Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20072F275 + (ML20072F275)
- ML20072F278 + (ML20072F278)
- ML20072F279 + (ML20072F279)
- ML20072F280 + (ML20072F280)
- ML20072F284 + (ML20072F284)
- ML20072F285 + (ML20072F285)
- ML20072F286 + (ML20072F286)
- ML20072F290 + (ML20072F290)
- 05000366/LER-1983-031-01, /01T-0:on 830530,while Performing Fuel Movement Operation Procedure (HNP-2-9302),11 Fuel Assemblies Discovered Loaded Out of Proper Core Orientation.Caused by Personnel Error.Individual Counseled + (ML20072F293)
- ML20072F294 + (ML20072F294)
- ML20072F299 + (ML20072F299)
- ML20072F302 + (ML20072F302)
- ML20072F305 + (ML20072F305)
- ML20072F309 + (ML20072F309)
- ML20072F325 + (ML20072F325)
- ML20072F326 + (ML20072F326)
- ML20072F330 + (ML20072F330)
- 05000272/LER-1983-023-01, /01T-0:on 830602,notification Received from Westinghouse Re Potential Increased Power Peaking in Bottom of Core.Procedures Will Be Implemented to Insure Operation within Tech Spec Limits + (ML20072F333)
- ML20072F337 + (ML20072F337)
- AECM-83-0352, Final Deficiency Rept PRD-83/07 Re Two Div II Cables Improperly Routed Outside Scheduled Conduit.Initially Reported on 830412.Design Change Package Issued to Rework Cables.Also Reportable Per Part 21 for Unit 1 + (ML20072F339)
- ML20072F340 + (ML20072F340)
- ML20072F341 + (ML20072F341)
- ML20072F345 + (ML20072F345)
- ML20072F346 + (ML20072F346)
- ML20072F347 + (ML20072F347)
- ML20072F348 + (ML20072F348)
- ML20072F350 + (ML20072F350)
- ML20072F354 + (ML20072F354)
- ML20072F359 + (ML20072F359)
- ML20072F360 + (ML20072F360)
- ML20072F364 + (ML20072F364)
- ML20072F366 + (ML20072F366)
- ML20072F373 + (ML20072F373)
- ML20072F376 + (ML20072F376)
- ML20072F378 + (ML20072F378)
- ML20072F381 + (ML20072F381)
- ML20072F382 + (ML20072F382)
- 05000338/LER-1983-041-03, /03L-0:on 830606,following Reactor Trip from 100% power,I-131 Dose Equivalent Exceeded 10 Mci/G.Caused by Fuel Element Defect in Reactor Core.Accelerated Sampling Frequency Implemented + (ML20072F384)
- 05000348/LER-1983-026-03, /03L-0:on 830526,containment Particulate Activity Monitor R-11 Declared Inoperable.Caused by Vacuum Pump Failure.Monitor Declared Operable Following Alignment to Alternate Pump.Inoperable Pump Replaced + (ML20072F386)
- ML20072F387 + (ML20072F387)
- ML20072F388 + (ML20072F388)
- ML20072F390 + (ML20072F390)
- NG-83-0731, Provides Revised Public Info Brochures Currently Being Distributed to General Public within 10-mile Plume Exposure Emergency Planning Zone + (ML20072F391)
- 05000296/LER-1982-064-03, Radiochemcial Lab Personnel Discovered Inlet Sample Hose on 3-90-250 Turbine & Reactor Zone Exhaust CAM Disconnected.Cause Unknown.Hose Reconnected + (ML20072F392)
- ML20072F395 + (ML20072F395)
- ML20072F396 + (ML20072F396)
- ML20072F398 + (ML20072F398)
- ML20072F400 + (ML20072F400)
- ML20072F403 + (ML20072F403)
- ML20072F404 + (ML20072F404)
- ML20072F406 + (ML20072F406)