Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20099L529 + (ML20099L529)
- ML20099L530 + (ML20099L530)
- ML20099L537 + (ML20099L537)
- ML20099L538 + (ML20099L538)
- ML20099L540 + (ML20099L540)
- ML20099L543 + (ML20099L543)
- ML20099L544 + (ML20099L544)
- RBG-19-490, Provides Addl Info to Finalize SER Confirmatory Item 35, Table 1.3 Re Operator Info of Max Expected Errors for Water Level Measurements in Event of Drywell Heatup Normal Ambient Conditions + (ML20099L552)
- ML20099L554 + (ML20099L554)
- ML20099L558 + (ML20099L558)
- 05000247/LER-1984-019, :on 841022,fire Occurred in Insulation of High Pressure Turbine.Caused by Oil Leak Through Insp Cover.Fire Extinguished & Leak Repaired + (ML20099L561)
- ML20099L566 + (ML20099L566)
- ML20099L570 + (ML20099L570)
- ML20099L572 + (ML20099L572)
- ML20099L574 + (ML20099L574)
- ML20099L576 + (ML20099L576)
- ML20099L580 + (ML20099L580)
- ML20099L583 + (ML20099L583)
- ML20099L584 + (ML20099L584)
- ML20099L589 + (ML20099L589)
- ML20099L591 + (ML20099L591)
- ML20099L592 + (ML20099L592)
- ML20099L593 + (ML20099L593)
- ML20099L597 + (ML20099L597)
- ML20099L607 + (ML20099L607)
- ML20099L608 + (ML20099L608)
- ML20099L625 + (ML20099L625)
- ML20099L633 + (ML20099L633)
- ML20099L643 + (ML20099L643)
- U-602530, Attests That Util Has Completed Baseline Activities Required to Document Design Basis for Operation of Each GL 89-10 MOV at Facility + (ML20099L644)
- ML20099L657 + (ML20099L657)
- ML20099L661 + (ML20099L661)
- ML20099L667 + (ML20099L667)
- 2CAN129507, Requests Approval,Per 10CFR50.55a(a)(3) for Use of ASME Code Case N-533, Alternative Requirements for VT-2 Visual Exam of Class 1 Insulated Pressure-Retaining Bolted Connections, Section Xi,Div 1 by 960901 + (ML20099L673)
- 0CAN129504, Submits Info Re Manner in Which Basic Emergency Planning Info Disseminated to Public within ANO Plume Exposure Pathway Emergency Planning Zone During 1995 + (ML20099L679)
- ML20099L683 + (ML20099L683)
- 05000483/LER-1984-055, :on 841021,unplanned ESF Actuated Occurred Due to High Level Signal on Steam Generator A.Caused by Inadequate Preplanning.Procedure Rev Developed + (ML20099L691)
- ML20099L700 + (ML20099L700)
- RC-95-0319, Forwards Response to NRC Re Violations Noted in Insp Rept 50-395/95-17.Corrective Actions:Mechanical Adjustments to Dampers within Ventilation Sys Have Been Corrected + (ML20099L703)
- ML20099L706 + (ML20099L706)
- ML20099L714 + (ML20099L714)
- 05000346/LER-1984-015-01, :on 841025,discovered Velan Valve Disc Could Be Rotated W/Force by Hand to Cause Antirotation Stop on Disc to Ride Onto Hanger Arm Antirotation Stop.Caused by Antirotation Stop Design.Mechanism Modified + (ML20099L718)
- ML20099L719 + (ML20099L719)
- ML20099L721 + (ML20099L721)
- 05000458/LER-1995-010-02, :on 951130,reactor Thermal Power Limit Exceeded Due to Failure to Consider Required Heat Balance Inputs.No Recommended Corrective Actions Since All New Plant Designs Will Be Implemented as Mods + (ML20099L730)
- ML20099L744 + (ML20099L744)
- ML20099L747 + (ML20099L747)
- ML20099L757 + (ML20099L757)
- ML20099L765 + (ML20099L765)
- ML20099L772 + (ML20099L772)
- ML20099L780 + (ML20099L780)