Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20115D215 + (ML20115D215)
- ML20115D219 + (ML20115D219)
- ML20115D224 + (ML20115D224)
- ML20115D226 + (ML20115D226)
- 05000254/LER-1992-020-02, :on 920921,determined That TS 3.7.A.2.a.2 Limit of 293.75 Scfh Exceeded.Cause of Excessive Leakages Cannot Be Determined Until Repairs Completed & Valves & Components Retested.Supplemental LER Will Be Issued + (ML20115D228)
- ML20115D229 + (ML20115D229)
- ML20115D230 + (ML20115D230)
- 2CAN109208, Summarizes 921008 Conference Call W/Nrc Re Results of Ninth Refueling Outage (2R9) SG Insps & Evaluations.During Insp of SG A,17 Circumferential Defects Detected at Top of Tubesheet of Hot Leg.No Cold Leg Indications Noted + (ML20115D242)
- ML20115D244 + (ML20115D244)
- 2CAN109207, Monthly Operating Rept for Sept 1992 for Ano,Unit 2 + (ML20115D252)
- 2CAN109205, Forwards Rept of Number of Plugged or Sleeved SG Tubes Accomplished During Inservice Insps on 921002.Complete Results of SG Tube Inservice Insp Will Be Provided in Annual Rept by 930301 + (ML20115D261)
- ML20115D263 + (ML20115D263)
- ML20115D264 + (ML20115D264)
- ML20115D266 + (ML20115D266)
- ML20115D270 + (ML20115D270)
- ML20115D277 + (ML20115D277)
- 0CAN079602, Forwards Response to NRC Re Weakness Noted in Insp Repts 50-313/96-17 & 50-368/96-17.C/A:discussed Correct Use of Notification Procedure Forms W/Communicator at Conclusion of CR Simulator Session on 960514 + (ML20115D283)
- 1CAN109202, Monthly Operating Rept for Sept 1992 for Ano,Unit 1 + (ML20115D284)
- ML20115D286 + (ML20115D286)
- L-90-012, Forwards Info Re code-rejectable Indications Found in Reactor Vessel Outlet nozzle-to-shell Welds,Per 900427 Telcon.List of Attendees from Telcon Encl + (ML20115D302)
- U-602055, Informs That Joseph C Wemlinger (License Number SOP-30504-1) No Longer Has Need for Operating License & Requests That License Status Be Changed to Expired + (ML20115D308)
- 0CAN079604, Provides 1996-1997 Rev of ANO Emergency Instructions & State & Local Emergency Plans,Including Annex V of State of Ak Emergency Operations Plan & Plans for Conway,Johnson,Logan, Pope & Yell Counties,Per Administrative Ltr 94-07.W/o Encls + (ML20115D311)
- ML20115D317 + (ML20115D317)
- LIC-96-0080, Forwards Diskette Containing PRA Model for Plant.W/O Encl + (ML20115D322)
- ML20115D323 + (ML20115D323)
- ML20115D337 + (ML20115D337)
- ML20115D344 + (ML20115D344)
- ML20115D348 + (ML20115D348)
- ML20115D351 + (ML20115D351)
- ML20115D361 + (ML20115D361)
- ML20115D368 + (ML20115D368)
- ML20115D369 + (ML20115D369)
- ML20115D388 + (ML20115D388)
- ML20115D402 + (ML20115D402)
- ML20115D406 + (ML20115D406)
- 05000298/LER-1992-015, :on 920911,RV Level Fell Below Low Level Setpoint Initiating Group 2,3 & 6 Isolations.Caused by Procedures Governing Normal Shutdown of Plant.Procedure Changes & Training Will Be Provided + (ML20115D442)
- ML20115D504 + (ML20115D504)
- ML20115D530 + (ML20115D530)
- ML20115D533 + (ML20115D533)
- ML20115D535 + (ML20115D535)
- ML20115D548 + (ML20115D548)
- ML20115D553 + (ML20115D553)
- RBG-20634, Forwards Interim Response to IE Bulletin 83-08, Electrical Circuit Breakers W/Undervoltage Trip Feature in Use in Safety-Related Applications.... Final or Interim Response Re Items 2b & 2d Will Be Provided by 850529 + (ML20115D557)
- HL-2976, Forwards Proposed Wording Revs to Licenses DPR-57 & NPF-5, in Response to 920918 Application for Amends.Revs Refer to Latest Rev Dates of Physical Security Plan,Guard Training & Qualification Plan & Contingency Plan,Per Telcons W/Nrc + (ML20115D566)
- ELV-04070, Forwards Proposed Wording Revs to Licenses NPF-68 & NPF-81, to Support 920918 Application for Amends to Licenses,Per Telcon W/Nrc.Wording Revs Refer to Latest Rev Dates in Physical Security Plan & Contingency Plan + (ML20115D570)
- 05000498/LER-1992-013, :on 920915,discovered That Portion of Containment Spray Channels Between Process Instrumentation & ESF Actuation Instrumentation Not Completely Verified.Caused by Inadequate Review.Procedures Revised + (ML20115D576)
- ST-HL-AE-4230, Forwards Rev 5 to Chapter 1.0 of South Texas Project Electric Generating Station Operations QA Plan, Organization. Change Will Be Incorporated in Next Operations QA Plan Update + (ML20115D579)
- ML20115D582 + (ML20115D582)
- ML20115D589 + (ML20115D589)
- ML20115D608 + (ML20115D608)
- ML20115D628 + (ML20115D628)