Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 0CAN128305, Documents Results of Activities Conducted During 831031-1104 IE Insp to Review Open Items Re Emergency Planning. Commitment Status to Resolve Items Provided.Expeditious Actions by NRC to Remove Items Requested + (ML20087D531)
- ML20087D540 + (ML20087D540)
- ML20087D557 + (ML20087D557)
- W3P84-0568, Confirms That All Sqrt Files Closed.Info Adequate to Close Out Seismic Qualification Issue + (ML20087D567)
- ML20087D568 + (ML20087D568)
- ML20087D570 + (ML20087D570)
- RBG-16-955, Responds to NRC Re Violations Noted in IE Insp Rept 50-458/83-20.Corrective Actions:Fsar Changed Per Change Notice F8.3.9,Rev 1,to Accurately Reflect Loading Calculation + (ML20087D574)
- ML20087D577 + (ML20087D577)
- 05000318/LER-1981-030-03, Discovered Temp Transmitter 122HB Out of Tolerance in Nonconservative Direction.Caused Two Oscillators Producing Noise on Transmitter Output.Transmitter Replaced + (ML20087D580)
- ML20087D583 + (ML20087D583)
- ML20087D588 + (ML20087D588)
- ML20087D595 + (ML20087D595)
- BSEP-95-0161, Requests Relief from ASME B&PV Code,Section XI for Plant, Units 1 & 2 + (ML20087D596)
- ML20087D602 + (ML20087D602)
- HL-4899, Discusses ITS Implementation for Ei Hatch Nuclear Plant + (ML20087D603)
- 3F0895-04, Forwards ASME Section XI Pump & Valve Program Inservice Inspection, for Crystal River Unit 3 + (ML20087D609)
- ML20087D610 + (ML20087D610)
- ML20087D611 + (ML20087D611)
- ML20087D614 + (ML20087D614)
- ML20087D621 + (ML20087D621)
- ML20087D624 + (ML20087D624)
- ML20087D626 + (ML20087D626)
- ML20087D632 + (ML20087D632)
- 05000416/LER-1984-003, :on 840210,while Power Removed from Control Room Fresh Air Unit Chlorine Detector B,Per Maint Work Order,Unit Started Up Automatically in Isolation Mode.Caused by Personnel Error.Personnel Counseled + (ML20087D636)
- ML20087D639 + (ML20087D639)
- ML20087D640 + (ML20087D640)
- ML20087D643 + (ML20087D643)
- ML20087D651 + (ML20087D651)
- ML20087D656 + (ML20087D656)
- ML20087D662 + (ML20087D662)
- 0CAN018403, Submits Response to Hakney Request for Addl Info Re Emergency Plan Training for non-util Employees.Vendors & Contractors W/Unescorted Access within Protected Area Receive Training Commensurate W/Job Assignments + (ML20087D668)
- ML20087D671 + (ML20087D671)
- ST-HL-AE-1057, Final Deficiency Rept Re Reactor Containment Bldg post- Tensioning Sys Tendons.Initially Reported on 830826.Damaged Tendons Will Be Replaced.Tendons Will Be Mfg in Time Frame to Preclude Need for long-term Storage + (ML20087D685)
- ML20087D687 + (ML20087D687)
- ML20087D688 + (ML20087D688)
- ML20087D689 + (ML20087D689)
- ML20087D694 + (ML20087D694)
- RBG-17137, Forwards Addl Info Re Generic Ltr 82-33, Suppl 1 to NUREG- 0737 - Requirements for Emergency Response Capability. Info Suppls Emergency Operating Procedures Generation Package Submitted 830831 + (ML20087D695)
- ML20087D697 + (ML20087D697)
- ML20087D700 + (ML20087D700)
- ML20087D706 + (ML20087D706)
- ML20087D707 + (ML20087D707)
- ML20087D708 + (ML20087D708)
- ML20087D709 + (ML20087D709)
- HL-5010, Monthly Operating Repts for Jul 1995 for Edwin I Hatch Nuclear Plant,Units 1 & 2 + (ML20087D710)
- ML20087D711 + (ML20087D711)
- 05000348/LER-1995-006-01, :on 950710,licensed Matl Was Shipped to Incorrect Destination by Common Carrier.Fnp Contacted Owner & Verified Receipt Following Shipment of Licensed Matl + (ML20087D713)
- B11066, Forwards Amend 7 to Fsar.List of Responses to NRC Requests for Addl Info & Transmittal & Receipt Form Encl + (ML20087D730)
- ML20087D736 + (ML20087D736)
- ML20087D740 + (ML20087D740)
- ML20087D745 + (ML20087D745)