,Suppl 1 to NUREG-0737 + (ML20115G515)
- ML20115G518 + (ML20115G518)
- ML20115G520 + (ML20115G520)
- ML20115G524 + (ML20115G524)
- ML20115G530 + (ML20115G530)
- ML20115G532 + (ML20115G532)
- ML20115G533 + (ML20115G533)
- ML20115G546 + (ML20115G546)
- ML20115G549 + (ML20115G549)
- ML20115G550 + (ML20115G550)
- ML20115G551 + (ML20115G551)
- ML20115G556 + (ML20115G556)
- ML20115G558 + (ML20115G558)
- ML20115G560 + (ML20115G560)
- ML20115G564 + (ML20115G564)
- RBG-20-584, Forwards,For Review,Revs to FSAR Sections Re Use of Portable Radios.Revs Will Be Included in Future FSAR Amend + (ML20115G568)
- ML20115G569 + (ML20115G569)
- ML20115G570 + (ML20115G570)
- ML20115G572 + (ML20115G572)
- ML20115G574 + (ML20115G574)
- ML20115G577 + (ML20115G577)
- ML20115G578 + (ML20115G578)
- ML20115G580 + (ML20115G580)
- LIC-96-0098, Informs That Sight Glasses on DG Fuel Oil Day Tanks Will Be Replaced by Sept 1996,based on Revised DG Outage Schedule + (ML20115G582)
- ML20115G584 + (ML20115G584)
- ML20115G586 + (ML20115G586)
- ML20115G597 + (ML20115G597)
- HL-2950, Responds to NRC Re Violations Noted in Insp Repts 50-321/92-20 & 50-366/92-20 & Enforcement Conference on 920916.Corrective Actions:High Radiation Doors Will Be Upgraded to Ensure Doors Have Automatic Closing Devices + (ML20115G603)
- ML20115G617 + (ML20115G617)
- NRC-92-0124, Forwards Endorsement 43 to Maelu Policy MF-0120 + (ML20115G622)
- 05000263/LER-1985-006-01, :on 850313,EFT Sys (Control Room HVAC) Transferred to Emergency Mode.Caused by Broken Hydrogen Chloride Monitor Tape.Tape Advanced Past Defective Area.W/ + (ML20115G628)
- ML20115G633 + (ML20115G633)
- 05000373/LER-1985-026-01, :on 850313,shutdown Cooling Header Pressure Switch Not Tested within Allowable Time Limits.Caused by Error in Identifying Proper Switch to Meet Tech Spec Requirements.New Requirements Added to Program + (ML20115G636)
- 05000482/LER-1985-001, :on 850313,16 & 19,containment Purge Isolation & Control Room Ventilation Isolation Signals Actuated During Initial Fuel Loading.Caused by Faulty Relay in Radiation Monitor.Relay Replaced + (ML20115G642)
- ML20115G646 + (ML20115G646)