Omaha Public Power District 1623 Hamey Omaha. Nebraska 68102 402/536-4000 March 9, 1984 LIC-84-062 l
Mr. James R.
Miller, Chief U.
S.
Nuclear Regulatory Commission Office of Nuclear Regulatory Regulation Division of Licensing Operating Reactors Branch No. 3 Washington, D.C.
20555
Reference:
Docke t No. 50-285
Dear Mr. Miller:
Radiological Effluent Technical Specifications (RETS) l l
Your January 4, 1984 letter accurately summarized many re-l views, discussions, meetings, and correspondence which have i
transpired since the submittal of our original RETS proposal I
on March 30, 1979.
Although much progress has been made in the interim five years to resolve differences and design an effective program, this complex and many faceted project cannot be satisfactorily resubmitted within the sixty days requested in your January 4, 1984 letter.
Over the last two months, the District has assessed the possible economic impact of the RETS issue.
The attached schedule for another submittal is based upon the resu)ts of that assessment and the District's manpower requirements for the 1984 refueling outage.
l 00 [
8403130458 840309 PDR ADOCK 050002Gg
[g P
45 5124 Employment with Equ =100portunity Male / Fem.e
A Mr. James R. Miller b
LIC-84-062 Page Two
'The District desires that the next submittal contain specifi-cations which will resolve the remaining issues for RETS re-lating to the Port Calhoun Station.
This submittal will in-clude those Technical Specifications, in accordance with Draft 7 of NUREG-0472, which the District believes will re-duce effluents from the Fort Calhoun Station and further will satisfy the requirements of 10 CFR 50.36a.
Sincerely,
(.
O $.(f
. Jones Division Manager L
Production Operations WCJ/KJM:jmm Attachment.
cc:
LeBoeuf, Lamb, Leiby & MacRae 1333 New Hampshire Avenue, N.W.
^
Washington, D.C.
20036 Mr.
E. G. Tourigny, Project Manager Mr.
L. A.
Yandell, Senior Resident Inspector
L Attachment i
OMAHA PUBLIC POWER DISTRICT RADIOLOGICAL EFFLUENT TECHNICAL SPECIFICATIONS SCHEDULE Description Date 1.
Submittal of proposed Technical Speci-July 20, 1984 fication changes incorporating radio-logical effluent monitoring and sur-veillance requirements conforming to dose design objectives of Appendix I, 10 CFR 50, to the NRC.
2.
Submittal of proposed manual dose July 20, 1984 evaluation program (DEP) containing the methodology.and parameters equiva-1-
-lent to offsite dose calculational manual objectives to the NRC.
3.
Availability of a formal radwaste August 10, 1984 solidification program (RSP) at the i
Fort Calhoun Station containing oper-ating procedures detailing the sampling, analysis, and evaluation methods equivalent.to process control program objectives.
-4.
- Implementation of Radiological Ef-Sixty days after
. fluent Technical Specifications, DEP, receipt of issued and RSP.
Facility Operating License change and revised Technical Specifications.
7