Monthly Operating Rept for Feb 1985
ML20115G475
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 02/28/1985
From: Richardson M, Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Barry L
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
ANPP-32151-EEVB, NUDOCS 8504220212
Download: ML20115G475 (6)


Text

.

NRC MONTHLY OPERATING REPORT DOCKET NO. ___50-5_2 8_____

UN I T N AME___ PVNGS- l____

DATE___ 3[05 / 85 COMPLETED BY___ M.P_._ Rich _ardson .

TELEPHONE 602-932-5300

~ ~~

' _~ ~ E_ t ._5_ _3_ _ _

OEEg8IING SIBIUS

1. Unit Name: __Palo,Ve ge_ Nucle _aL enera G gn1 _t_a_t_iont_U_

S nit _1___

2. Reporting Period: __F_e_b rua r_y,19 85
3. Licensed Thermal Power (MWt): 3800
4. Nameplate Rating (Gross MWe): __1304_________________
5. Design Electrical Rating (Net MWe):__12ZO____________
6. Maximum Dependable Capacity (Gross MWe): _To_b_e__de t e rmine d
7. Maximum Decendable Caoacity (Net MWe): _ _ _To_b_e._ _d ele r_m_iDe d
8. If Changes Occur In Capacity Ratings (Items Number 3 Through 7) Since Last Recort, Give Reasons: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

N/_A

9. Power Level To Which Restricted, If Any (Net MWe):190_MWt_IQ_,We)
10. Reasons For Restrietions. I f Any : _LQW_fover_DneInting._Licenac_____

This Month Yr.-to-Date Cumulat ive

11. Hours In Reoorting Period _ _ _612_ _ _ _ _ __l416___.___ _14 L6._ _ _
12. Number Of Hourc Reactor Was Critical 0 0 0
13. Reactor Reserve Shutdown Hours _,____0_____ _ _ 0______ ____0___
14. Hours Generator On-Line 0 0 0
15. Unit Reserve Shutdown Hours 0 0 0
16. Gross Thermal Energy Generated 0 0 0 (MWH)
17. Gross Electrical Energy Generated 0 ____0__,____ 0 (MWH)
18. Net Electrical Energy Generated _____Q.____ ____S- __ _ _ _ _Q. _ _ _

(MWH)

19. Unit Service Factor __NL&____ _ _ _N/A _ _ _ _ _ _HLA___
20. Unit Availability Factor ___ NLA _ _ _H/A _ _ _. _ _ N LA_ _ __

g 21. Unit Capacity Factor (Using MDC __NL&____ ___N/L _____ _EL&__

No: Net)

22. Unit Caoacity Factor (Using DER _ _ _ ELA._ _ _ _ _ _ _ _N/A _ _ _ _ _ _ _ NLA_ _ _ _

@*b@

N 00 Net) on 23. Unit Forced Outage Rate _ _ pl& _ _ _ ___N/A _____ _ _ yL& _ _, _

03 0 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and N:s Duration of Each): _ _ _Hq.mi gnifkant_.g u t_qu_ g LqnDc d _unti l _af_t e t _ _ _ _ _ _ _ _ _ _ _ .

E walrranty._run_ W l8D.____._________.-_____________._.--_.. __________________

25. If Shutdown At End Of Reoort Period, Estimated Date of Startuo: _g/A_

N e

g 26 Unite ~5n~T7st-StatIt$ (prior To Commercial Ooeration):

~

Forecast Achieved INITIAL CRITICALITY _ _ _ .5185. _ _ _ _ ._ _ _ .H/L _ _ _ _ _ _ _

INITIAL ELECTRICITY ____6185.___ _ _ _ _N/L _ _ _ _ _ _ _

COMMERCIAL OPERATION _ _ _1_.118_5_ _ _ _ _ _ __N/L_______

;; t 7.. \

.) ,

l .

<  ?.

., )-

SUMMARY

OF OPERATING EXPgBJENCE EDB Idg MgNIH DOCKET NO.____jQ_l?J_______ _

U N I T _ _ _ _ _ __ _ _ _HN_G S, ,l_ __ __ _ _ _ __ _ _

v

',,_ .D AT E ___ _ ____ __,}/_Q'i/Jj_ ____ ____ ___

s 4-t, I COMPLETED BY__LP_u,RigitarJsga_____

. s TELEPHONE ____.6Q2,_9_32-5,10.D________

s .

. _____ Ext._J521__________

4 February 11, 1985' "B" Train' electrical outage established February 13, 1985 - Completed Reactor Coolant System (rcd) Fill and Vent pyricess i <

t February 16, 1985 - Comh.eted "E" Train electrical ootage L

February 25,1985 "A" Train electrical outage estiablished i

February 26, 1985 - Filled.the Spent Fuel Pool with borated water.

Spent Fuel Pool boron concentration 4090 ppm

)

j s

i f t- g k

i s

-a--- ,-, ,

~

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. JD-j23, UNIT _________1% K-l________

DATE_________3102M________

COMPLETED BY_LE,31shgutdaga_

TELEPHONE JD2-J132,-11QD_

-12 lum 91______

MQNTO: February 1985 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 _ _ ___ ___ 0 17 _ _ __ _ _ __ _ _ _g_ ___ _____ ___

2 0 18 ___________3______________

3 0 _

19 -= =____g______________

-4 __________0________________ 20 ___________S______________

5' __________Q--- =- ________ 21 _-_ -- . _=S______________

i v.

6 _________J1_ _ = _______

22 ___________fL_____________

i

. ,. 7 ._________J1_________=_ --

23 __- ____

___a______________

8 _________J1_______________ 24 ___________fL_____________

i 9 ___ Ja_______________ 25 ___________fL_____________

, r .

10 _________J1_______________ 2 6 _ _ _ _ _ _ _ _ _ _ _ IL __ _ _ _ _ _ _ __

11 __________Q_______________ 27'___________fL_____________

12 __________Q_______________ 28 ___________fL_____________

13 __________Q_______________ 29 _______-_-_. _____________ -

- 1 4 _ _ _ _ _ _ _ _ _ _Q _ _ _ _ = = _ _ =_____ 30 __________________________

15 __________Q_______________ 31 __________________________

16 __________Q_______________

4 1

r - - - - - - - - - _ - _ _ __ __

DOCKET 100. sn %9A UNIT SHUTDOWNS AND POWER REDUCTIONS PVNG4-1 UNIT NAMC DATE 3/05/RS . ,

COMPLETED BY M .12 R i c h n rds ort TELEPHONE ~ 9 U-5 400 vvr Asot Method or Shutting Down System Component Cause er Corrective 2 3 LER 4 5 Action to 1 Duration Code Prevent Recurrence Reason Reactor No. Code No. Date Type (Hours)

Not applicable - reactor N/A has not achieved initial criticality.

3 la 1 2 Method: ruhlblt F = Instructions F-Forced Reason: 1-Manual for Prnparation or Data S-Scheduled A-Equipment ralluro (Explain) 2-Hanval Sc ra m. Entry Sheets for Licensee D-Haintenance or Test 3-Automa tic Scram. [ vent Report (LER) File C-Rcrocling 4-Continuation from INUREC 0161)

D-Regulatory Restriction Prevfous Month E-Operator Training & License Examination 5-Redvetion or 20% 5 T- Adm in i s t ra t ive or Creator in the Exhibit H-Same Source C-Operational Error (Explain) Past 24 Hours H-Other (Explain) .

6-Other (Explain) 29tsou

?-

, 7

, REFUELING INFORMATION DOCKET NO.__ sn-528.______-

UNIT.,______. PVNGS 1,__________

D AT E__ _______ _3/D5 481__ __ _ _ _ _ _

COMPLETED BY_.}i.y. nichnraann __

TELEPHONE ____ 6n?-932- 5300______

__. F=xh _6593_____ __

1. Scheduled date for next refueling shutdown.

10/1/86

2. Scheduled date for restart following refueling.

11/19/86

3. Will refueling or resumotion of operation thereafter recuire a Technical Soecification change or other licenna amendment?

Not yet determined What will these be?

Not yet determined

4. Scheduled date for submitting prooosed licensing action and sucoorting information.

Not yet determined

5. Imoortant Licensing considerations associated with refueling,
e. g. new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new ooerating orocedures.

Not yet determined

6. The number of fuel assemblies.

a) I n t h e co re. _.241_ *,___________ .

b) In the scent fuel storage cool.____0________

7. Licensed spent fuel st ora g e ca pac i t y. ______1329______..

Intended change in scent fuel storage capacity. Nnnn

8. Projected date of last refuelina that can be discharned to spent fuel storage pool assuming cresent capacity.

2002 (w/ annual reloads and full core discharge capability).

N

, 2-Arizona Nuclear Power Project P.O. BOX 52034

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Unit 1 Docket No. STN 50-528, License No. NPF-34 February Monthly Operating Report File: 85-056-026; G.1.01.10

Dear Mr. Barry:

Attached please find the February, 1985 Monthly Operating Report prepared and sub-mitted pursuant to Specification 6.9.1.6 of Appendix A (Technical Specifications) to the Palo Verde Nuclear Generating Station, Unit 1 Operating License. By copy of this letter we are also forwarding a copy of the Monthly Operating Report to the Regional Administrator of the Region V Office.

Specification 6.9.1.6 requires the documentation of all challenges to the safety valves. No such challenges occurred during the reporting period.

If you have any questions or concerns, please conta'ct me.

Very truly ours CLLL n 'C E. E. Van Brunt, Jr.

Executive Vice President Project Director EEVB/GEC/mb Attachments cc: J. B. Martin w/a R. P. Zimmerman w/a E. A. Licitra w/a A. C. Gehr w/a If g